6-162 The accepted quantities of traffic officer hours will be paid f or at the contract unit price per hour for each station occupied, with no additional payment for overtime. This price shall be full compensation for supplying uniformed officers wit h police cruisers, and all incidentals necessary to complete the work; including transport ation, equipment, and supervision. The accepted quantities of warning lights will be paid for at t he contract unit price, per group, complete in place including the necessary power, and rem aining in operation during active work of the project or as otherwise directed. Upon comp letion of the work, the lamps, fixtures, and the framework required to properly mount t he lamps shall remain the property of the Contractor. Payment for temporary pavement marking lines and pavement marki ng removal will be made under the respective pay item in Section 627 - Pavement Ma rkings. Payment for temporary traffic signals will be made under Sectio n 643 - Traffic Signals. There will be no payment made under any 652 pay items after the expiration of the adjusted total contract time. Payment will be made under: P a y I t e m P a y U n i t
652.30 Flashing Arrow Each
652.31 Type I Barricade Each
652.311 Type II Barricade Each 652.312 Type III Barricades Each
652.32 Battery Operated Light Each
652.33 Drum Each
652.34 Cone Each
652.35 Construction Signs Square Foot
652.36 Maintenance of Traffic Control Devices Calendar Day
652.361 Maintenance of Traffic Control Devices Lump Sum
652.37 Warning Lights Group
652.38 Flaggers Hour
652.381 Traffic Officers Hour
652.41 Portable-Changeable Message Sign Each
SECTION 653 - POLYSTYRENE PLASTIC INSULATION
653.01 Description This work shall consist of furnishing and installing a polystyrene
plastic insulating layer at locations designated on the plans i n accordance with these specifications.