CATEGORY 300 DRAINAGE SECTION 316 — STORMWATER MANAGEMENT (SWM) FILTRATION FACILITIES
316.01 Description
Construct stormwater management (SWM) filtration facilities as specified. SWM Filtration Facilities Identification. SWM filtration facilities are identified by unique six- digit inventory numbers and include the following designations.
316.02 Materials
No. 57 Aggregate 901.01 No. 7 Aggregate 901.01 No. 2 Aggregate M 43, No. 2 Portland Cement Concrete 902.10, Mix No. 2 Topsoil 920.01.01 and 920.01.02 Bioretention Soil Mix (BSM) 920.01.05 Coarse Sand 920.01.05(a)(1) 2025 STANDARD SPECIFICATIONS FOR CONSTRUCTION AND MATERIALS Fertilizer 920.03.01 Shredded Hardwood Bark (SHB) Mulch 920.04.03 Soil Stabilization Matting (SSM) 920.05 Seed and Turfgrass Sod 920.06 Plant Materials 920.07 Water 920.09.01 Geotextile Section 919, Class PE, Type III Securing Pins or Staples Section 919 Aggregate. Ensure aggregate has been adequately washed and is free of soil and fines.
316.02.01 Subdrain Pipe, Fittings, and Geotextile Sock. Subdrain pipe shall include slotted
perforated and solid-wall (non-perforated) pipe. Perforated subdrain pipe shall have only two rows of perforations. Use fittings matching the same material as the subdrain pipe and is otherwise compatible with the subdrain pipe. Use subdrain pipe, fittings, and geotextile sock for subdrain, cleanouts, and observation wells.
316.02 01(a) for the perforated portion of observation wells and 316.02.01(b) for the solid-wall portion of observation wells. Use the geotextile sock recommended and supplied by the subdrain pipe manufacturer and use only to cover the perforated pipe portion of observation wells.
2025 STANDARD SPECIFICATIONS FOR CONSTRUCTION AND MATERIALS
316.03 Construction
316.03.01 Site Protection. Prior to constructing SWM filtration facilities, ensure that the SWM
facility site areas are protected from vehicular traffic and are not used for erosion and sediment controls, stockpiles or equipment storage.
316.03.02 Site Preparation. Unless facilities are off-line and will receive no runoff, construct
facilities only after all surrounding and adjacent areas are permanently stabilized. Divert flow from entering the SWM filtration facility areas unless same-day stabilization is specified for the SWM filtration facility location. Prevent trash, debris and sediment from entering SWM filtration facilities during construction.
316.03.03 Schedule. Perform SWM filtration facility activities during dry weather and when soil
moisture conditions are suitable and unless the facility is off-line or flow diversions are in place. Only work with soil that is friable and not in a muddy or frozen condition. Cease operations when soil and overall conditions are otherwise unsuitable.
316.03.04 Excavation. Use methods of excavation that minimize compaction of the underlying
soils. Where feasible, operate equipment from locations adjacent to SWM filtration facilities rather than within the facility area. Use only wide-track or marsh-track equipment, or light equipment with turf-type tires to excavate, grade, and place materials. Do not use equipment with narrow tracks or narrow tires, rubber tires with large lugs, or high-pressure tires.
316.03.05 Excavation Area Bottom Preparation. Only work with soil that is friable and not in
a muddy or frozen condition. When present, remove any standing water from the excavation area. Prepare the bottom of the excavated area as follows.
316.03.06 Geotextile. Place tightly against the vertical sides of the excavation area, pulling tight
to eliminate wrinkles and folds and pin securely. Eliminate any voids between the geotextile and the underlying soil and avoid wrinkling and folding the geotextile. Maintain a minimum 12 in. overlap at the geotextile joint ends or breaks. Pin longitudinal joints, overlaps and edges securely with pins spaced no greater than 10 ft on center. Do not place geotextile on the bottom of the excavated area.
316.03.07 Miscellaneous Structures. Furnish and install as specified in Section 305.
316.03.08 Aggregate. Place aggregate in layers as specified. Prevent soil, fines, and other debris
from contaminating the aggregate. Remove contaminated aggregate and replace with clean aggregate. 2025 STANDARD SPECIFICATIONS FOR CONSTRUCTION AND MATERIALS
316.03.09 Subdrain Pipe. Cap the ends of all subdrain pipe not terminating in a cleanout, vent,
or drainage structure unless otherwise specified. Ensure perforations are placed on the bottom of the horizontal subdrain pipe runs.
316.03.10 Coarse Sand. Place coarse sand in horizontal layers not exceeding 12 in. After each
lift, spread the coarse sand to provide a uniform surface then spray or sprinkle water to saturate the lift until water flows from the subdrain outlet. Use an appropriate sediment control device to capture any discharged sediment-laden water from the subdrain outlet. Place, spread, and water coarse sand to uniform surface true to depth, line, cross section, and elevation to ensure the completed work is as specified after settlement. Prevent soil, fines, and other debris from contaminating the coarse sand. Remove contaminated coarse sand and replace with clean coarse sand.
316.03.11 Bioretention Soil Mix (BSM). Place BSM in horizontal layers not exceeding 12 in.
After each lift, spread the BSM to provide a uniform surface and spray or sprinkle water to saturate the entire area of BSM until water flows from the subdrain outlet. Use an approved sediment control device to capture any discharge sediment-laden water. Place, spread, and water BSM to uniform surface true to depth, line, cross section, and elevation to ensure the completed work is as specified after settlement. Prevent soil, fines, and other debris from contaminating the BSM. Remove contaminated BSM and replace with uncontaminated BSM.
316.03.12 Topsoil. Place topsoil as specified. Do not blend topsoil into BSM when topsoil is
placed on top of BSM. 316.03.13 Check Dams.
316.03.14 Soil Stabilization Matting (SSM). As specified in Section 709.
316.03.15 Vegetation Installation and Establishment. Unless facilities are off-line or flow
diversions are in place, install seed, sod, trees, shrubs, perennials, and annuals within SWM filtration facility areas immediately after final grading. In the event that vegetation cannot be installed and established due to time-of-year or weather restrictions, keep diversion controls in place until such time that permanent vegetation may be established. Do not use machinery other than hand held within the BSM footprint.
316.03.16 Soil Amendments and Fertilizer. Apply as specified in Sections 705, 706, 707, 708,
710, or as specified. Use the following for plant materials installed in BSM.
316.03.17 Shredded Hardwood Bark (SHB) Mulch. As specified in 710.03.13.
316.03.18 Inspection and SWM Facility As-Built Certification. Inspect and document each
step of construction of SWM filtration facilities and complete the applicable checklists and furnish the SWM facility as-built certification according to the Contract Documents and Section 317.
316.04 Measurement and Payment
Payment will be full compensation for all control of discharge from subdrain pipe, geotextile, watering, sheeting, shoring, dewatering, hauling, storing, re-handling of material, removal and disposal of excess and unsuitable material, tilling, grading and slope adjustments, and for all material, labor, equipment, tools, and incidentals necessary to complete the work. Excavation. Excavation will be measured and paid for as specified in Section 201. Miscellaneous Structures. Miscellaneous Structures will be measured and paid for per cubic yard of the specified mix concrete. Aggregate. Aggregate will be measured and paid for at the Contract unit price for one or more of the following.
317.01 Description
Submit a certification package that affirms that stormwater management (SWM) facilities and practices are constructed as specified or are functionally equivalent to the designs in the approved SWM Report, revising the certification package as needed until final acceptance.
317.01.01 SWM As-Built Engineer. The SWM As-Built Engineer (ABE) is responsible for
assembling and certifying the SWM certification package. Duties include adequately documenting that the SWM facilities have been constructed as specified, and performing inspections during pertinent construction activities for SWM facilities and practices. The ABE shall be a Professional Engineer (P.E.) registered and licensed in the State of Maryland and who has at least three years of experience in SWM facility design and SWM facility construction. Submit one copy of the ABE’s resume to the Engineer. The resume shall include the following.