4-32 Water added or fines added or both added to the material to ai d compaction and to prevent raveling will be at the Contractor's expense. Payment will be made under: P a y I t e m P a y U n i t
411.09 Untreated Aggregate Surface Course Cubic Yard
411.10 Untreated Aggregate Surface Course, Truck Measure Cub ic Yard
411.12 Crushed Stone Surface Ton
SECTIONS 412 - 418 VACANT SECTION 419 - SAWING AND SEALING JOINTS IN BITUMINOUS PAVEMENT Reserved SECTION 420 - PORTLAND CEMENT CONCRETE PAVEMENT Reserved SECTIONS 421 THROUGH 423 - VACANT SECTION 424 - CRACK SEAL Reserved SECTION 425 - RECYCLED BITUMINOUS PAVEMENT Reserved SECTIONS 426 THROUGH 459 - VACANT SECTION 460 - HOT MIX ASPHALT PAVEMENT FOR SPECIAL AREAS Reserved SECTION 461 – LIGHT CAPITAL PAVEMENT Reserved SECTION 462 - MICROSURFACING Reserved
Source: Maine Standard Specifications for Road and Bridge Construction, 2020 Edition. Pages 292–292 of 817.