TRAFFIC ACCOMODATION AND CONTROL

903TEMPORARY BRIDGE AND APPROACHES

PA · 2026 Standard Specifications✓ Full text on BuildSpecBook pages 824–0 Save this section

Ask about Section 903

Get a cited answer from the section text. Click the citation to check it.

One cited answer a day is free. Start a 14-day trial for unlimited, no card required.

903.1DESCRIPTION —This work is the design, furnishing, placement, maintenance, and removal of a

temporary bridge and approaches of the type and method indicated, including required maintenance and protection of traffic.

903.2MATERIAL—As indicated or as shown on the accepted detailed drawings.

903.3CONSTRUCTION—

(a)Two-Lane Construction. If not otherwise indicated, design a temporary bridge and approaches to

accommodate two lanes of traffic on a Department right of way or easement. Submit detailed drawings of the proposed bridge and approaches for the Representative’s review and acceptance. Design the proposed temporary bridge for PHL-93 at the operating level, with a roadway width as indicated between curbs, guide rails, and with sidewalks, when directed. Conform to the alignment and grades indicated. If not indicated, submit a plan of a proposed alignment and grade. Upon acceptance of the detailed drawings, construct the temporary bridge and grade, drain, and pave the approaches. Provide sidewalks and sidewalk protection when indicated. If indicated, move the existing structure , and use it as the temporary bridge. The method of moving, placing, and maintaining the structure will be subject to the Representative’s review and acceptance. When the temporary bridge and approaches are no longer needed, remove and dispose of them as directed. Grade and restore the entire disturbed area, as specified in Section 105.14.

(b)One-Lane Construction. Construct, as specified in Section 903.3(a), except:

Construct a one-lane temporary bridge having a roadway width between curbs of not less than 12 feet. Grade the one-lane approaches for a total width of not less than 18 feet and surface for a width of not less than 12 feet.

(c)Maintenance and Protection of Traffic. As specified in Section 901, maintain and protect traffic in

the temporary area.

903.4MEASUREMENT AND PAYMENT—

(a)Method 1. Lump Sum
(b)Method 2. Separate items, as follows:

• Temporary Bridge and Approaches (Two-Lane or One-Lane). Lump Sum

• Maintenance and Protection of Traffic on Temporary Bridge and Approaches. Lump Sum

• Removal of Temporary Bridge and Approaches. Lump Sum

Get an email when 903 changes

Pennsylvania revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.

Source: Publication 408 Highway Construction Specifications, 2026 Edition. Pages 824–0 of 1,522. View official source ↗