201.01d, shall be considered incidental to the contract and no separate payment will

ME · 2020 Standard SpecificationsBook pages 181181View official source ↗

2-5 top of the stump. Trees or stumps, which have multiple trunks protruding from a single base trunk, shall be measured for payment as a single tree or stump. Individual trunks of multiple trunk trees or stumps having a d iameter of less than 12 inches will not be included to determine the size of a tree or stump.

201.10 Basis of Payment The accepted quantities of clearing, selective clearing and

thinning will be paid for at the contract unit price per acre. The accepted quantity of single trees and stumps removed will be paid for at the contract unit price each. Payment for trees shall include remo val and disposal of the entire tree except stumps. All stumps, as defined in Subsection 201.01 d.2 and designated to be removed, will be paid for at the contract unit price each. Payment shall inc lude removal and disposal of the stumps and roots. When the Schedule of Items does not contain an estimated quant ity for clearing, and it is not noted on the plans as incidental, the work, when auth orized, will be paid for under the provisions of Section 109.3 - Extra Work. When the use of herbicide or tree paint is required to complet e the work included under this section, it will not be paid for directly, but will be considered as included in the other contract pay items. Grubbing, when required, will be m easured and paid for as prov ided in Section 203 - Excavation and Embankment. Payment for removal of trees and stumps, not defined as contra ct pay items under Section 201.01d, shall be considered incidental to the contract and no separate payment will be made. Removal of unsound and unsightly branches and trimming branche s of trees, as specified in Subsection 201.03 - General, will be paid for unde r the provisions of Sections

109.03 Extra Work or 631 - Equipment Rental.

Payment will be made under: P a y I t e m Pay Unit

201.11 Clearing A c r e

201.12 Selective Clearing and Thinning Acre

201.23 Removing Single Tree Top Only Each

201.24 Removing Stump Each

SECTION 202 - REMOVING STRUCTURES AND OBSTRUCTIONS