Roadside Development (800-899)

852PAVED ENERGY DISSIPATOR

PA · 2026 Standard SpecificationsBook pages 796800View official source ↗

866.1 866.4(b)

866.1DESCRIPTION —This work is furnishing, placement , maintenance , and removal of heavy duty silt

barrier fence .

866.2MATERIAL —

(a)Geotextile. Class 3, Type A . Section 735
(b)Posts . Of sufficient length for 36 inches embedment into the ground and 2 1/2-inch diameter

galvanized steel or aluminum .

(c)Fasteners. Tie wires, 17 gage steel, of appropriate length, acceptably metallic coated to fasten

geotextile to wire fabric .

(d)Wire Fabric and Components. Section 1110.01(a)
(e)Rock Filter Outlet.
1.AASHTO No. 1 Coarse Aggregate. Section 703.2
2.AASHTO No. 57 Coarse Aggregate. Section 703.2

866.3CONSTRUCTION —As shown on the Standard Drawings , as indicated, and as follows:

(a)Installation. Excavate trench and install posts. Provide drive anchors when required or as directed

by the Representative. Fasten the geotextile securely to the top of the wire fabric , at a maximum spacing of 24 inches and to the posts. Keep sag to a minimum. Extend the geotextile and wire fabric a minimum of 8 inches into the excavated trench backfill the trench with the excavated soil , and compact .

(b)Maintenance. After installation, satisfactorily maintain the heavy -duty silt barrier fence. Periodic ally

clean heavy duty silt barrier fence by tapping the dry geotextile from the downstream side. When directed, provide rock filter outlets to r eplace undercut and overtopped sections of the heavy -duty silt barrier fence . When the fence is no longer needed, as directed, remove the fence , and restore the area as specified in

866.4MEASUREMENT AND PAYMENT —

(a)Heavy Duty Silt Barrier Fence. Linear Foot
(b)Heavy Duty Silt Barrier Fence Replacement. If silt barrier fence is required to be replaced, the

Department will pay for it at the contract unit price for Heavy Duty Silt Barrier Fence.

867.1 867.2(b)

867.1DESCRIPTION —This work is furnishing, placement , and maintenance of a compost filter sock

erosion and sedimentation pollution control system .

867.2MATERIAL —

(a)Compost. Provide w ell-decomposed, stable, weed -free, organic compost derived from agriculture,

food, stump grindings, and yard or wood/bark organic matter sources – aerobically composted with no objectionable odors. The compost product should not resemble the raw material from which it was derived. Wood and bark chips, ground construction debris, or reprocessed wood products are not acceptable as the organic component of the mix. Provide compost meeting the compost standards for compost filter socks contained in th e DEP Erosion and Sediment Pollution Control Program Manual :

• Moisture content, dry weight basis 30%

Source: Pennsylvania Department of Transportation Specifications, 2026 Edition. Pages 796800 of 1,522.