854.1DESCRIPTION—This work is construction of a temporary slope drainage facility.
854.2MATERIAL—
• End Section. Section 616.2
• Pipe (Inlet and Outlet). Section 601.2
• Fill Slope Pipe. Plastic, metal, or flexible rubber pipe of acceptable quality.
• Geotextiles, Class 4, Type A. Section 735
854.3CONSTRUCTION—As shown on the Standard Drawings and as follows:
Construct the berms of suitable compacted embankment material, as specified in Section 206.3. Construct the inlet end to channel water into the temporary drain. Use a slope pipe that can easily be moved, with the length varying, as necessary, to reach a suitable discharge area. Place the discharge end so the outlet water does not cause erosion. Place geotextiles, Class 4, Type A, at the discharge end of the pipe; if necessary, use rock, to prevent erosion. Place fabric, as specified in Section 212.3(c). Remove and satisfactorily dispose of pipes and end sections if they are no longer required.
854.4MEASUREMENT AND PAYMENT—Each
Get an email when 854 changes
Pennsylvania revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.