ROADSIDE DEVELOPMENT

854TEMPORARY SLOPE PIPE

PA · 2026 Standard Specifications✓ Full text on BuildSpecBook pages 781–0 Save this section

Ask about Section 854

Get a cited answer from the section text. Click the citation to check it.

One cited answer a day is free. Start a 14-day trial for unlimited, no card required.

854.1DESCRIPTION—This work is construction of a temporary slope drainage facility.

854.2MATERIAL—

• End Section. Section 616.2

• Pipe (Inlet and Outlet). Section 601.2

• Fill Slope Pipe. Plastic, metal, or flexible rubber pipe of acceptable quality.

• Geotextiles, Class 4, Type A. Section 735

854.3CONSTRUCTION—As shown on the Standard Drawings and as follows:

Construct the berms of suitable compacted embankment material, as specified in Section 206.3. Construct the inlet end to channel water into the temporary drain. Use a slope pipe that can easily be moved, with the length varying, as necessary, to reach a suitable discharge area. Place the discharge end so the outlet water does not cause erosion. Place geotextiles, Class 4, Type A, at the discharge end of the pipe; if necessary, use rock, to prevent erosion. Place fabric, as specified in Section 212.3(c). Remove and satisfactorily dispose of pipes and end sections if they are no longer required.

854.4MEASUREMENT AND PAYMENT—Each

Get an email when 854 changes

Pennsylvania revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.

Source: Publication 408 Highway Construction Specifications, 2026 Edition. Pages 781–0 of 1,522. View official source ↗

Ask about this section

Scoped to Pennsylvania Publication 408 — Specifications, Section 854 — TEMPORARY SLOPE PIPE. Every answer cites the section it came from, with a verification date — don’t trust a percentage, click the citation.