871SEDIMENT TRAP - RISER

PA · 2026 Standard Specifications✓ Full text on BuildSpecBook pages 803–0 Save this section

Ask about Section 871

Get a cited answer from the section text. Click the citation to check it.

One cited answer a day is free. Start a 14-day trial for unlimited, no card required.

871.1DESCRIPTION—This work is the construction, maintenance, and removal and/or conversion of riser

type sediment trap to a permanent stormwater management facility.

871.2MATERIAL—

(a)Embankment. Section 206.2(a)
(b)Pipe. Section 601.2 (for the type indicated)
(c)Outlet Protection: Rock. Section 851.2
(d)Temporary Baffle Wall. Section 873.2
(e)Cleanout Stake. 2-inch by 2-inch, Spruce/Pine/Fir, Construction Grade, of the length required, or

other approved material of adequate size and length.

(f)Temporary Riser Pipe Assembly. Section 874.2 (where indicated)
(g)Concrete Outlet Structure. Section 875.2 (where indicated)
(h)Emergency Spillway. (Where indicated)

• Rock. Section 850.2(a)

• Geotextile. Class 4, Type A. Section 735

(i)Seeding and Soil Supplements. Section 804.2
(j)Mulch. Section 805.2

871.3CONSTRUCTION—As shown on the Standard Drawings, at the location indicated or directed, and

as follows: As specified in Section 201.3, clear and grub the storage area and embankment foundation area site. Excavate the key trench for the full length of the embankment (when located in permanent stormwater management facility) . Install the outlet protection, outlet pipe with the anti -seep collar attached (where indicated), and outlet structure at the location indicated. When indicated, construct the temporary riser pipe assembly, as specified in Section 874.3. When a concrete anti -seep color is specified, construct collar as specified in the applicable parts of Section 1001.3. When the sediment trap is located in a permanent stormwater management facility and a concrete outlet structure is indicated, construct concrete outlet structure as specified in Section 875.3. Construction of the embankment before placing the pipe is not required. Do not use coarse aggregate as backfill material around the pipe. Backfill the pipe with suitable embankment material to prevent embankment leakage along the pipe. Construct outlet protection of the type indicated at outlet end of pipe, as specified in Section 851.3. Place the embankment material, as specified in Section 206.3. When required, obtain borrow excavation for the formation of the embankment, as specified in Section 205. Apply seeding and soil supplements, as specified in Section 804.3. Mulch, if required, as specified in Section 805.3. Install and maintain cleanout stake as required, as indicated, or as directed. Inspect sediment trap after each runoff event to assure that it continues to function properly. Remove accumulated sediment as specified in Section 861.3 and repair as required or as directed. When the tributary area to the sediment trap is stabilized or the sediment trap is no longer required, or if otherwise directed, satisfactorily recondition the site as follows:

• Temporary Sediment Trap: Fill in excavated areas, removing embankments, riser pipe assemblies, outlet pipe, and anti -seep collars, or as directed . Restore the areas as specified in Section 105.14. Satisfactorily dispose of removed materials.

• Sediment Trap located in a Permanent Stormwater Management Basin area: Remove accumulated sediment and restore sediment trap to final basin contouring as indicated, stabilize disturbed areas as indicated, remove temporary orifice covers, temporary stand pipes, affix permanent stormwater management features as specified in Section 875.3, as indicated, or as directed. Satisfactorily dispose of removed materials.

871.4MEASUREMENT AND PAYMENT—

(a)Class 1 Excavation. Section 203.4
(b)Temporary Riser Pipe Assembly. Section 874.4
(c)Pipe. Section 601.4

For the type indicated.

(d)Anti-Seep Collar. Each

For the type indicated.

(e)Embankment. Section 206.4
(f)Borrow Excavation. Cubic Yard

Section 205.4

(g)Seeding and Soil Supplements. Section 804.4

For the type indicated.

(h)Mulch. Section 805.4

For the type indicated.

(i)Concrete Outlet Structure. Section 875.4
(j)Outlet Protection: Rock. Section 851.4

For the type indicated.

(k)Rock. Cubic Yard

Section 850.4

(l)Geotextile. Square Yard

Section 212.4

(m)Cleaning of Sedimentation Structures. Section 861.4
(n)Temporary Baffle Wall. Section 873.4

Get an email when 871 changes

Pennsylvania revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.

Source: Publication 408 Highway Construction Specifications, 2026 Edition. Pages 803–0 of 1,522. View official source ↗

Ask about this section

Scoped to Pennsylvania Publication 408 — Specifications, Section 871 — SEDIMENT TRAP - RISER. Every answer cites the section it came from, with a verification date — don’t trust a percentage, click the citation.