6-174
658.05 Method of Measurement Acrylic Latex Color Finish will b e measured by the
square yard of surface sealed, measured parallel to the surface . Furnishing and adding sand at designated locations will be incidental.
658.06 Basis of Payment The accepted quantity of Acrylic Latex Color Finish will be
paid for at the contract unit price per square yard complete in place, including furnishing, and adding sand, where required. Payment will be made under: Pay Item Pay Unit
658.20 Acrylic Latex Color Finish S q u a r e Y a r d
SECTION 659 - MOBILIZATION
659.01 Description When this item is listed as a Pay Item in the Bid, it shall consist
of preparatory work and operations including, but not limited t o those necessary to the movement of personnel, equipment, supplies and incidentals to t he project site; and for all other work and operations which must be performed or costs incu rred prior to beginning work on the various items on the project site.
659.02 Basis of Payment Partial payments will be made in accor dance with Section
108.2.3 Mobilization The total sum of payments under this item shall not exceed the original Contract amount bid regardless of the fact that the Contractor may shut down th eir work on the Project or move equipment away from the Project and then back again. Payment will be made under: Pay Item P a y U n i t
659.10 Mobilization Lump Sum
SECTION 660 ON-THE-JOB TRAINING
660.01 Description On-The-Job Training programs (OJT) are required as part of the
Contractor’s equal employment opportunity affirmative action pr ogram. The primary objective of on the job training shall be to train and upgrade women, minorities, and