B
HomeLibrariesCode AISearchProjectsBookmarksAddress
FeedbackHelp Desk
Libraries
Estimate & calculate
CalculatorsChecklists
PricingLog in
INCIDENTAL CONSTRUCTION

628RESET TEMPORARY BARRIER

PA · 2026 Standard Specifications✓ Full text on BuildSpecBook pages 551–0 Save this section

Ask about Section 628

Get a cited answer from the section text. Click the citation to check it.

One cited answer a day is free. Start a 14-day trial for unlimited, no card required.

628.1DESCRIPTION —This work is the resetting of a temporary barrier from one construction area to

another within the project limits.

628.2MATERIAL—Section 627.2

628.3CONSTRUCTION—Section 627.3

Reset barrier if construction operations require a change in protection of traffic or as directed. Store or transport the barrier, as required. If the pavement is cracked or damaged by installation or removal procedures, submit a repair procedure using approved materials for review. Do not begin repairs until the submittal is accepted. Upon removal of the temporary barrier, remove all anchors, repair all anchor holes, and repair damage to the pavement in a manner approved by the Representative utilizing approved materials at no additional cost to the Department.

628.4MEASUREMENT AND PAYMENT—

(a)Reset Temporary Barrier. Linear Foot

Delineation as specified in Section 937 is incidental.

(b)Reset Temporary End Transition. Each

Delineation as specified in Section 937 is incidental.

Get an email when 628 changes

Pennsylvania revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.

Source: Publication 408 Highway Construction Specifications, 2026 Edition. Pages 551–0 of 1,522. View official source ↗

Ask about this section

Scoped to Pennsylvania Publication 408 — Specifications, Section 628 — RESET TEMPORARY BARRIER. Every answer cites the section it came from, with a verification date — don’t trust a percentage, click the citation.