6-164 Pay Item Pay Unit
653.20 1 inch Polystyrene Plastic Insulation S q u a r e Y a r d
653.21 1½ inch Polystyrene Plastic Insulation S q u a r e Y a r d
653.22 2 inch Polystyrene Plastic Insulation S q u a r e Y a r d
653.23 3 inch Polystyrene Plastic Insulation S q u a r e Y a r d
SECTION 654 - INTELLIGENT TRANSPORTATION SYSTEMS Reserved SECTION 655 - ELECTRICAL WORK Reserved SECTION 656 - TEMPORARY SOIL ER OSION AND WATER POLLUTION CONTRO L 656.1 Responsibility of the Contractor-Prepare and Follow Plan The Contractor shall provide continuous and effective temporary soil erosion and wat er pollution control for the Project that is appropriate to the construction means, methods and sequencing allowed by the Contract and selected by the Contractor. To do so, the Con tractor shall prepare and submit a Soil Erosion and Water Pollution Control Plan (SEWPCP) and properly implement its approved SEWPCP. The Contractor shall have its SEWPCP appr oved, perform a preconstruction field review, and install and certify initial c ontrols before commencing any Work, which could disturb soils or impact water quality. Failur e by the Contractor to follow Standard Specification or Sp ecial Provision - Section 656 will result in a violation letter and a reduction in payment as shown in the schedule list in 656.5.1 . The Department’s Resident or any other representative of The Department reserves the righ t to suspend the work at any time and request a meeting to discuss violations and remedies. The Department shall not be held responsible for any delay in the work due to any suspensio n under this item. If the Contractor properly imple ments its approved SEWPCP, then (1) any Work required in excess of that required by the SEWPCP will be Extra Work, (2) any Delay resulting from any such excess Work will be analyzed in accorda nce with Section 109.5 - Adjustments for Delay, and (3) t he Contractor will not be resp onsible for damages relating to insufficient soil erosion and water pollution control includ ing the cost of all environmental enforcement actions, penalties, or monetary settl ements assessed any environmental regulatory entity and all costs incurred by or th rough the Department. If the Contractor fails to prep are, submit, or seek approval of a SEWPCP or fails to properly implement its approved SEWPCP, then (1) the Departmen t may suspend all Work,