665.1DESCRIPTION—This work is cleaning and repointing of existing masonry joints of the type indicated.
665.2MATERIAL—
665.3CONSTRUCTION—
than twice the joint width . Saturate the joints with clean water the day before repointing. Bring wetted surfaces to a saturated surface dry ( SSD) condition before filling with mortar and ram well in place. Finish with a pointing tool. Do not apply mor tar to a dry surface or to a surface with free standing water. Do not point in freezing weather. Remove and replace work damaged by frost at no additional cost to the Department. Keep the wall in an SSD condition while pointing. Protect pointed masonry from the elements for a period of 3 days. Clean the exposed masonry faces.
Pressure-point caulking compound into the joints by an acceptable method and finish the joints. Protect the caulked pointing from the elements for 3 days. Clean the exposed masonry surface.
1017.3Fill voids full of mortar and flush with the adjacent structure face using acceptable pressure
equipment. Clean the exposed masonry face. Cure as specified in Section 1017.3(g).
665.4MEASUREMENT AND PAYMENT—