Electrical (16000-16999)

609.26Curb Transition Section B Type 1 E a c h

ME · 2020 Standard SpecificationsBook pages 511512View official source ↗

6-41 Curb, Type 5 required to have a radius of 30 feet or less will be paid for as Curb Type 5 - Circular. There will be no separate payment for concrete fill, mortar, re inforcing steel, anchors, tack coat, drilling for and grou ting anchors, pointing and bedd ing of curbing, and for cutting and fitting, but these will be considered included in the work of the related curb. Removal of existing curb and necessary excavation for installi ng new or reset curbing will not be paid for directly, but shall be considered to be included in the appropriate new or reset curb pay item. Base and Subbase mater ial will be paid for under Section 304 - Aggregate Base and Subbase Course. Backing up bi tuminous curb is incidental to the curb items. Loam, as directed, will be paid u nder 615 – Loam. Payment will be made under: Pay Item P a y U n i t

609.11 Vertical Curb Type 1 L i n e a r F o o t

609.12 Vertical Curb Type 1 - Circular L i n e a r F o o t

609.13 Vertical Bridge Curb Type 1 L i n e a r F o o t

609.131 Vertical Bridge Curb Type 1A L i n e a r F o o t 609.132 Vertical Bridge Curb Type 1B L i n e a r F o o t 609.142 Vertical Bridge Curb Type 1B - Circular L i n e a r F o o t

609.15 Sloped Curb Type 1 L i n e a r F o o t

609.151 Sloped Curb Type 1 - Circular L i n e a r F o o t

609.23 Terminal Curb Type 1 E a c h

609.234 Terminal Curb Type 1 - 4 foot E a c h 609.237 Terminal Curb Type 1 - 7 foot E a c h 609.2371 Terminal Curb Type 1 - 7 foot – Circular E a c h 609.238 Terminal Curb Type 1 - 8 foot E a c h

609.26 Curb Transition Section B Type 1 E a c h

609.31 Curb Type 3 L i n e a r F o o t

609.34 Curb Type 5 L i n e a r F o o t

609.35 Curb-Type 5 - Circular L i n e a r F o o t

609.38 Reset Curb Type 1 L i n e a r F o o t

609.39 Reset Curb Type 2 L i n e a r F o o t

609.40 Reset Curb Type 5 L i n e a r F o o t

SECTION 610 - STONE FILL, RIPRAP, STONE BLANKET, AND STONE DITCH PROTECTION

610.01 Description This work shall consist of excavating for and constructing a

protective covering of stone. The types of protective covering of stone are designated as follows: 6-42

a.Stone fill Machine placed embankment for fill slope
b.Plain Riprap Machine placed stones on earth bedding
c.Hand Laid Riprap Hand placed stones on earth bedding
d.Stone Blanket Machine placed stones around piers and Abutme nts
e.Heavy Riprap Machine placed stones on earth bedding
f.Stone Ditch Protection Machine placed ditch protection of r ock

610.02 Materials Materials shall meet the requirements of the following Sections of

Division 700 — Materials:

Stone Fill 703.25 Plain and Hand Laid Riprap 703.26 S t o n e B l a n k e t 703.27 Heavy Riprap 703.28 610.031 General Suitable material removed when excavating for the placing of riprap, stone fill, stone blanket or stone ditch protection sha ll be used in the formation of embankments, subgrade and for backfilling as shown on the plans or as directed. 610.032 Placing Stones

a.Stone Fill and Stone Blanket Material for stone fill shall be deposited to provide a compact mass. The exposed slope shall be finished to the line and grade required without special handling or handwork. Material for stone blank et shall be deposited for protection around piers or abutments as shown on the plans. Th e stones shall be placed individually to form a reasonably compact mass. Spaces between the larger stones shall be filled with stone or spall of suitable size to leave an even surface conforming to the contour required. Stone fill and stone blanket shall be placed on the slope in a well-knit, compact and uniform layer. The surface stones shall be chinked with smaller stone from the same source.
b.Riprap Stones for riprap shall be placed upon a slope prope rly graded and compacted as called for. When required, the bottom of the ripr ap shall be placed in a trench at the toe of the slope. Plain riprap shall be placed f ull depth in one operation without special handwork and shall be placed approximately true to the required slope line and grade and be uniform in appearance. Hand laid riprap shall be random rubble, hand laid stones for the full depth placed in one operation to secure interlocking of all face stones and stones placed as backing. Larger stones shall be laid at the base of the slope. The stones shall be lai d in close contact with the long er axis perpendicular to the plane of the slope to stagger joints. Except when required to be grouted the openings between the stones in all riprap shall be filled with spall, or rocks securely rammed into place. Riprap shall be placed on the slope in a well-knit, com pact and uniform layer. The surface stones shall be chinked with smaller stone from the same source.
Source: Maine Standard Specifications for Road and Bridge Construction, 2020 Edition. Pages 511512 of 817.