B
HomeLibrariesCopilotSearchProjectsBookmarks
FeedbackHelp Desk
Libraries
Building Codes
Code LibraryIBC — BuildingIRC — ResidentialIFC — FireIPC — PlumbingIMC — MechanicalIFGC — Fuel GasIECC — EnergyNEC — ElectricalModel Codes
Specifications
CSI SpecificationsDOT SpecsTransit SpecsUSACE
Standards
TransportationRailroadFire SafetyAccessibilityStructural
Tools & References
DiagramsAssembliesProductsCalculatorsChecklistsPermits
PricingLog in
General

060106 — Asphalt Mixes for Maintenance of Traffic

MD · 2025 Standard SpecificationsBook pages 243243View official source ↗

for Pipe Culvert or Utility item. 2025 STANDARD SPECIFICATIONS FOR CONSTRUCTION AND MATERIALS CATEGORY 100 PRELIMINARY SECTION 106 — ASPHALT MIXES FOR MAINTENANCE OF TRAFFIC

106.01 Description

Place asphalt mix for maintenance of traffic.

106.02 Materials

Tack Coat (Rapid Setting) 904.03 Asphalt mix 904.04 Crack Filler 911.01 & 911.01.01 Production Plant Section 915

106.03 Construction

Refer to 504.03.

106.04 Measurement and Payment

Asphalt Mixes for Maintenance of Traffic will be measured and paid for at the Contract unit price per ton. The payment will be full compensation for all tack coat, crack filler, hauling, placing, compacting, maintaining, removal, rehandling, reworking, disposal, and for all material, labor, equipment, tools, and incidentals necessary to complete the work. When an asphalt mix is part of any base or pavement course used for the construction and maintenance of temporary detours, approaches, crossings, and widenings, the item of work will be measured and paid for as specified in Section 504. For payment of temporary tie-ins, refer to 504.04. Removal will be measured and paid for as specified in 206.04.02. Asphalt mixes for maintenance of traffic when used for temporary and permanent patching at pipe culverts and utilities will not be measured but the cost will be incidental to the Contract unit price 107 — CONSTRUCTION STAKEOUT 2025 STANDARD SPECIFICATIONS FOR CONSTRUCTION AND MATERIALS CATEGORY 100 PRELIMINARY SECTION 107 — CONSTRUCTION STAKEOUT

107.01 Description

Furnish, place, and maintain construction layout stakes that demarcate the Limit of Disturbance (LOD) and protected resource areas including but not limited to, wetlands, wetland buffers, waters of the United States (WUS), stream protection zones (SPZs), floodplains, and tree preservation areas.

107.01.01 Limit of Disturbance (LOD). The allowable limit of earth disturbance as specified in

the Contract Documents.

107.02 Materials

107.02.01 Wetland Ribbon. Pink vinyl ribbon having a width no less than 1-1/2 in. and having

the word “Wetland” in black letters. 107.02.02 Demarcation Ribbon. Vinyl ribbon of various colors having a width no less than 1-1/2 in.

107.03 Construction

107.03.01 Line and Grade. The Engineer will provide the following.

a.Roadway Temporary Access Road, and Maintenance Access Road Stakeout.
1.A staked center line of the roadway with stations not over 100 ft apart.
2.Appropriately spaced benchmarks and necessary references, including all points of curvature (PC) and points of tangency (PT), for the preservation and control of the center line.
3.Except for temporary access roads and maintenance access roads, two sets of prints of the cross sections. Use the cross sections as a guide only. Dimensions or elevations scaled from the cross sections are not sufficiently precise for use in construction. Cross sections will not be provided for temporary access roads nor for maintenance access roads.