622.08Basis of Payment

ME · 2020 Standard SpecificationsBook pages 550551View official source ↗

6-80 Contractor shall take steps required to protect the plants from damage and from diseases and pests. Should damage occur it shall be repaired by the Contrac tor, according to the best horticultural practice. The Contractor shall be responsible for transplants through one growing season.

622.06 Replacement If the ball is badly broken or the plants are otherwise badly

damaged or if, in the opinion of t he Resident, during the life of the contract the plants show such signs of loss of healt h or appear to be in danger of dying , the Contractor will be required to replace the plants with others of the same size and variety or approved plants of equal value, at the proper season.

622.07 Method of Measurement

Transplanting shrubs or trees will be measured in place after transplanting by the single shrub or tree unit.

622.08 Basis of Payment

The accepted quantities of transplanting shrubs or trees will be paid for at the contract unit price for each plant properly transplanted and ac cepted, which payment shall include digging, binding, moving, replanting, pruning, mulching , care and maintenance and if required, replacement of the shrubs, and for all fertilizer, mulch and other materials, and for all incidentals necessary to complete the item. Payment will be made under: P a y I t e m P a y U n i t

622.10 Transplanting Shrub Each

622.11 Transplanting Tree Each

SECTION 623 – MONUMENTS Reserved SECTION 624 - VACANT SECTION 625 - WATER SERVICE SUPPLY LINES

625.01 Description This work shall consist of installing wate r pipe and pipe sleeve

in reasonably close conformity with the lines and grades shown on the plans or established. The installation shall include the assembly of all components a nd materials shown on the plans or as directed. 6-81

625.02 Materials Materials shall meet the requirements specif ied in the following

Sections of Division 700 - Materials: Copper Tubing 712.32 Non-metallic Pipe, Flexible 712.33 Non-metallic Pipe, Rigid 712.34 Metallic Pipe 712.341

625.03 General This work shall be done with as little interru ption of water service

as possible. Ample notification shall be given to the users of the water before any disruption of water service.

625.04 Sleeve Pipe for sleeves shall be metallic or non-metal lic rigid and be laid on

a firm foundation at the line and grade designated. When the p ipe installation is in a trench all excavating and backfilling shall be in accordance with Sect ion 206 - Structural Excavation. After installation of the pipe, special care shall be taken to protect the pipe from heavy hauling equipment loads, rocks or any other damage caused by the Contractor's work. All pipe broken from such causes shall be removed and replaced at the Contractor's expense. Pipe sleeves to be placed in concrete shall be supported durin g placement of concrete. Special care shall be taken while placing and compac ting concrete around the sleeves to prevent voids around t he outside of the sleeves. En ds of the sleeves shall be capped with end plates until the water pipes are installed thro ugh the sleeves.

625.05 Water Pipe Water pipe shall be copper tubing or non-me tallic flexible pipe,

as called for. After the sleev e has been placed, the water pip e shall be inserted into the sleeve and connected to the existing pipes at each end. All co nnections to existing pipes shall be done in accordance with recognized plumbing practices. Necessary fittings, adapters, and reducers shall be furnished a s required.

625.06 Method of Measurement Pipe sleeve, copper tubing, and non-metallic pipe

will be measured by the linear foot.

625.07 Basis of Payment The accepted quantities of pipe sleev e, copper tubing and

non-metallic pipe will be paid for at the contract unit price p er linear foot for the types and sizes specified complete in place, which payment will be compen sation for furnishing and installing all necessary fittings, for connecting to existing s ystems and for capping the ends of the pipe sleeve. Excavation will not be paid for separately but will be conside red included in the work of the contract items. Payment will be made under:

Source: Maine Standard Specifications for Road and Bridge Construction, 2020 Edition. Pages 550551 of 817.