SECTION 501 JPC PAVEMENT, PCC BASE, AND JPC SHOULDERS
501.01 DESCRIPTION. Construct a single course of JPC pavement, PCC base, or JPC
shoulders. Construct longitudinal and transverse joints when required. Construct pavement, base, and shoulders on a prepared subgrade or an aggregate base course.
501.02 Materials and Equipment.
501.02.01 Concrete. Conform to Subsection 601.02 and 601.03.
501.02.02 Joint Materials.
Conform to Section 807.
501.02.03 Tie Bars. Conform to Section 811 for steel reinforcement, No. 5 epoxy,
Grade 60 .
501.02.04 Reinforcing Bar Adhesive. Use Type IV epoxy or grout adhesive
conforming to Section 826.
501.02.05 Miscellaneous Steel. Conform to Section 811 for chairs, hook tie-bolts,
spacers, aligning bars, and upper tie bars used in joint assemblies.
501.02.06 Epoxy Coating Material. Conform to Section 811.
501.02.07 Dowel Bars and Sleeves. Conform to Section 811.
501.02.08 Curing Materials. Conform to Section 823.
501.02.09 Batching Plant Equipment. Conform to Subsection 601.02, except do not
use continuous mixers.
501.02.10 Mixers. Conform to Subsection 601.02.
501.02.11 Slip Form Pavers. Provide slip form pavers of an approved self-propelled
type designed to spread, consolidate, and finish the concrete in one complete pass of the paver, and in such a manner that minimizes hand finishing. Ensure that the paver consolidates the concrete without damaging or displacing the load transfer devices and finishes the concrete to produce a smooth, uniformly textured surface having the specified crown and slope ready for final finishing. Use an automatic sensing device in continuous contact with a sensing guide to control the alignment. Maintain pavers according to the manufacturer’s specifications.
501.02.12 Auxiliary Equipment for Slip Form Paving. Provide auxiliary equipment
used in placing and finishing slip formed concrete, that is self-propelled and designed to operate without unnecessary contact with the newly placed concrete.
501.02.13 Forms. Provide form sections 10 feet long or longer and with a base width
sufficient to ensure form stability. Use steel forms with self-aligning joints, designed to withstand the lateral and vertical loads imposed by spreaders, finishing machines, or other types of form-riding equipment. Use form sections that have the base of one end of each form section cut on a diagonal so the forms can be assembled to negotiate the inside and outside curves of roadways. Ensure that each 10-foot length of form has at least 3 stake pockets securely riveted or 501-1 welded to the web and base to act as diagonal braces. Equip each stake pocket with at least one steel wedge to securely key the form to the stake. Provide each form section with one lock-joint plate made of metal of a thickness equal to the form and of sufficient length to ensure stability, located on one end of the form in such a manner as to connect to the adjoining form. Construct the joints so that there will be no difference in the elevation of the end of each form, providing a smooth level track surface. Use plates formed or reinforced to allow hammering or driving without distortion or breakage. Use approved flexible forms for construction of circular pavement edges where the radius is 100 feet or less.
501.02.14 Fine Grading Machines. Provide fine grading machines that are capable
of preparing the grade for the paving equipment to the specified base tolerance and to ensure that the finished pavement conforms to the specified surface tolerances.
501.02.15 Spreaders. Provide spreaders that distribute the concrete uniformly without
segregation and strike off the concrete to a uniform depth. Use spreaders equipped with scraping devices designed to clean the top of the forms when traveling in either direction.
501.02.16 Finishing Machines and Floats. Provide transverse finishing machines,
longitudinal floats, and combination float finishers that are power driven and designed to operate without slipping on the forms or displacing the forms. Use finishing machines and floats that screed and finish the pavement within the specified tolerances.
501.02.17 Vibrators. Use vibrators for full width vibration of concrete paving slabs
of either the surface pan type or the internal type. When using the internal type, provide vibrators having immersed tube or multiple spuds. When only spuds are used, space the spuds no more than 2 feet apart. Either att ach the spuds to the spreader or the finishing machine or mount the spuds on a separate carriage. Make the frequency of the vibrators such as to satisfactorily vibrate and consolidate the concrete throughout its full width and depth. Achieve consolidation using industry standards according to the guidelines in ACI 309R including frequency recommendations, performance, and application of internal vibrators. Do not use electrical, multiple speed, internal vibrators. Operate all consolidating devices so that when the forward movement of their mount stops the consolidating devices immediately stop. Ensure that all slip form pavers are equipped and using vibrator frequency recorders. The recorder must be able to continuously monitor each vibrator’s operating frequency and provide an immediate visual or auditory warning when the frequency goes outside the acceptable range.
501.02.18 Miscellaneous Equipment.
501.02.19 Water Supply Equipment. Provide approved truck tanks or pumps and
pipe lines that are of such capacity and efficiency to ensure an ample supply and an adequate pressure of water simultaneously for all requirements of the work, including mixing, curing, sprinkling the subgrade, and cleaning hauling equipment as necessary.
501.02.20 Concrete Saws. Provide concrete saws for sawing joints that are power-
driven, having diamond-edge or abrasive saw blades, capable of cutting to the alignment, depth, and width specified for the joints, and in sufficient numbers to ensure all joints are sawed within the specified time limits.
501.02.21 Equipment for Applying Membrane Curing Compound. Conform to
Subsection 601.02.
501.02.22 Air Compressors. Furnish air compressors having separators and traps.
501.02.23 Profiler. The Department will measure the longitudinal profile of the
surface with an ASTM E 950, Class 1 device.
501.03 Construction.
501.03.01 Care, Storage, and Handling of Aggregates, Cement, and Fly Ash.
Furnish, store, and handle aggregates, cement, and fly ash according to Subsection 601.03.
501.03.02 Admixtures. Furnish admixtures according to Subsection 601.03, except
the Department will not requi re a water-reducing admixture.
501.03.03 Concrete Producer Responsibilities. Design concrete mixtures and
perform quality control and process control according to Subsection 601.03.
501.03.04 Proportioning and Requirements. Furnish Class P concrete according to
Subsection 601.03.
501.03.05 Weather Limitations and Protection. Mix, place, and finish concrete
when the lighting is sufficient. Discontinue mixing and concreting operations when a falling air temperature in the shade and away from artificial heat reaches 40 F. Do not resume mixing and concreting operations until rising air temperature in the shade and away from artificial heat reaches 35 F. In cold weather, when the Engineer authorizes concreting of small or irregular areas such as crossovers, temporary openings, tur nouts, narrow or irregular widening, and other areas where hand finishing is allowed, the Engineer may require the water and aggregates to be heated to no more than 150 °F. Heat the aggregates prior to being placed in the mixer. Use an apparatus that heats the mass uniformly and is arranged to preclude the possible occurrence of overheated areas. Ensure that th e temperature of the heated mixture is no less than 50 F and no more than 90 F at the time of placing. Do not place concrete on a frozen base. Do not use frozen aggregates in the concrete. When deemed necessary, install and maintain protective coverings and heating devices 501-3 to protect the concrete in place and to prevent its temperature from falling below 45 F until the concrete is 7 calendar days old or has attained the required strength according to Subsection 501.03.20. Do not use admixtures to prevent freezing. Maintain the temperature of the mixture at or below 90 F during placement. Unless the Engineer determines that safety concerns or other considerations prohibit a shutdown, cease concrete production when the mixture exceeds 90 F until adequate methods are in place to reduce or maintain the mixture temperat ure. Do not place concrete in areas where hand finishing will be used if the ambient temperature is above 100 F. Protect newly placed pavement that is threatened with damage by rain. If the texture is damaged so the specified groove dimensions are not met, restore acceptable texture to the damaged areas by sawing to conform to groove requirements.
501.03.06 Slump. Conform to Subsection 601.03.06.
501.03.07 Preparation of Aggregate Base Course. When placing the concrete by
the slip form process, prepare the grade for the paving equipment to the accuracy necessary to ensure that the finished concrete conforms to all surface tolerance requirements. When placing the concrete using fixed forms, prepare the aggregate base course to the required lines, grades, and cross section. Back fill low places and cavities in the base course detected during the final shaping with concrete placed in conjunction with the pavement, base, or shoulders. Maintain the finished aggregate base course in a smooth, compacted condition. Ensure that the base course is moist when placing the concrete. When required, wet the base course prior to placing the concrete. Avoid creating mud or pools of water.
501.03.08 Forming. Stake and brace the forms to resist concrete pressure and the
lateral thrust of form-riding equipment. Set the forms so that they uniformly bear on the base course throughout their entire length and width. Set the forms directly in contact with the finished aggregate base course. When the aggregate base is disturbed or loosened, thoroughly tamp the material supporting the forms either mechanically or by hand at both the inside and outside edges of the base of the forms. Join all forms neatly and tightly, and thoroughly clean and oil all forms before placing concrete against them. After setting the forms in place, check their top surfaces for grade and alignment . Reset, or remove and replace, any forms showing a top surface variation greater than 1/8 inch in 10 feet.
501.03.09 Mixing. Produce concrete by mixing according to Subsection 601.03.08.
The Department reserves the right to stop the use of the mixing method in the construction of concrete pavements, bases, and shoulders when the concrete fails to conform to the specified requirements for proportioning, consistency, slump, or expected strength.
501.03.10 Delivery. Deliver according to Subsection 601.03.07 except when concrete
produced by central mixing is delivered by approved truck mixers, the Engineer will allow maximum slump applicable to truck-mixed concrete.
501.03.11 Placing Concrete. Obtain the Engineer’s approval of the condition of the
base course before placing any concrete. Deposit the concrete on the grade to require as little rehandling as possible. Unless hauling equipment is equipped with means for discharge of concrete without segregation of the materials, unload the concrete into an approved spreading device and mechanically spread it on the grade in a manner to prevent segregation of the materials. The Department will not require a mechanical spreader for PCC Base. Perform necessary hand spreading with shovels, not rakes. During any temporary shutdown of less than 30 minutes, cover the concrete at the unfinished end of the slab with wet burlap. When an interruption of the work exceeds 30 minutes duration, the Engineer may require that a construction joint be installed. 501-4 Consolidate all concrete with mechanical vibratory equipment throughout its full width and depth. The Engineer will allow small manually operated vibrators for variable width areas such as tapers, transitions, blockouts, parking areas, and other similar construction where hand finishing may be necessary. On mainline construction, vibrate the concrete by equipment specifically used for that purpose, in addition to vibration resulting from the operation of other placing or finishing equipment. Thoroughly consolidate concrete against and along the faces of all forms and headers and along the full length and on both sides of all joint assemblies. When vibrating, do not disturb load transfer devices, tie bars, hook bolts , side forms, or the aggregate base course. When slip form pavers are used, spread or distribute the concrete in front of the paver in a manner that will allow the paver to proceed uniformly without bulldozing large piles of concrete. Maintain the head of concrete at a uniform height and not so great as to cause erratic movements of the paver. If placing concrete adjacent to a previously constructed lane of pavement, base, or shoulder and mechanical equipment is to be operated upon the previously constructed lane, conform to the strength requirements of Subsection 501.03.20 for that lane and place temporary seals according to Subsection 501.03.18 before placing equipment in that lane. When constructing the pavement using fixed forms, provide at least 2 movable bridges from which finishers may satisfactorily finish the pavement.
501.03.12 Final Strike-Off. Perform operations in the following sequence:
consolidation, strike off, machine finishing, straight edging, minor hand finishing, and texturing. Do not add water to the surface of the concrete to aid finishing operations unless hand finishing. When hand finishing, the Engineer may allow application of water or a finishing aid to the surface to aid finishing. When the Engineer allows water or a finishing aid, apply it as a fog spray by means of approved spray equipment.
501.03.13 Finishing.
501.03.14 Removing Forms. Remove forms as soon as the concrete has hardened
sufficiently to allow sawing the transverse joints. Immediately fill all honeycombed areas appearing in the edges of the pavement, base, or shoulders with mortar composed of one part cement and 2 parts fine aggregate by loose volume. Then, cure the edges of the pavement, base, or shoulders.
501.03.15 Curing. Immediately after completing finishing operations and the
concrete has set sufficiently to prevent marring the surface, cover and cure the entire surface of the newly placed concrete, including the face of all construction joints. In all cases in which curing requires the use of water, ensure that water is available. The Department may suspend the placement of concrete when failure to provide sufficient cover or adequate water for curing occurs. When it becomes necessary to uncover an area of the pavement before the end of the curing period, do not expose the pavement for more than 30 minutes. Cure according to one of the following methods:
501.03.16 Diamond Grinding. When electing to or when the Contract specifies to
diamond grind the pavement to achieve texture or ride quality, conform to Subsections
503.02 and 503.03 excluding 503.03.09. The Department will determine pavement thickness according to Subsection 501.03.21 after diamond grinding.
501.03.17 Joints. Construct all joints, longitudinal and transverse, according to the
Plans and Standard Drawings. Use epoxy coated or other approved corrosion resistant tie bars and hook bolts. Construct all joints perp endicular to the surface of the pavement and to true alignment. Ensure that sawed joints are of uniform width throughout. Use sawing equipment to cut the joint in strict conformity with the required alignment and depth. The Engineer will 501-8 allow spraying of water on the saw blades during the cutting. Do not saw the joints until the concrete has hardened to the extent that tearing and raveling will not occur, but as soon as necessary to preclude random cracking. Do not allow any traffic on the pavement until the joints are sawed. The Engineer may require the construction of sawed joints at the time, day or night, and in the order or sequence that will most effectively hold random cracking to a minimum. Provide a standby machine and a sufficient supply of saw blades available at all times. Cut transverse saw cuts for joints that are to be sealed with preformed compression joint seals in one continuous cut across the pavement. When curbs or concrete medians are constructed integral with the pavement, construct all transverse joints continuous through the curb or median. When constructing PCC Base, for adjacent slabs with approximately 50-foot joint spacing, match joints and construct additional joints at third points. For adjacent slabs with 25-foot joint spacing, match joint and construct additional joints at midpoints. The Department will allow a transverse construction joint at a transverse joint, provided a dowel bar basket is used. Thoroughly flush all sawed joints with clean water or clean with compressed air immediately after sawing so the vertical surfaces of the joint will be clean and will allow proper adherence of joint sealer to the surfaces. Protect all joints from intrusion of injurious foreign material, including mortar or cuttings from adjacent sawing operations, until sealed.
501.03 18.
Install load transfer assemblies, when specified in the Contract, according to Subsection 501.03.17 B) for transverse expansion joints. The Department will not require dowel bar sleeves, finishing caps, expansion joint fillers, or hand placement of concrete around the assemblies. The Department will not require load transfer assemblies for c ontraction joints in PCC base.
501.03.18 Sealing Joints.
501.03.19 Surface Tolerances and Testing Surface.
501.03.20 Opening to Public Traffic. Open the pavement, base, or shoulders to
traffic anytime 3,000-psi strength is attained, except when curing with wet burlap. When curing with wet burlap, wait at least 72 hours before opening the pavement to traffic. Complete the construction of shoulders and thoroughly clean the pavement, base, or shoulders and seal all joints, as required, befo re opening the pavement to traffic other than construction equipment. Prior to opening the pavement to traffic, other than the construction equipment, complete the construction of shoulders in a satisfactory manner. When operating any equipment entirely or partially on the pavement, provide means to protect the pavement from damage regardless of its age. Either provide the equipment with rubber-tired wheels or operate the equipment over protective mats designed and constructed to prevent damage to the pavement surface and joints. Use mats consisting of wooden strips having a nominal thickness of 2 inches and a width of at least that of the treads. The Engineer may allow mats made of other suitable material. Sweep the pavement surface free 501-14 of debris prior to placing the protective matting. Construct a ramp of compacted earth, or other material of sufficient strength, to prevent undue stress in the pavement slab from equipment moving on and off the pavement. Open residential entrances to traffic, on which only automobile traffic is expected, only at the end of the 72-hour curing period, or at an attained strength of 3,000 psi. Clean the pavement and seal all joints before opening the residential entrances to traffic.
501.03.21 Tolerance in Pavement Thickness. Core the pavement as the Engineer
directs. The Engineer will determine the thic kness of the pavement and concrete shoulders according to KM 64-309. The Engineer will evaluate areas of the pavement and shoulders found deficient in thickness by more than one inch. When the Engineer deems the areas warrant removal, remove and replace the areas with concrete of the thickness specified in the Plans.
501.04 Measurement.
501.04.01 JPC Pavement. The Department will measure the quantity in square yards
according to the Plan dimensions as shown in the Record Plans. The Department will determine the final quantity based on the design quantity with increases or decreases by authorized adjustments. Authorized adjust ments include changes in the Record Plan dimensions, additional areas not shown in the R ecord Plans, and errors and omissions in the design quantity in excess of one percent. The Department will not measure reinforcing steel, load transfer assemblies, dowels, joint construction (including removal of c oncrete to accommodate a construction joint bulkhead), joint sealing, joint repair, form pi ns, texturing, additional work for drilling holes for form pins, texturing areas of the pavement that have been corrected by grinding, fly ash, Type IP cement, Type III cement, additional Ty pe I cement for high early strength, formed rumbles strips, and all other items necessary to construct the pavement according to the Contract for payment and will consider them incidental to this item of work.
501.04.02 PCC Base. The Department will measure the quantity in square yards
according to Subsection 501.04.01.
501.04.03 JPC Shoulders. The Department will measure the quantity in square yards
according to Subsection 501.04.01. The Department will not measure rumble strips for payment, unless they are constructed in a separate operation because the shoulder was used to maintain traffic, and will consider them incidental to this item of work.
501.04.04 Rumble Strips, Type 3. The Department will measure the quantity in linear
feet. The Department will not measure Type 3 rumble strips for payment unless they are constructed in a separate operation because the shoulder was used to maintain traffic.
501.04.05 Diamond Grinding. When listed as a bid item, the Department will
measure the quantity according to Subsection 503.04. The Department will not measure diamond grinding for payment when it is performed at the Contractor’s option or for corrective work and will consider it incidental to JPC Pavement.
501.04.06 Thickness. The Department will measure the pavement thickness tolerance
according to KM 64-309. The Department will not measure the pavement thickness tolerance as a separate pay unit, but will use the pavement thickness tolerance to calculate an adjusted Contract unit price for JPC Pavement, PCC Base, or JPC Shoulders. The Department will not measure coring for payment and will consider it incidental to the concrete pay items.
501.04.07 Ride Quality. When the Contract specifies that rideability applies, the
Department will measure the ride quality in terms of the IRI. The Department will not measure the IRI as a separate pay unit but will use the IRI to calculate a Ride Quality 501-15 Adjustment payment.
501.05 PAYMENT. Department will make payment for the completed and accepted
quantities under the following:
501.05.01 Thickness. The Department will adjust the Contract unit price for JPC
Pavement, PCC Base, and JPC Shoulders by the Schedule for Adjusted Payment for Thickness Deficiency. The adjusted quantity is equal to the area of JPC Pavement, PCC Base, or JPC Shoulder specified in the Kentucky Method, multiplied by the Contract unit price for the item and the Price Adjustment. The Department will not make additional payment for average thicknesses of pavement, base, or shoulders in excess of the specified thickness.
501.05.02 Ride Quality. The Department will apply a Ride Quality Adjustment for
each 0.1-lane-mile section tested. The Department will determine the Ride Quality Adjustments for each 0.1-lane-mile section using the Ride Quality Adjustment Schedule below. The Department will not apply positive ride quality adjustments to 0.1-lane-mile sections where thickness deductions have been applied. The sum of the pay value adjustments for the ride quality shall not exceed $0 for the project as a whole. When requesting tests on partially completed pavement, the Department will perform one test at no charge. The Department will perform additional requested testing and retesting for corrective work or pavement replacement at a cost of $300.00 per lane-mile. The Department will deduct charges for additional requested testing and retesting for corrective work from monies due on the Contract. Code Pay Item Pay Unit 02069-02071, 02073, JPC Pavement Non-Reinforced, Square Yard 02075, 02084, thickness 02086, 02088 02072, 02077, 02078, JPC Pavement Non-Reinforced Shoulder, Square Yard 02081-02083, thickness 02087, 02089 02061, 02064, 02065 PCC Base, thickness Square Yard 02695 Rumble Strips, Type 3 Linear Foot ---- Rideability Testing Each 10060 Ride Quality Adjustment, JPC Each 02060 JPC Pavement Diamond Grinding See Subsection 503.05 Schedule for Adjusted Payment for Thickness Deficiency Thickness Deficiency Price Adjustment (inches) (Percent of Contract Unit Bid Price) 0.00 to 0.20 100 0.21 to 0.30 80 0.31 to 0.40 72 0.41 to 0.50 68 0.51 to 0.75 57 0.76 to 1.00 50 Greater than 1.00 (1)
502.01 DESCRIPTION This specification applies when JPC Pavement is placed on
a project using a mechanical paving syst em. Allowable tolerances are outlined for both dowel bar and tie bar placement in driving lanes and shoulders. Concrete patches will not be tested under this specification except for the instance where corrective work is required on the placement of new JPC Pavement which may require concrete patching. Testing will include longitudinal joints between driving lanes and shoulders if the shoulders are constructed with JPC Pavement. Transverse joints in the shoulders will also be tested if constructed with JP C Pavement. No concrete patching will be tested except for repairs required on new JPC Pavement. Testing JPC Pavement requires at least fourteen days or more of curing time for pavements less than ten inches thick. Fourteen days will be necessary for concrete pavements in excess of ten inches. The concrete should be dry for at least 24 hours prior to testing. This specification specifies the allowable to lerances for placement of dowel bars and tie bars in JPC pavement.
502.02 MATERIALS Conform to Subsection 501.
502.03 Construction
502.03.01 Dowel Bars Transverse dowel bars, which are generally in
baskets, should be located in the center of the slab vertically. They should not be skewed or rotated. Contrary to Sec tion 501 of the Standard Specification and Standard Drawing RPS-020-14, place dowel bars to the tolerances shown in the table below. 502-1 Dimension Tolerance Horizontal offse t + 1 inch Longitudinal translation + 3 inches Horizontal skew ½ inch, max Vertical skew ½ inch, max Vertical depth The minimum distance below the concrete pavement surface must be: DB=T/3 + ½ inch Where: DB = vertical distance in inches, measured from the concrete pavement surface to any point along the top of dowel bar; and T = actual concrete pavement thickness at joint location, in inches. The maximum distance below the surface to any point along the dowel bar should be 2T/3. Dowel bars determined to be out of tolerance are to be marked in the field with marking paint. Corrective work will be re quired with the following circumstances: if 3 or more bars are higher than T/3 + ½ inch from the top of the slab or lower than 2T/3 (as measured from the top) for the bottom of the slab if 3 or more bars are translated longitudinally 3 inches or more if more than two consecutive joints have any bars that are skewed vertically or horizontally Any corrective work shall be completed in accordance with the Current Version of SN 11J – Special Note for Full Depth Concrete Pavement Repair.
502.03.02 Tie Bars Install tie bars at a depth equal to ½ of the slab
thickness. Tie bars shall be perpendicular to the longitudinal joint and parallel with the concrete pavement surface. Installation shall be to the tolerances outlined below. Not less than ½ inch below the saw cut depth of the joints 2” clearance from pavement surface and bottom of pavement Corrective action will be required for the following circumstances: 2 consecutive tie bars are missing or outside of the tolerance listed above 4 or more bars in a slab are missing or outside of the tolerances listed (does not have to be consecutive) The correction shall be made by cross-stitchi ng to place the new tie bars accordingly. 502-2
502.04 Measurement
502.04.01 Testing Limits All driving lanes and shoulders requiring load
transfer assemblies will be tested with Grou nd Penetrating Radar (GPR) equipment. All longitudinal joints will be tested. KYTC will arrange testing. Notify the Engineer at least 7 days prior to testing.
502.04.02 Validation A minimum of one location per lane mile will be
cored to verify GPR testing. Two 4 inch cores shall be obtained at each location. One core will be taken on each dowel bar end to expose both ends and allow physical measurements. KTC will conduct coring while the contractor shall patch all core holes.
502.04.03 Site Conditi Ons Prior To Testing
502.05 PAYMENT . The Department will not measure dowel bars and tie bars for
payment and will consider them incidental to pavement. 502-3 SECTION 503 DIAMOND GRINDING JPC PAVEMENT
503.01 DESCRIPTION. Diamond grind existing JPC pavements. Eliminate faulting at
joints and cracks, restore the ride quality to meet or exceed limits specified, and restore texture to the entire pavement surface.
503.02 Materials and Equipment.
503.02.01 Grinding Machine. Furnish a self-propelled grinding machine with
diamond blades that is specifically designed to smooth and texture JPC pavement. Furnish a machine that is capable of cutting or planing at least 3 feet wide on each pass and that does not encroach on traffic movement outside the work area.
503.02.02 Joint Sealer. Conform to Section 807. Use preformed or silicone rubber.
503.03 Construction.
503.03.01 Test Section. At the beginning of work, grind an initial test section at least
3 feet wide and 100 feet long. The Engineer will evaluate the initial test section to determine if the texture meets the requirements of this section. Modify the blade spacing or other features as necessary to produce the specifi ed texture. Make similar modifications throughout the project to ensure acceptable surface texture.
503.03.02 Diamond Grinding. Grind the entire surface of the JPC pavement
mainline. Grind ramps, tapers, acceleration a nd deceleration lanes, turn lanes, median crossovers, and bridge decks as the Contract specifies. Grind shoulders or gutters when necessary for proper pavement drainage. Grind in a longitudinal direction and parallel to the pavement centerline. Begin and end at lines normal to the pavement centerline. When the end of the cut is subject to public traffic, grind a smooth transition from the smooth pavement to the non-ground pavement. Maintain a constant cross-slope between grinding extremities in each lane to ensure positive lateral drainage. Overlap the edge of grinding passes by less than 2 inches.
503.03.03 Cleaning. Remove solid residue from the pavement surface before traffic
or wind blows it. Perform a separate washing operation to remove residue that may cause dust after the completion of grinding when the Engineer directs. Ensure that waste water and residue do not flow across the pavement, into gutters, or into drainage structures. Dispose of waste water and residue as the Engineer approves.
503.03.04 Lighting. Provide lighting, as the Engineer approves, when grinding
between dusk and dawn.
503.03.05 Joint Seals.
501.03 18.
503.03.06 Pavement Marking. Remove existing pavement marking and provide
503-1 temporary pavement markings according to Section 112 where the Contract specifies.
503.03.07 Texture. The Department will measure the dimensions of the longitudinal
grooves. If the dimensions are not within the following limits, make adjustments to the grinding equipment to achieve the required texture: Groove Dimension Value (inch) Width of grooves Between 0.09 and 0.130 Width between grooves Between 0.08 and 0.125 Height of groove (Peak to bottom) Between 0.031 and 0.063
503.03.08 Alignment Tolerances. The Department will measure the transverse slope
of ground pavement with a straightedge placed normal to the centerline. If a depression or misalignment of slope greater than 0.25 inch in 12 feet occurs, adjust the grinding equipment to correct the misalignment. The Engineer will measure the alignment of the top of the pavement surface across the joint and cracks. Correct all misalignments that exceed 0.063 inch by additional grinding.
503.03.09 Ride Quality. Conform to Section 501 with the following exceptions:
503.04 Measurement.
503.04.01 JPC Diamond Grinding. The Department will measure the quantity in
square yards. The Department will measure the width as the width shown on the typical cross section of the Plans and the length horizontally along the centerline of each lane or ramp. The Department will not measure correct ive work for payment. The Department will not measure the ride quality to calculate an adjusted unit price for this item of work.
503.04.02 Joint Sealing. The Department will measure Joint Sealing by linear feet.
The Department will not measure removing existing joint material or cleaning joints for payment but will consider them incidental to this item of work.
503.05 PAYMENT. The Department will make payment for the completed and accepted
quantities under the following: Code Pay Item Pay Unit 02060 JPC Pavement Diamond Grinding Square Yard 08540 Joint Sealing Linear Foot The Department will consider payment as full compensation for all work required under this section. 503-2 SECTION 504 BREAKING AND SEATING JPC PAVEMENT
504.01 DESCRIPTION. Break and seat existing JPC pavement for full depth and full
panel width.
504.02 Materials and Equipment.
504.02.01 Asphalt Material. Conform to Subsection 403.02.
504.02.02 Impact Hammer. Break the pavement with an impact hammer capable
of delivering sufficient energy to break the pavement. Furnish a hammer having a breaker equipped with a plate-type shoe designed to prevent penetration into the existing surface. The Department may approve other equipment according to Subsection 108.06. When necessary, provide a screen for the hammer to protect vehicles in the adjacent lane from flying concrete chips during the breaking process.
504.02.03 Pneumatic-Tire Proof Roller. Furnish a pneumatic-tire proof roller,
weighing a minimum of 35 tons, of one of the following types. A roller having the following:
504.03 CONSTRUCTION. Break and seat the existing pavement. Place specified
succeeding leveling, asphalt base, and asphalt binder courses one lane at a time. Furnish and place asphalt mixtures according to Division 400 for the appropriate mixture. Exercise care during breaking and seating to prevent damage to underground utilities and drainage facilities.
504.03.01 Breaking of JPC Pavement.
504.03.02 Seating of Broken JPC Pavement. After breaking, seat the broken
concrete by rolling with a pneumatic-tire proof roller. Make at least 5 one-way passes with a minimum 50-ton roller, or 7 one-way passes with a minimum 35-ton roller. Use a rolling pattern that will ensure that the entire area of the broken pavement is well seated and is thoroughly and uniformly compacted. Remove any large rocking fragments and fragments that are displaced more than 1/2 inch above the original pavement surface elevation after seating and fill the resulting void with asphalt and compact or tamp.
504.03.03 Placement of Edge Drains. When the Contract includes installation of
pavement edge drains, install the edge drains at least 2 weeks before breaking and seating operations.
504.03.04 Placement of Asphalt. Sweep the broken and seated pavement clean of
foreign material using mechanical sweepers and hand brooms. Place the asphalt base following the breaking and seating operation as closely as practical according to Subsection 403.03. Do not allow the broken pavement to remain exposed more than 24 hours. If the broken pavement is exposed more than 24 hours, suspend the breaking operations until all broken existing pavement has been covered by at least one course of asphalt base. Make any required changes to the cross slope with the paving of the base courses. Cure the fist course of base at least 8 hours before placing the second course. Do not open a lane to public traffic until 2 courses of asphalt (not including leveling courses) are in place. Offset the longitudinal joints in the asphalt 6 inches according to Subsection 403.03.07. Perform leveling and wedging according to Subsection 403.03.09 on top of the first course of asphalt, and not on the existing pavement. However, at specific locations where the Engineer deems a substantial amount of leve ling is necessary, level and wedge directly on the broken and seated pavement. Correct deviations in the surface by leveling and wedging on each succeeding course unless the Engi neer directs or approves in writing that the leveling and wedging be delayed until after placing the succeeding courses. Construct asphalt courses succeeding the first 2 courses according to the Contract.
504.04 Measurement.
504.04.01 Breaking and Seating Pavement. The Department will measure the
quantity in square yards. The Department will measure the width as the actual width of the original JPC pavement, and the length as the horizontal length along the centerline of each roadway or ramp.
504.04.02 Leveling and Wedging. The Department will measure quantity according
to Subsection 403.04.
504.04.03 Asphalt Mixtures. The Department will measure quantity according to
Subsection 403.04 for the appropriate mixture.
504.05 PAYMENT. The Department will make payment for the completed and
accepted quantities under the following: Code Pay Item Pay Unit 02107 Breaking and Seating Pavement Square Yard 504-2 00190 Leveling and Wedging, PG 64-22 See Subsection 403.05 ---- Asphalt Mixtures See Subsection 403.05 The Department will consider payment as full compensation for all work required under this section. 504-3 SECTION 505 CONCRETE SIDEWALK S, STEPS, AND ENTRANCE PAVEMENTS
505.01 DESCRIPTION. Construct concrete sidewalks, steps, and entrance pavements,
with or without reinforcement, on a prepared s ubgrade, in one course, to the dimensions and design specified in the Plans and Standard Drawings. This work does not include sidewalks constructed integral with bridges or culverts.
505.02 Materials and Equipment
505.02.01 Concrete. Conform to Subsection 601.02 and 601.03.
505.02.02 Steel Reinforcement. Conform to Section 811.
505.02.03 Joint Materials. Conform to Section 807, preformed fillers.
505.02.04 Aggregate. Conform to Section 804 and 805.
505.02.05 Forms. Conform to Subsection 601.02.
505.02.06 Pavers. Conform to ASTM C 936, ASTM C 902 Class SX – Type I, or
ASTM C 1272 – Type R or F. Ensure the concrete pavers have a minimum thickness of 2 inches and truncated domes as shown in the Standard Drawings. Ensure their color is homogeneous throughout the paver and contrasts visually with adjoining surfaces, either light-on-dark or dark-on-light. The Department will allow either yellow or red as colors.
505.02.07 Mortar. Conform to Subsection 601.03.03.
505.03 CONSTRUCTION. Construct sidewalks, steps, and entrance pavements on a
prepared, compacted, smooth subgrade of uniform density formed by trenching or filling to the required elevation. Use Class A concrete according to Subsection 601.03. When desired, use Class P concrete according to Subsection 501.03 for the construction of entrance pavements. Remove large boulders and ledge rock found in the subgrade to a minimum depth of 6 inches below the finished subgrade elevation, backfill the space with material that the Engineer approves, and t horoughly compact by rolling or tamping. Furnish a template, and check the subgrade before depositing concrete. Moisten the subgrade immediately before placing concrete. Place a 2-inch thick course of No. 610 coarse aggregate on the prepared subgrade before placing concrete for steps. Form all steps and cast them to the dimensions specified in the Contract. Reinforce all steps according to the Standard Drawings. Round all exposed edges and corners to a 1/4 inch radius. When there are 3 or more steps, install handrail of the type specified in the Contract according to Section 720.
505.03.01 Forming. Place sidewalks and entrance pavements by use of side forms
or an approved slip form method according to Subsection 601.03.12.
505.03.02 Straight edging and Edging.
Before giving the concrete sidewalk and entrance pavement the final finish and brooming, check the surfaces with a 10-foot 505-1 straightedge and eliminate all irregularities of more than 1/4 inch.
505.03.03 Joints.
505.03.04 Detectable Warnings. Install detectable warning pavers at all sidewalk
ramps and on all commercial entrances with traffic control devices according to the Standard Drawings. Mortar all pavers in place. Ensure the detectable warnings extend the full surface width and a minimum length of 2 feet up the ramp. If a walkway crosses or adjoins a vehicular way, and the pedestrian walking surface is not separated by curbs, railings, or other elements, define the boundary between the areas with a continuous 2-foot minimum width detectable warning.
505.03.05 Curing and Backfilling. Cure concrete sidewalks, steps, and entrance
pavements according to Subsection 601.03.17. After the concrete has set sufficiently, remove forms and backfill areas adjacent to the concrete. Compact and grade the backfill.
505.04 Measurement.
505.04.01 Concrete Sidewalk. The Department will measure the quantity in square
yards.
505.04.02 Concrete Entrance Pavement. The Department will measure the quantity
in square yards.
505.04.03 Class A Concrete for Steps. The Department will measure the quantity
according to Subsection 601.04. The Department will not measure excavation, steel reinforcement, or crushed aggregate for steps for payment and will consider them incidental to this item of work.
505.04.04 Detectable Warnings. The Department will measure the quantity in square
feet. All retrofit applications for maintenance projects will require the removal of existing sidewalks to meet the requirements of the standard drawings applicable to the project. The cost associated with the removal of the existing sidewalk will be incidental to the detectable warnings bid item or incidental to the bid item for the construction of the concrete sidewalk unless otherwise noted.
505.04.05 Roadway Excavation. The Department will measure the quantity
505-2 according to Subsection 204.04.
505.04.06 Embankment-In-Place. The Department will measure the quantity
according to Subsection 206.04.
505.05 PAYMENT. The Department will make payment for the completed and accepted
quantities under the following: Code Pay Item Pay Unit 02719, 02720, 02723 Sidewalk, Thickness, Concrete Square Yard 02101, 02099 Cement Concrete Entrance Square Yard Pavement, Thickness 02551 Concrete, Class A for Steps See Subsection 601.05 02200 Roadway Excavation See Subsection 204.05 02230 Embankment-In-Place See Subsection 206.05 23158ES505 Detectable Warnings Square Foot The Department will consider payment as full compensation for all work required under this section. 505-3 SECTION 506 CONCRETE CURBS AND GUTTERS
506.01 DESCRIPTION. Construct, on a prepared subgrade according to the Standard
Drawings, concrete curb and gutter, concrete valley gutter, concrete header curb, and concrete integral curb.
506.02 Materials.
506.02.01 Concrete. Conform to Subsection 601.02 and 601.03.
506.02.02 Steel Reinforcement. Conform to Section 811.
506.02.03 Joint Fillers. Conform to Section 807, preformed fillers.
506.02.04 Forms. Conform to Subsections 501.02. and 601.02.
506.02.05 Fine Aggregate. Conform to Section 804.
506.02.06 Coarse Aggregate. Conform to Section 805.
506.03 Construction.
506.03.01 Header Curb, Valley Gutter, and Curb and Gutter (Combination). Use
combination curb and gutter in conjunction with asphalt pavements. Construct combination curb and gutter according to the typical section in the Plans. Use header curb in conjunction with either asphalt or JPC pavement where the depth of pavement is a minimum of one foot or where the thickness of asphalt pavement is variable. Construct header curb before placing pavement. Construct valley gutter according to the Plans and Standard Drawings. Prepare the foundation by excavating or constructing the embankment to the required subgrade elevation on which the curb, gutter, or combination curb and gutter is to be placed. Remove all soft, yielding, or otherwise unsuitable material, and replace it with stable materials according to Section 207, and compact and finish the subgrade to a firm even surface. Use Class A concrete according to Subsection 601.03. Place concrete either by use of side forms or by an approved slip forming method according to Subsection 501.02.11. When indicated or directed, form entrance and drainage openings of the required dimensions through the curbs at the designated location. Prepare the subgrade as required and moisten before placing concrete. During placement, thoroughly spade the concrete and vibrate or tamp it until the mortar entirely covers the surface and eliminate all honeycomb and voids. Place concrete so that no concrete reaches initial set before placing the following lift. Strike off and float surfaces so all coarse aggregate is well below the surface. Place reinforcing steel according to the details specified in the Contract. Construct contraction joints as specified in Subsection 501.03.17 D). Construct expansion joints at all breaks in alignment, at all drainage boxes and other fixed objects, at the beginning and ending points of curves, and at the beginning, quarter, middle, and ending points of semicircular curves , except the Engineer will not require joints at the quarter points for semicircles having radii of 5 feet or less. Give the top surfaces of curbs a uniform float finish and round edges according to the Standard Drawings. Correct all honeycombed areas by filling with mortar. Do not plaster. Finish the top and face of all curbs while the concrete is plastic by wetting and rubbing with a carborundum brick or wooden block. Finish th e face of header curbs to 2 inches below the gutter line or the finished groundline. Before giving the concrete the final finish, check surfaces with a 10-foot straightedge and eliminate all irregularities of more than 1/4 inch. Finish concrete to a smooth surface, presenting a uniform texture and color. Cure the concrete according to Subsection 501.03.15. Construct precast curbs to the length and shape, and reinforce according to the Standard 506-1 Drawings. Cast, finish, and cure precast curbs according to Section 605.03. Set precast curbs to conform to the line and grade specified in the Plans with tight joints. Fill all joints except expansion joints with mortar. When the precast curb is set, fill all remaining excavated areas with material that the Engin eer approves in lifts not exceeding 6 inches in depth and tamp.
506.03.02 Integral Curb. Use integral curb in conjunction with JPC pavements where
a portion of the JPC pavement is the gutter. Construct according to Subsection 506.03.01 except for the following:
506.04 Measurement.
506.04.01 Header Curb. The Department will measure the quantity in linear feet
along the face of the curb.
506.04.02 Valley Gutter. The Department will measure the quantity in linear feet
along the flowline of the gutter. 506-2
506.04.03 Curb and Gutter (combination). The Department will measure the
quantity in linear feet along the flowline of the gutter.
506.04.04 Integral Curb. The Department will measure the quantity in linear feet
along the top of the curb.
506.05 PAYMENT. The Department will make payment for the completed and accepted
quantities under the following: Code Pay Item Pay Unit 01875-01877, 01880, 01885, 01890, 01891 Type, Header Curb Linear Foot 01895 Valley Gutter Linear Foot 01810, 01811, 01815, 01820, 01821, 01825 Type, Curb and Gutter Linear Foot 01830, 01831, 01840, 01841, 01845, 01847 Type, Integral Curb Linear Foot The Department will consider payment as full compensation for all work required under this section. 506-3 SECTION 507 CONCRETE MOUNTABLE MEDIAN AND STANDARD BARRIER MEDIAN
507.01 DESCRIPTION. Prepare the foundation for the mountable median or standard
barrier median, furnish, place, consolidate, fini sh, and cure concrete, and construct all joints necessary for completing the work.
507.02 Materials.
507.02.01 Concrete. Conform to Subsection 601.02 and 601.03.
507.02.02 Steel Reinforcement. Conform to Section 811.
507.02.03 Joint Material. Conform to Section 807, preformed fillers.
507.02.04 Forms. Conform to Subsection 601.02.
507.03 CONSTRUCTION. Construct concrete mountable medians or standard barrier
medians on the accepted prepared subgrade, or the completed and accepted base course or old pavement. Use Class A concrete according to Subsection 601.03 or Class P concrete according to Subsection 501.03. When required, place dowel bars according to the Contract. Place concrete either by use of side forms or by an approved slip forming method according to Subsection 601.03.12. When constructing medians in conjunction with JPC pavement, construct transverse joints at the same intervals and locations as joints in the adjacent pavement. When constructing medians in conjunction with asphalt pavement, space transverse joints at intervals of 30 feet or less to provide uniform sp acing. Construct all median joints as either 1/2-inch expansion joints filled with preformed joint filler or 1/8-inch sawed joints. When sawing, construct median joints according to Subsection 501.03.17. The Engineer will not require steel dowels in either type of joint. Cure concrete placed in the median according to Subsection 501.03.15.
507.04 Measurement.
507.04.01 Standard Barrier Median. The Department will measure the quantity in
square yards.
507.04.02 Mountable Median. The Department will measure the quantity in square
yards.
507.05 PAYMENT. The Department will make payment for the completed and accepted
quantities under the following: Code Pay Item Pay Unit 01915-01923 Standard Barrier Median, Type Square Yard 01935-01950 Mountable Median, Type Square Yard The Department will consider payment as full compensation for all work required under this section. 507-1 SECTION 508 PERMANENT CONCRETE MEDIAN BARRIERS
508.01 DESCRIPTION. Prepare the foundation for the median barrier; furnish, place,
consolidate, finish, and cure the barrier; cons truct all transverse joints; construct other incidentals necessary to complete the work; and attach delineators and other appurtenances when specified in the Contract.
508.02 Materials and Equipment.
508.02.01 Concrete. Conform to Subsection 601.02 and 601.03.
508.02.02 Steel Reinforcement. Conform to Section 811.
508.02.03 Joint Material. Conform to Section 807, preformed fillers.
508.02.04 Dowel Bars. Conform to Section 811.
508.02.05 Tie Bars for Precast Sections. Conform to Section 811.
508.02.06 Mortar Sand. Conform to Section 804.
508.02.07 Cement. Conform to Section 801.
508.02.08 Water. Conform to Section 803.
508.02.09 Masonry Coating. Conform to Section 828.
508.02.10 Delineators for Barriers. Use Stimsonite Marker 962, AKT Corporation
Marker No. 181, or a Department approved equal.
508.02.11 Forms. Conform to Subsection 601.02. In addition to the requirements for
slip forms, use a slip form or extrusion machine that is equipped with automatic guidance controls capable of sensing grade and alignment from an outside reference consisting of a taut line or wire.
508.03 CONSTRUCTION. Construct concrete median barriers of each type to the lines,
grades, cross section, and details specified in the Plans and Standard Drawings. Use Class A concrete according to Subsection 601.03. When it is necessary to transition the concrete median barrier into a section different from the uniform section specified in the Plans, such as at a bridge pier, sign pedestal, or bridge end wall, do so in a smooth, uniform manner as shown on the Standard Drawings. Provide concrete median barrier that are precast, cast-in-place using fixed forms, or slip formed according to Subsection 601.03.12. Bevel the upper longitudinal edge of the barrier 7/8 inch, or construct it to a radius satisfactory to the Engineer. When required, construct items such as delineators and conduit according to the Contract. Secure conduit to prevent movement. Cure cast-in-place concrete median barriers according to Subsection 501.03.15. Use the same method of curing on each continuous section of the barrier. Cure precast concrete median barriers according to Subsection 605.03.05.
508.03.01 Fixed Form Construction. Construct 1/2-inch transverse expansion joints
throughout the entire cross section at uniform inte rvals of no less than 15 feet or greater than 25 feet. For construction in conjunction with JPC pavements, locate transverse expansion joints so that a joint occurs at the same stations as that of the rigid pavement transverse joints. Construct additional transverse contract ion joints in the barrier if necessary to maintain the 15 to 25-foot interval. Fill all transverse and longitudinal joints with preformed 508-1 joint filler. Construct one-inch expansion joints over expansion joints in rigid pavement or base. Construct 1/2-inch expansion joints when the barrier abuts a bridge and at all box inlets, lamp posts, sign posts, and similar structures that project through, into, or against the concrete median barrier. The Department will allow construction of joints according to Subsection 508.03.02. Conform to the tolerance requirements of Appendix A, Tabulation of Construction Tolerances. Uniformly coat the median barriers with masonry coating.
508.03.02 Slip Form Construction. Suspend reference lines from supports set at
intervals no greater than 10 feet on vertical and horizontal curves or 25 feet on uniform grades or tangents. Do not use ski or shoe se nsors to reflect the grade of the subgrade unless the ski or shoe can ride on the completed pavement surface. Provide a construction joint between the base and the barrier. Construct a 2 by 4-inch key, either depressed or raised, in the base. Insert steel dowels in the plastic concrete immediately behind the slip form machine at the locations shown on the Standard Drawing. Place the base using slip form or extrusion methods. Immediately repair all surface pits larger than 1/2 inch in diameter and all gouges behind the slip form machine. The Engineer will not require further finishing, other than a light longitudinal brushing or brooming. Provide short sections, such as sections adj acent to structures, terminal sections, etc. that are cast using fixed forms. Construct one-inch transverse expansion joints at intervals no greater than 500 feet. Construct one-inch transverse expansion joints over all transverse expansion joints in rigid pavement or base. Construct 1/2-inch expansion joints when the barrier abuts a bridge and at all box inlets, lamp posts, and similar structures that project through, into, or against the concrete median barrier. Fill all transverse and longitudinal joints with preformed joint filler. Construct 1/8-inch transverse contraction joints 2 inches deep at uniform intervals of 20 to 30 feet. Make contraction joints by cutting into the plastic concrete using an edging tool and trowel, using removable inserts, or sawing. When sawing contraction joints, saw as soon as practical after the concrete has set sufficiently to preclude raveling, and before any shrinkage cracking occurs in the concrete. The Engineer will not require sealing of contraction joints. Construct construction joints as one-inch expansion joints. When constructing a concrete median barrier over JPC pavement or base, locate transverse joints in the barrier to match transverse joints in the pavement or base. Construct additional transverse contraction joints in the barrier if necessary to maintain the 20 to 30-foot interval specified above. When constructing transverse joints in the JPC pavement or base at variable intervals, adjust the joint interval in the wall to match the joint interval in the pavement or base and construct additional joints as necessary to avoid exceeding the 30-foot maximum interval. Conform to the tolerance requirements of Appendix A, Tabulation of Construction Tolerances
508.03.03 Precast Construction. Construct precast units according to Section 605
and approved drawings. Place the precast units on a bed of mortar, and trim and discard excess mortar. Uniformly coat the median barriers with masonry coating. When precast concrete median barriers are specified or allowed for installation on an existing facility, anchor them as the Plans specify. When using precast units, cast short sections, transitions, terminal sections, and other supplemental sections using fixed forms. When casting threaded inserts into the barrier for use in lifting, protect the inserts by installing a solid, full-length, threaded, plastic bolt, coated with waterproof grease. Install the bolt immediately after manufacturing the barri er section. Leave the bolt in place at all times while the barrier is in storage or in service, except when using the insert for lifting. Entirely fill joints between units, including the 2 by 10-inch groove, with grout composed of one part mortar sand and 2 parts cement with enough water to make the mixture plastic. 508-2 When the barrier abuts a bridge or other rigid structure, cut off the tie bars or fill the groove with grout, as applicable, and install 1/2-inch preformed joint filler in the joints. Install 1/2-inch preformed joint filler at all box inlets, lamp posts, sign posts, and similar structures that project through, into, or against the concrete median barrier. Conform to the tolerance requirements for cast-in-place construction of Appendix A, Tabulation of Construction Tolerances. Ensure that all concrete median barrier are uniform in appearance, and true to line and grade. Repair or remove and replace all porti ons of the barrier that are not within the specified tolerances, or precast units that cannot be correctly installed.
508.04 Measurement.
508.04.01 Concrete Median Barrier. The Department will measure the quantity in
linear feet along the top centerline of the barrier. The Department will not measure furnishing, installing, or maintaining lifting devices in precast median barriers for payment and will consider them incidental to this item of work. The Department will not measure portions of the barrier that are not within the specified tolerances, precast units that are not correctly installed, or damaged units.
508.04.02 Concrete Terminal Sections. The Department will measure the quantity
by each individual unit.
508.04.03 Delineators for Barriers. The Department will measure the quantity by
each individual unit.
508.04.04 Masonry Coating. The Department will measure the quantity according
to Subsection 601.04.
508.05 PAYMENT. The Department will make payment for the completed and accepted
quantities under the following: Code Pay Item Pay Unit 01953, 01955, 01967, Concrete Median Barrier, Type Linear Foot 01988, 01989, 01992, 01999 01956-01957 Concrete Terminal Section, Type Each 01984, 01985 Delineator for Barrier, Color Each 02998 Masonry Coating See Subsection 601.05 The Department will consider payment as full compensation for all work required under this section. 508-3 SECTION 509 TEMPORARY CONCRETE MEDIAN BARRIERS
509.01 DESCRIPTION. Furnish, install, maintain, and remove temporary precast
concrete median barriers. The Department will furnish the concrete median barriers when specified in the Contract. The Department may allow the use of similar units that conform to the National Cooperative Highway Research Program (NCHRP) 350 Test Level 3 (TL-3) requirements and the typical features depicted by the Standard Drawings. Obtain the Engineers approval prior to use. Ensure the barrier wall shape, length, material, drain slot dimensions and locations typical features are met and the repor ted maximum deflection is 3 feet or less from the NCHRP 350 TL-3 for Test 3 – 11 (pickup truck impacting at 60 mph at a 25-degree angle.)
509.02 Materials.
509.02.01 Concrete. Conform to Subsection 601.02 and 601.03.
509.02.02 Steel Reinforcement. Conform to Section 811.
509.02.03 Connector Bar Pins. Conform to ASTM A 36. Galvanize after forming
according to AASHTO M 111.
509.02.04 Top Connectors. Conform to ASTM A 36. Galvanize after forming
according to AASHTO M 111.
509.02.05 Bottom Connectors. Conform to ASTM A 36. Galvanize according to
AASHTO M 111 after forming.
509.02.06 Tack Welding. Conform to Subsection 605.03.04.
509.02.07 Delineators for Barriers. Use either Stimsonite Marker 962, AKT
Corporation Marker No. 181, or a Department approved equal.
509.02.08 Connector Pins. Conform to ASTM A 307, bolt grade A, national coarse
thread 7 threads per inch.
509.03 CONSTRUCTION. Construct concrete median barriers according to Section 605
and the Standard Drawings. Use Class A concrete and provide all concrete with an ordinary surface finish according to Subsection 601.03. 18. Place delineators according to the Standard Drawings. Lift and place the barrier units using a 2 point pickup, or another approved method. Do not lift units by the connectors. When casting threaded inserts into the barrier for use in lifting, protect the inserts by installing a solid, full-length, threaded, plastic bolt, coated with waterproof grease. Install the bolt immediat ely after manufacturing the barrier section. Leave the bolt in place at all times while the barrier is in storage or in service, except when using the insert for lifting. Do not use any unit which has been cracked, chipped, scarred, or otherwise damaged or disfigured unless the Engineer approves. Install the units at the locations specified in the Plans, and connect them in the manner detailed on the Plans and Standard Drawings. Keep delineators clean and provide replacement delineators when necessary. For all units in a continuous run, use units of the same type and height, and provide a smooth transition. Replace all units damaged after installation with an undamaged unit. When the units are no longer needed, remove the units from the project. Take ownership of all units except Department furnished units. Transport Department furnished units to the location specified in the Contract. 509-1
509.04 Measurement.
509.04.01 Temporary Concrete Median Barrier. The Department will measure the
quantity furnished, installed, maintained, and removed by multiplying the nominal length of each unit in linear feet by the number of units. The Department will measure units installed to replace units damaged by traffic. The Department will not measure the disposal of units or units installed to replace units damaged by construction operations for payment and will consider them incidental to this item of work. The Department will not measure furnishing, installing, or maintaining lifting devices for payment and will consider them incidental to this item of work.
509.04.02 Install Temporary Concrete Median Barrier. The Department will
measure the quantity, installed, maintained, and removed by multiplying the nominal length of each unit in linear feet by the number of units. The Department will furnish the barrier. The Department will measure units installed to replace units damaged by traffic. The Department will not measure the disposal of units or units installed to replace units damaged by construction operations for payment and will consider them incidental to this item of work. The Department will not measure furnishing, installing, or maintaining lifting devices for payment and will consider them incidental to this item of work.
509.04.03 Relocate Temporary Concrete Median Barrier. The Department will
measure the quantity relocated by multiplying the nominal length of each unit in linear feet by the number of units.
509.04.04 Delineator for Barrier. The Department will measure the quantity by the
individual unit, including replacement units.
509.05 PAYMENT. The Department will make payment for the completed and accepted
quantities under the following: Code Pay Item Pay Unit 03171 Concrete Barrier Wall Type, 9T(1) Linear Foot 01992 Install Temporary Concrete Median Barrier (2) Linear Foot 02003 Relocate Temporary Concrete Median Barrier Linear Foot 01984, 01985 Delineator for Barrier, Color Each (1)The Department will pay 90 percent of the quantity upon satisfactory installation of the units. The Department will pay the remaining 10 percent upon removal of the units from the project or upon placement to their final location. (2)The Department will pay 75 percent of the quantity upon satisfactory installation of the units. The Department will pay the remaining 25 percent upon removal of the units from the project or upon placement to their final location. The Department will consider payment as full compensation for all work required under this section. 509-2 SECTION 510 SEALING AND PATCHING CONCRETE WITH EPOXY RESIN
510.01 DESCRIPTION. Seal concrete surfaces, except JPC pavement, with an epoxy
resin seal, and patch concrete surfaces, except JPC pavement, with an epoxy resin mortar patch. Fill low areas with the patch material.
510.02 Materials and Equipment.
510.02.01 Epoxy Resin. Conform to Section 826.
510.02.02 Mortar Sand. Conform to Section 804.
510.02.03 Sand for Epoxy Seal Coats. Conform to Section 804.
510.02.04 Sandblasters. Provide sandblasters that are equipped with traps to prevent
water or oil from being deposited on the surface.
510.02.05 Drills. Provide rotary, electric, 1/2-inch drills with a paddle or other mixing
devices approved by the Engineer.
510.03 CONSTRUCTION. Allow new concrete to cure at least 14 calendar days before
applying any epoxy sealant or epoxy mortar patch. Do not apply to JPC pavement. Seal and patch JPC pavement as specified in the Contract. Ensure that the surface temperature of concrete surfaces to be sealed or patched is at least 60 °F. In cool weather, provide artificial heat using space heaters or infrare d heaters. When providing artificial heat, maintain a surface temperature between 60 and 95 °F until the epoxy seal or epoxy mortar patch has cured.
510.03.01 Preparation of Concrete Surface for Sealing or Patching. Prepare
concrete surfaces to be epoxy sealed or epoxy mortar patched by removing all laitance, deteriorated concrete, and deposits of oil, grease, and other adherent foreign materials. Remove oil, grease, and other adherent foreign materials using solvents, heavy detergents, or mechanical means such as scraping. Then, prepare the surfaces by grinding, sandblasting, retexturing, or chipping to remove all laitance and unsound concrete. Immediately before applying the epoxy seal or epoxy mortar patch, remove all dust, grit, and debris from the surface.
510.03.02 Mixing Epoxy Resin. Thoroughly stir the contents of the separate packages
containing component A and component B before combining the 2 components. Do not use the same mixer or paddle to mix component A as is used to mix component B. Combine the 2 components in a clean metal or polyethylene vessel. Combine the components in the proportions and mix them according to the manufacturer’s recommendations. Only mix the material in quantities that can be used within the pot life of the mixture.
510.03.03 Mixing Epoxy Mortar for Patching. Establish the proportions of epoxy
resin and mortar sand for the epoxy mortar mixture according to the manufacturer’s instructions. Mix the epoxy mortar with a drill equipped for mixing. Gradually add mortar sand to the epoxy resin, and continue mixing the materials to obtain a uniform mixture.
510.03.04 Application of Epoxy Mortar for Patching. Prime areas to be patched
immediately before placing the epoxy mortar. Thoroughly brush or scrub the epoxy resin for the prime onto the prepared surface to be patched. Then place the epoxy mortar over the primed area. Tamp, rod, and consolidate the epoxy mortar into place to exclude internal voids within the mortar mixture. Level or fini sh the mortar surface to the specified surface. Finish or treat the surface to conform to the surface texture of the concrete surrounding the patched area. 510-1 After the patch has cured, broom, vacuum, or blow away all loose material from the area, and remove it from the pavement or deck. Do not allow traffic on the patched areas until the resinous material has hardened for the amount of time specified in the manufacturer’s specifications.
510.03.05 Epoxy Seal Coat. Place the epoxy seal coat and the sand for the epoxy seal
coat according to the manufacturer’s instructions.
510.04 MEASUREMENT. The Department will not measure concrete sealing or
patching for payment and will consider them incidental to the bid item being patched or sealed.
510.05 PAYMENT. The Department will not make payment for concrete sealing or
patching. 510-2 SECTION 511 GROUTING AND EPOXY BOND COAT
511.01 DESCRIPTION. Install steel dowel bars or deformed reinforcement steel bars
into existing concrete using grout that provides a bond between the steel and concrete, and bond plastic concrete to hardened concrete using an epoxy bond coat.
511.02 Materials.
511.02.01 Epoxy Resin. Conform to Section 826.
511.02.02 Cement. Conform to Section 801.
511.02.03 Water. Conform to Section 803.
511.02.04 Mortar Sand. Conform to Section 804.
511.02.05 Steel Reinforcement. Conform to Section 811.
511.02.06 Dowel Bars. Conform to Section 811.
511.03 Construction.
511.03.01 Grouting. Drill holes of the size recommended by the manufacturer for the
insertion of bars using masonry bits to the depth specified in the Contract or the manufacturer’s specifications and to the tolerances in Appendix A, Tabulation of Construction Tolerances. Keep holes clean and dry at all times. Blow holes clean before grouting. Use bars that are free of rust, mill s cale, oil, grease, and other foreign substances. Grout with epoxy grout, expanding grout, or other grout on the Department’s List of Approved Materials. For epoxy grout, mix the epoxy resin according to Subsection 510.03.02. For expanding grout, mix it according to the manufacturer’s instructions. Pour or force the grout into the drilled holes, and apply a coating of at least 0.02 inch of grout to the portions of the bars being inserted into the ho les. Slowly insert the coated bars into the full depth of the holes with a twisting motion. After insertion, look for a light overflow of grout, which indicates complete filling of the drill holes. When this overflow does not occur, immediately remove the bars, place additional grout in the holes, and reinsert the bars. Wipe away all excess grout. After placement and during the hardening of the grout, do not disturb the bars.
511.03.02 Epoxy Bond Coat. Mix the epoxy resin according to Subsection 510.03.02.
Mix and apply the epoxy bond coat mixture according to the manufacturer’s instructions. Apply the epoxy bond coat only to clean, dry, structurally sound concrete surfaces. Clean surfaces as specified in the Plans or as dir ected by the Engineer before applying the epoxy mixture.
511.04 MEASUREMENT. The Department will not measure grouting or epoxy bond
coat for payment and will consider them incidental to the bid item being grouted or epoxy bond coated.
511.05 PAYMENT. The Department will not make payment for grouting or epoxy bond
coat. 511-1 SECTION 512 HOOK BOLTS WI TH EXPANSION ANCHORS
512.01 DESCRIPTION. Furnish and install epoxy coated hook bolts with expansion
anchors for use in JPC pavement widening or concrete culvert extensions.
512.02 Materials.
512.02.01 Hook Bolts with Expansion Anchors. Conform to Section 811. In
addition, ensure that the installed bolts, when tested just before placement of the adjoining concrete, can resist a pull-out load of 9,000 pounds.
512.02.02 Epoxy Coating Material. Conform to Section 811.
512.03 CONSTRUCTION. Epoxy coat and install hook bolts according to the
installation requirements for epoxy coated steel reinforcement bars in Subsection 602.03 and the Standard Drawings. Install hook bolts with expansion anchors at the location specified in the Plans or directed by th e Engineer according to the manufacturer’s instructions.
512.04 Measurement.
512.04.01 Hook Bolts with Expansion Anchors. The Department will measure the
quantity by each individual unit. The Department will not measure epoxy coating for payment and will consider it incidental to this item of work.
512.05 PAYMENT. The Department will make payment for the completed and accepted
quantities under the following: Code Pay Item Pay Unit 02587 Hook Bolt with Expansion Anchor Each The Department will consider payment as full compensation for all work required under this section. 512-1
Division 600
STRUCTURES AND CONCRETE SECTION 601 CONCRETE
601.01 DESCRIPTION. Use concrete consisting of a mixture of cement, fine aggregate,
coarse aggregate, and water, with admixtures as specified, combined in the proportions and mixed to the consistency specified, when forming or casting to dimensions specified in the Plans or as the Engineer directs. Provide the materials, material proportions, equipment, and construction methods necessary to ensure that the concrete produced conforms to the Contract. Structural concrete is concrete fo r structures such as bridges, culverts, and retaining walls and other items detailed as structures in contract documents. Non-structural concrete is all other concrete.
601.02 Materials and Equipment.
601.02.01 Steel Reinforcement. Conform to Section 811.
601.02.02 Cement. Conform to Section 801. Use Type I cement. The Department
will allow the use of Type IP( ≤20), Type IS( ≤30), Type IL(5-15), Type II, Type III, and Type V when the Engineer approves. The Engineer will condition his approval upon satisfactory means of storage and handling to ensure the ready identification of these cements when used in portions of the work. . If unsatisfactory test results are obtained using Type IP( ≤20), Type IS( ≤30), Type IL, Type II, or Type III, or Type V cement complete the work using Type I cement. Do not intermix cement types in any structural unit except when finishing with Type I. Discontinue the use of Type V cement used for the purpose of sulfate resistance if unsatisfactory results are obtained. Provide a new mix design addressing sulfate exposure shall be submitted for approval.
601.02.03 Admixtures. Conform to Section 802. Use air-entraining and water
reducing admixtures in all classes of concrete. Water reducing admixtures are not required when slip forming is used for concrete placement. Use other admixtures when the Engineer directs or approves.
601.02.04 Water. Conform to Section 803.
601.02.05 Fine Aggregate. Conform to Section 804.
601.02.06 Coarse Aggregate. Conform to Section 805.
601.02.07 Joint Materials. Conform to Section 807.
601.02.08 Structural Steel. Conform to Section 812.
601.02.09 Miscellaneous Metals. Conform to Section 813.
601.02.10 Concrete Curing Materials. Conform to Section 823.
601.02.11 Masonry Coating. Conform to Section 828.
601.02.12 Mineral Admixtures. Conform to Section 844.
601.02.13 Forms. Provide forms that are mortar tight, true to the dimensions, lines,
and grades of the structure, and of sufficient strength to prevent appreciable deflection during placing concrete.