953.3(d) 953.3(g) over cable manufacturer’s entire certified frequency range.
• Report cable Voltage Standing Wave Ratio ( VSWR ) performance in graphical format.
• Perform time- domain reflectometer ( TDR) testing to identify point faults. Report in graphical format.
• Test all ground system interconnections. Report impedance measurements.
• Repair or replace any cables and connectors that do not meet manufacturer’s published performance standards. Retest any such cables.
• Tune and configure system to maximize performance of radio link.
• Report actual VSWR, Received Signal Strength Indicator ( RSSI ), and signal -to-noise ( S/N) ratio.
• Utilize radio manufacturer’s diagnostic system software to assist in analysis and configuration.
• Log and submit printed diagnostic software results.
• Visually inspect all installed system components. Restore or replace all components found to be in less than perfect condition.
• Adjust Effective Isotropic Radiated Power (EIRP) to within FCC allowable limits.
Upon successful completion of the testing requirements the Representative will provide the contractor with final approval that the system is complete.
cables, except at terminal strips. Test the cables, as specified in Section 954.3(j), as applicable.
Neatly install all equipment meeting all FCC requirements and all state and local codes. Facilitate the cellular modem authorizations with the Service Representative and ensure that all cellular contracts are turned over to the proper responsible parties. Upon completion of the cellular system installation, demonstrate to the Representative that the installation is functioning properly as indicated.
optic network switch, patch panel, communication cables, and surge protection. Furnish all necessary materials necessary to provide a complete and functioning FO interconnect system including but not limited to the following requirements:
• One FO network switch is provided at the master controller location and at each local controller location as indicated.
• Communication cables from the controller to the FO network switch.
• Provide FO cable between each location as indicated.
• Provide FO patch panel for terminating each FO cable at an enclosure.
• Provide inner duct in all underground conduit installations as specified in Section 954.3(a), (b), (c).
• Provide all product information and warranties for all equipment.
953.3(g) 953.3h )