ROADSIDE DEVELOPMENT

865SILT BARRIER FENCE

PA · 2026 Standard Specifications✓ Full text on BuildSpecBook pages 795–0 Save this section

Ask about Section 865

Get a cited answer from the section text. Click the citation to check it.

One cited answer a day is free. Start a 14-day trial for unlimited, no card required.

865.1DESCRIPTION—This work is furnishing, placement, maintenance, and removal of silt barrier fences

of the height indicated.

865.2MATERIAL—

(a)Geotextile. Class 3, Type A or B. Section 735
(b)Mesh Support. Metallic coated steel, 14.5 gage wire mesh, arranged in a maximum grid of 6 inches

by 6 inches, or an acceptable, equivalent plastic mesh.

(c)Posts. Of sufficient length for 18 -inch embedment in the ground. Either wood, nominal 2.0 inches

square; or steel, 1.25 -inch by 1.00 -inch T-section or equivalent; or acceptable plastic, with an equivalent section.

(d)Fasteners. No. 9 staples, 1.5-inch long, or tie wires, 17 gage steel, of appropriate length, acceptably

metallic coated.

(e)Ground Anchors. 1-inch by 2-inch by 12-inch wooden stakes or steel equivalent to anchor guy wire

as shown on the Standard Drawings.

(f)Guy Wires. No. 10 gage, galvanized, according to ASTM A392, Class II. Install as directed.
(g)Rock Filter Outlet.
1.AASHTO No. 1 Coarse Aggregate. Section 703.2
2.AASHTO No. 57 Coarse Aggregate. Section 703.2

865.3CONSTRUCTION—As shown on the Standard Drawings, with or without mesh support fencing, and

as follows:

(a)Installation. Excavate trench and install posts. Fasten the geotextile securely to the top of the mesh,

at a maximum spacing of 30 inches, and to the posts . Keep sag to a minimum. Extend the geotextile a minimum of 6 inches vertically along the front face of the excavated trench and a minimum of 6 inches along the bottom of the excavated trench, backfill the trench with the excavated soil, and compact.

(b)Maintenance. After installation, satisfactorily maintain the silt barrier fence. Periodically clean silt

barrier fence by tapping the dry geotextile from the downstream side. When directed, provide rock filter outlets to replace undercut and overtopped sections of the silt barrier fence. When the barrier fence is no longer needed, remove the fence , and restore the area as specified in Section 105.14.

865.4MEASUREMENT AND PAYMENT—

(a)Silt Barrier Fence. Linear Foot
(b)Silt Barrier Fence Replacement. If silt barrier fence is required to be replaced, the Department will

pay for it at the contract unit price for Silt Barrier Fence.

Sections that cite this one

Get an email when 865 changes

Pennsylvania revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.

Source: Publication 408 Highway Construction Specifications, 2026 Edition. Pages 795–0 of 1,522. View official source ↗

Ask about this section

Scoped to Pennsylvania Publication 408 — Specifications, Section 865 — SILT BARRIER FENCE. Every answer cites the section it came from, with a verification date — don’t trust a percentage, click the citation.