612.1DESCRIPTION—This work is construction of subgrade drains.

612.2MATERIAL—

• Asphalt Impregnated Paper. Section 727

• Coarse Aggregate, Type C or better (no steel slag), No. 57. Section 703.2, except that the soundness test is not required and the percentage of crushed fragments for gravel does not apply.

• Geotextiles, Class 1. Section 735

612.3CONSTRUCTION—As shown on the Standard Drawings and as follows:

(a)Trench and Backfill. Excavate the trench, backfill, and adequately tamp the backfill.

Keep outlet ends of subgrade drains open during construction and until final acceptance of shoulders. Extend subgrade drains a length sufficient to adequately drain the wet area. Construct subgrade drains under subbase after the subgrade has been completed but before the subbase is placed. Construct subgrade drains at right angles to the roadway centerline , or skew, as directed. Extend subgrade drains along the roadway, if necessary, to achieve a suitable outlet. Maintain a minimum slope of 1/4 inch per foot on the trench bottom through pavement and shoulder areas.

(b)Geotextiles, Class 1. Section 212.3(b), if indicated.
(c)Shoulder Restoration. If shoulder restoration is indicated, follow applicable specifications and

standards to reconstruct the existing shoulder as specified in the contract documents.

612.4MEASUREMENT AND PAYMENT—

(a)Subgrade Drains. Linear Foot
(b)Subgrade Drains, Including Shoulder Restoration. Linear Foot
(c)Geotextiles, Class 1. Section 212.4(a)

Get an email when 612 changes

Pennsylvania revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.

Source: Publication 408 Highway Construction Specifications, 2026 Edition. Pages 525–0 of 1,522. View official source ↗

Ask about this section

Scoped to Pennsylvania Publication 408 — Specifications, Section 612 — SUBGRADE DRAINS. Every answer cites the section it came from, with a verification date — don’t trust a percentage, click the citation.