018TC - Section 3: Scope of Work

MD · 2025 Standard SpecificationsBook pages 9798View official source ↗

84

TC - SECTION 3: SCOPE OF WORK TERMS AND CONDITIONS TC - SECTION 3: SCOPE OF WORK

TC-3.01GOVERNING ORDER OF CONTRACT DOCUMENTS

The Contract Documents, including but not limited to the Standard Specifications, the Special Provisions Inserts, the Plans, Special Provisions, and all supplementary documents are essential parts of the Contract, and a requirement occurring in one is as binding as though occurring in all. They are intended to be complementary and to describe and provide for a complete work. In the event of any discrepancy between the drawing and figures written thereon, the figures, unless obviously incorrect, will govern over scaled dimensions. In the event of any discrepancy between the various Contract Documents, the governing order from highest to lowest shall be Special Provisions, Plans, Special Provisions Inserts, and Standard Specifications. General Provisions will govern over all Contract Documents unless expressly provided for in the Contract.

TC-3.02CONSTRUCTION DOCUMENTS TO SUCCESSFUL BIDDER

The bidders on each Contract advertised by the Administration are responsible to download the Plans, Invitation for Bids Books, Cross Sections (if provided), and As-Built Plans (if provided) during the bidding process from the websites listed elsewhere in the Invitation for Bids. Upon award and if requested, the Administration will provide the successful bidder electronic copies of Plans, Invitation for Bids Books Cross Sections (if included), and As-Built Plans (if included).

TC-3.03RIGHTS IN THE USE OF MATERIALS FOUND ON THE

PROJECT The Contractor, with the approval of the Engineer may use on the project any excavated stone, gravel, sand, or other material conforming to the requirements of the Contract Documents. When these materials are used for select, capping, modified, or common borrow and conform to the pertinent materials Specifications, payment will only be made at the Contract unit price for the class of excavation from which the materials are obtained. In the event these materials are processed through a crushing, screening, washing, or sorting plant for use as another pay item, the Contractor will be paid both for the excavation of such materials at the Contract unit price and at the Contract unit price for which the material is used. The Contractor shall replace with other acceptable material all of the portion of the excavated material removed and used that was needed for use in the embankments, backfills, approaches, or otherwise, at no additional cost to the Administration. 85

TC - SECTION 3: SCOPE OF WORK If however, these materials are not processed and paid for as described in the preceding paragraph, and their use creates a shortage of embankment, backfill, approaches, or other material, the Contractor shall provide acceptable replacement material for all the material needed for embankments, backfills, approaches, or otherwise. In this case, the replacement material shall be paid for at the unit price for the item the Class 1 Excavation is used for, or the unit price bid for the Class 1 Excavation, whichever is the lower unit price bid. The Contractor shall not excavate nor remove any material that is not within the limits of excavation, as indicated by the slope and grade lines, without written authorization from the Engineer.

TC-3.04SAFETY HAZARDS IN CONFINED SPACES

The Contractor shall be responsible for gas detection in and ventilation of confined spaces. When procedures require workers to enter confined spaces such as steel or concrete box section type superstructures, particularly when the interior is closed off at both ends, the Contractor shall be cognizant of the potential health hazards. The Contractor shall adhere to all applicable MOSH regulations. The Contractor shall have approved detecting devices available and shall conduct tests for oxygen content and presence of gases, such as combustible gas, carbon dioxide, methane, carbon monoxide, and hydrogen sulfide whenever any fabrication, erection, or inspection operations are to be performed within the confined spaces. The Contractor shall apply mechanical ventilation continuously to the confined space during occupancy to maintain the proper oxygen content and shall conduct air tests periodically during the occupancy. 86

TC - SECTION 4: CONTROL OF WORK TERMS AND CONDITIONS TC - SECTION 4: CONTROL OF WORK

TC-4.01WORKING DRAWINGS

(a)General. The Plans shall be supplemented by working drawings as necessary to

adequately control the work. All authorized alterations affecting the requirements and information given on the working drawings shall be in writing to the Engineer. When reference is made to the working drawings, the interpretation shall be the working drawings as affected by all authorized alterations then in effect. Working drawings shall show details of all structures, lines, grades, typical cross section of roadway, general cross sections, location, and designation of all units and elements. The Contractor shall provide, at no additional cost to the Administration, all required working drawings and shall have them adequately checked, after which they shall be submitted to the Engineer for review. The Engineer may reject working drawings and return them for revisions, in which case the Contractor shall submit revised working drawings as required. No items involving the drawings shall be incorporated into the work until the Engineer has accepted the drawings for use; however, acceptance shall not relieve the Contractor of any responsibility in connection with them. All working drawings shall be furnished in duplicate for preliminary examination for projects prepared by the Administration and in triplicate for projects prepared by consultant engineering firms for the Administration. After the Engineer has accepted working drawings for use, the Contractor shall furnish additional copies as requested. All working drawings shall be on sheets measuring 22 in. by 34 in. or 24 in. by 36 in. and shall have a standard title block at the lower right corner approximately 4 in. by 8 in. (2 in. for the revision column on the left side and the remaining 6 in. for the title) indicating the following information in the order named: Name of Contractor (and subcontractor, if applicable) Address of Contractor (and subcontractor, if applicable) Sheet Title (Reinforcement Details, etc.) Name of Structure Crossing For (Maryland Department of Transportation State Highway Administration) By (Indicate name of Contractor's official or engineer, or other parties authorized to sign official documents.)

Source: Maryland Standard Specifications for Construction and Materials, 2025 Edition. Pages 9798 of 1,113.