Illinois Department of Transportation (IDOT) · Standard Specifications for Road and Bridge Construction

Section 1074 — CONTROL EQUIPMENT

Illinois Standard Specifications for Road and Bridge Construction, Section 1074. Full text, cross-references and related pay items on BuildSpec.

Control Equipment Art. 1074.01 1007 operation, that is, traffic responsive, time of day, or free, and the timing plan in effect for the coordinated operation, that is, cycle length, split, and offset. The display shall be capable of displaying indicators for all used controller phases and associated pedestrian phases, overlap phases, local detector actuation, and system detector actuation. d. System Diagnostics. 1. Local Controller Diagnostic. At a minimum the master controller shall diagnose and report local controller flash fault by reporting the conflict monitor/malfunction management unit…

The rest of Section 1074 — CONTROL EQUIPMENT is for members

You're reading the opening of Section 1074 — CONTROL EQUIPMENT. Members see the complete text, every cross-reference and the tools on this page — free for 14 days, no card required.

  • Complete section text with subsections and tables
  • Search across every state DOT standard specification
  • Prior editions and related products
  • Ask Copilot about this section, with citations
Unlock Section 1074 — CONTROL EQUIPMENT — free for 14 daysSign in