674.04Submittals. The Contractor shall supply wall design com putations, wall details,

ME · 2020 Standard SpecificationsBook pages 673673View official source ↗

submitted to the Resident for review by the Department. The fu lly detailed plans shall be prepared in conformance with Subsection 105.7 of the StandardS pecifications and shall include, but not be limited to the following items:

A.A plan and elevation sheet or sheets for each wall, containing the following:

elevations at the top of leveling pads, the distance along the face of the wall to all steps in the leveling pads, the designation as to the type of prefabr icated module, the distance along the face of the wall to whe re changes in length of the un its occur, the location of the original and final ground line. B. All details, including reinforcing bar bending details, sha ll be provided. Bar bending details shall be in accordance with Department standards.

C.All details for foundations and leveling pads, including de tails for steps in the

leveling pads shall be provided. The maximum calculated factored bearing pressure under the Prefabricated Concrete Modular Gravity wall shall be indicated on the wall plans. D. All prefabricated modules shall be detailed. The detailss hall show all dimensions necessary to construct the element, and all reinforcing steel in the element.

E.The wall plans shall be prepared and stamped by a Professio nal Engineer.
F.Four weeks prior to the beginning of construction, the cont ractor shall supply the

Resident with two copies of the design-supplier’s Installation Manual. In addition, the Contractor shall have two copies of the Installation Manual on the project site.

674.05Construction Requirements Excavation The excavation and use as fill or disposal of all excavated material shall

meet the requirements of Section 203 -- Excavation and Embankme nt, except as modified herein. Foundation The area upon which the modular gravity wall struc ture is to rest, and within the limits shown on the submitted plans, shall be graded for a width equal to, or exceeding, the length of the module. Prior to wall and levelin g pad construction, this foundation material shall be compacted to at least 95 percent o f maximum laboratory dry density, determined using AASHTO T180, Method C or D. Frozens oils and soils unsuitable or incapable of sustaining the required compaction, shall be removed and replaced. A concrete leveling pad shall Leveling pad shall have a minimu m thickness of 4 inches and shall be constructed as indicated on the plans. The leveling pad shall be cast to the design elevations as shown on the plans, or as required by the wall supplier upon written approval of the Resident. Allowable elevation tolerances are + 0.01 ft and -0.02 ft from the design elevations. Leveling pads which do not meet this requir ement shall be repaired or

Source: Maine Standard Specifications for Road and Bridge Construction, 2020 Edition. Pages 673673 of 817.