3-29
309.11 Basis of Payment The accepted quantity of Full De pth Recycled Pavement
with Foamed Asphalt shall be paid for at the contract unit pric e per yd2, complete in-place to the specified limits, which price shall be full compensation fo r furnishing all equipment and labor for pulverizing, blending, placing, grading, compacting a nd for all incidentals necessary to complete the work i ncluding asphalt binder, water, Portland Cement, lime, and crusher dust. The addition of materials to restore profile grade and/or cross -slope in areas shown on the plans or described in the construction notes will be paid s eparately under designated pay items within the contract. No additional payment will be made f or materials salvaged from the project. Payments will be made under: P a y I t e m Pay Unit
309.35 Full Depth Recycled Pavement with Foamed Asphalt 5 in de pth Square Yard
309.36 Full Depth Recycled Pavement with Foamed Asphalt 6 in de pth Square Yard
SECTION 310 - PLANT MIXED RECYCLED ASPHALT PAVEMENT
310.01 Description This work shall consist of the removal of a ll bituminous pavement
from the existing roadway, hauling the bituminous pavement to a n approved location, and processing as per Section 310.020. The gravel base of the exis ting roadway shall be regraded and compacted to the tolerances shown on the typicals, or as directed by the Resident. All plant mixed recycled asphalt pavement shall be placed in on e or more courses on an approved base and in accordance with these specifications, and in reasonably close conformity with the lines, grades and thicknesses indicated on the plans, or as established by the Resident. Excess recycled material not used in the PMRAP p rocess will become the property and responsibility of the contractor. 310.020 Composition of Mixture The mixture shall be composed a s directed in the job mix formula. The recycled asphalt pavement shall be processed b y the Contractor so all material will be no larger than 1 ½ inch and stockpiled so as t o minimize segregation. The stockpile shall be free of any materials not generally consider ed to be asphalt pavement. If additional material is required, the material will be supplied by the Department or acquired from the Contractor through the C ontract Modification process. A job mix formula shall be furnished by the Department establis hing the percentage of emulsified asphalt cement, Portland Cement, aggregate, and wate r to be used in the mixture. The JMF additive proportions will be verified by taking a secon d recycled material sample once the stockpiles have been constructed.