857.3 857.4(e) Control Products (RECP), as specified in Section 806.2(a), to establish vegetation in a wet weather channel as directed.
857.4MEASUREMENT AND PAYMENT —
Aggregate backfill, if used, is incidental to the work.
858.1 858.4( b)
858.1DESCRIPTION —This work is furnishing, placement, and maintenance of a geocell confinement
system for slope erosion protection.
858.2MATERIAL —Use geocell as specified in Section 737
858.3CONSTRUCTION —Construct as indicated and as follows:
configuration until ready to install. Place and expand the geocell sections on the geotextile with the longer dimension up and down (parallel with the slope direction) the side slope. Place geocell section flush or slightly lower than the adjacent terrain or final grade. Anchor as indicated. Mechanically fasten adjacent sections using wire staples or hog rings as shown on the shop drawings. Align abutting external cells at contact points and keep top edges flush before fastening. Place backfill material flush with the top of cells, as indicated. Do not operate equipment on finished subgrade, geotextile, unfilled geocell sections, or uncompacted backfill, except compaction equipment.
completed. Maintenance includes regrading of washed -out areas and replacing fill material, reseeding, and mulching, as directed as specified in Section 105.13.