CATEGORY 400 STRUCTURES SECTION 430 — METAL STRUCTURES
430.01 Description
Furnish, fabricate, transport, and erect steel beams, plate girders, trusses, grillages, columns and bents, shoes, pedestals, castings, beam retrofit plates and angles, miscellaneous steel, and all incidental structural steel as specified in the Contract Documents or as directed by the Engineer. Refer to Section 432 for bearings and Section 435 and Section 436 for cleaning and painting new and existing structural steel, respectively. Substitutes for Rolled Members. Fabricated shapes may be substituted for the specified rolled shape, provided the substitution is at no additional cost to the Administration and the fabricated shape meets the following requirements:
430.02 Materials
Paint Section 435, Section 436, and 912.05 Grout 902.11(c), 902.11(d), 902.11(e) Metals Section 909 Metal Reinforced Epoxy Filler 909.12 Bolts F3125 Grade A325, A490 Nuts A563 Grade C, D, and DH Washers F436 2025 STANDARD SPECIFICATIONS FOR CONSTRUCTION AND MATERIALS Direct Tension Indicating Washers (DTI) F959
430.03 Construction
Unless otherwise specified, all welding and dimensional tolerances shall meet AWS D1.5. 430.03.01 Working Drawings. Refer to Section 499. If lateral bracing is required for shipping or erection, specify the details on the working drawings. 430.03.02 Work Scheduling. Refer to Section 499. At least two weeks prior to beginning shop work, notify the Engineer when and where to allow for inspection. Do not fabricate any materials unless otherwise directed. Provide weekly work schedules prior to and during fabrication as directed.
430.03.03 Facilities for Shop Inspection. Furnish all facilities for the inspection of material and
workmanship in the shop. Allow the inspector free access to the required areas of the premises and provide an approved office area.
430.03.04 Material Identification. Identify main member material by heat number.
430.03.05 Mill Orders. Furnish copies of mill orders and test reports.
430.03.06 Testing. Furnish sample specimens as directed without charge.
430.03.07 Defective Material and Workmanship. The acceptance of any material and
workmanship will not deter subsequent rejection. Replace or repair rejected material and workmanship as directed.
430.03.08 Marking and Shipping. Paint or mark each member with an erection mark for
identification. Furnish an erection diagram with erection marks clearly delineating the orientation of diaphragms. Erection marks for field identification of members and weight marks for members weighing over 6000 lb shall be painted on surface areas previously painted with the shop coat. Material may be loaded for shipment when the shop coat is thoroughly dry, but not less than 24 hours after the paint has been applied. Where unpainted steel is specified for a finished structure, do not place any company’s name on the structural steel. Erection marks and inspection stamps shall appear only on the top surface of the top flange of girders, beams, and diaphragms unless otherwise directed. Do not apply paint after the materials have been loaded for transport. Furnish copies of material orders, shipping statements, and erection diagrams. Show the weight of the individual members on the shipping statements. 2025 STANDARD SPECIFICATIONS FOR CONSTRUCTION AND MATERIALS Load, transport, unload, and store structural material so that the metal is kept clean and does not become excessively stressed, deformed, or otherwise damaged. When handling long steel members, place handling devices at approximately the quarter points. When storing and shipping members, place blocking at intervals that prevent sag and distortion. Keep beams and girders in an upright position during shipping, storage, and handling. For other members, keep the stronger axis vertical. All girders having stiffeners the full height of the web on both sides of the web shall be adequately blocked before shipment. Locate this blocking at the quarter points and midpoint of the girder and at additional locations to ensure that the blocking interval does not exceed 25 ft. For members too long to fit inside a truck or trailer, limit the cantilever to one quarter of the length of the member. Support members too long to comply with this requirement on dollies, additional vehicles, or other vehicles that fully support the long pieces as approved.
430.03.09 Storage of Material. Store fabricated material off the ground and protected from rust
producing conditions. Keep materials free of dirt accumulation, oil, or other deleterious matter. 430.03.10 Changes and Substitutions. Do not make changes or substitutions in any approved drawing unless approved in writing by the Director, Office of Structures. 430.03.11 Fabrication. Use bolted or welded fabrication and construction as specified or as directed. When girders are to be curved by the heat shrinkage method, submit the proposed method. 430.03.12 Holes.
430.03.13 Shop Assembly. Clean surfaces of metal that will be in contact after assembly. Ensure
that parts of a member are assembled, well pinned, and firmly drawn together with bolts before starting reaming or tightening of fasteners. Provide members free from twists, bends and other deformations. Ream material that has been punched full size, if necessary, prior to tightening of fasteners. Refer to 430.03.12(c). Secure parts not completely fastened in the shop with bolts to prevent damage in shipment and handling. Members assembled in the shop for reaming of field connections shall remain assembled until the Engineer’s shop inspection. When using Computer Numerically Controlled (CNC) Drilling, furnish a check assembly for each major structural type of each project unless otherwise indicated or specified in the special provisions. Provide check assemblies consisting of at least three contiguous shop sections or, for a truss, all members in at least three contiguous panels but not less than the number of panels associated with three contiguous chord lengths (i.e. length between field splices). Base check assemblies on the proposed order of erection, joints in bearings, special complex points and similar considerations. Special complex points include the portals of skewed trusses. Use the first sections of each major structural type to be fabricated as the check assemblies. 2025 STANDARD SPECIFICATIONS FOR CONSTRUCTION AND MATERIALS Obtain approval for each CNC drilled check assembly before reaming or dismantling the assembly. If a check assembly fails to demonstrate that the required accuracy is being obtained for camber, alignment, accuracy of holes and fit of milled joints, the Administration or our shop inspector may require additional check assemblies. Additional check assemblies will be at no additional cost to the Administration.
430.03.14 Camber Diagram. Furnish a camber diagram showing the camber at each panel point
for each truss, taken from actual measurements during truss assembly. For all beams and girders, furnish a camber diagram showing the camber at all splice points, points of dead load inflection, and any other points designated by the Engineer. Camber stringers to the specified dimensions, when measured after completion of all shop welding. The maximum tolerance for camber is zero under to 3/4 in. over. Make provisions for dead load deflections, fabricating tolerances, and irregularities at all points along all stringers so that the superstructure concrete may be placed to match the profile grade line.
430.03.15 Match Marking. Match mark connecting parts assembled in the shop for the purpose
of reaming holes in field connections. Furnish a diagram showing these marks. 430.03.16 Use of High Strength Bolts and Lock-Pin and Collar Fasteners. Use high strength bolts and lock-pin and collar fasteners unless otherwise specified. Unfinished bolts or machine bolts may be used for the temporary erection of structural steel. Replace them with high strength bolts, lock-pin and collar fasteners, or welding for final erection. Use turned bolts only when specified. Draw the heads, nuts, and washers tightly against the work. Where bolts or lock-pin and collar fasteners are used in beveled surfaces, provide beveled washers to give full bearing to the head, nut, or collar except as otherwise specified in 430.03.17. Where high strength bolt assemblies are used for joint connections, perform the additional testing specified by the Office of Materials Technology.
430.03.17 High Strength Bolt Joint Requirements.
430.03.18 Lock-Pin and Collar Fastener Requirements.
430.03.19 Welding. Provide welding of structures and welding qualifications according to
American Welding Society (AWS) Bridge Welding Code D1.5 (AWS D1.5) unless otherwise directed. These provisions apply to both shop and field welding. Ensure that all welders, welding machine operators, and tackers employed to work on Administration projects are qualified as follows:
430.03.21 Planing. Plane the top and bottom surfaces of steel slabs, base plates, and cap plates
of columns and pedestals; or have the plates or slabs heat straightened. Ensure that parts of members in contact with them are faced. In planing the flat surfaces of expansion bearings, the cut of the tool shall be in the direction of expansion. 2025 STANDARD SPECIFICATIONS FOR CONSTRUCTION AND MATERIALS
430.03.22 Abutting Joints. Ensure that abutting joints in compression members and in tension
members where specified, are faced and brought to an even bearing. Where joints are not faced, limit the opening to no more than 1/8 in.
430.03.23 End Connection Angles. Floor beams, stringers, and girders having end connection
angles shall be built to the exact length back-to-back of connection angles. If end connections are faced, ensure that the finished thickness of the angles is not less than specified.
430.03.24 Main Members. Fabricate principal portions of main members carrying primary stress
(refer to 909.01) so that the direction of stress and rolling are the same. 430.03.25 Web Plates. At web splices, ensure that the clearance between the ends of the web plates is not more than 3/8 in. Ensure that the clearance at the top and bottom ends of the web splice plates is not more than 1/4 in.
430.03.26 Bent Plates. Take unwelded, cold bent, load carrying, rolled steel plates from the stock
plates so that the bend line will be at right angles to the direction of rolling, except that cold bent ribs for orthotropic deck bridges may be bent in the direction of rolling if approved and shall meet the following: MINIMUM COLD-BENDING RADII A 709 Grades Thickness, in. (t) Up to 3/4 Over 3/4 to 1, incl. Over 1 to 2, incl. Over 2 36 1.5t 1.5t 1.5t 2.0t 50 1.5t 1.5t 2.0t 2.5 50W 1.5t 1.5t 2.0t 2.5 HPS70W 1.5t 1.5t 2.5 3.0t 100 1.75t 2.25 4.5t 5.5t 100W 1.75t 2.25 4.5t 5.5t
430.03.27 Erection Plan. Submit an erection plan for approval outlining erection procedure of
the main members. Submit the erection plan as specified in Section 499 and to the Director, Office of Structures, at least 30 days prior to beginning erection. Include the numbers and types of 2025 STANDARD SPECIFICATIONS FOR CONSTRUCTION AND MATERIALS equipment to be used including crane capacity, location of crane for lifting, falsework when required, and main member erection sequence and weight. Ensure that all wheels and outriggers of a crane or wheels of a structural steel delivery truck are at a minimum distance from the rear face of an abutment equal to the vertical distance from the top of a spread footing or to the original groundline if the footing is on piles. Ensure that no other heavy construction equipment operates within this distance from the rear face of abutments. Erect bridges with continuous main members in a manner providing the proper reactions, and avoiding overstressing main members. When preparing erection plans and procedures, take into account the restrictions imposed by the Water Resources Administration relative to pollution or disturbance of existing waterways.
430.03.28 Falsework. Comply with the provisions specified in TC-4.01 and Section 499. Build
and maintain the falsework according to the approved falsework plans. Any changes subsequent to initial approval shall be proposed through the Contractor’s professional engineer and be as approved. Before permitting any loads to be placed on falsework, the Engineer shall receive written certification by the Contractor’s professional engineer that the falsework system has been assembled in conformance with the approved falsework drawings. This certification shall be accompanied by a Certificate of Compliance stating that all manufactured materials and assemblies fully comply with the falsework design and plans. The Engineer may either accept the certificate or invoke any provision of GP-5.08. Perform all tests required at no additional cost to the Administration. In addition to protective measures shown on the falsework plans, the Engineer may direct that further protection of falsework be provided against accidental collision by highway or construction traffic and equipment, traffic vibration, flood waters or high winds, etc., that are necessary for public safety and protection of the work.
430.03.29 Damaged or Defective Material. Submit a written procedure for correcting damaged
or defective material to the Director, Office of Structures. Do not proceed with corrections until approved. The Engineer will inspect damaged or defective material before and after correction. Make corrections in the presence of the Engineer.
430.03.30 Assembling Steel. Carefully handle material without bending, breaking, or otherwise
damaging parts. Before assembly, clean the bearing surfaces and those to be in permanent contact. Before beginning field bolting and welding, adjust the structure to correct grade and alignment, and properly regulate the elevations of panel points (ends of floor beams). Fill half the holes in splices and field connections using bolts and cylindrical erection pins (40 percent bolts and 10 percent pins) before torquing high strength bolts. If the member will carry traffic during erection, fill three fourths of the holes before torquing. Cylindrical erection pins shall be 1/32 in. larger than the diameter of the fasteners. 2025 STANDARD SPECIFICATIONS FOR CONSTRUCTION AND MATERIALS 2025 STANDARD SPECIFICATIONS FOR CONSTRUCTION AND MATERIALS
430.03.31 Anchor Bolts. As specified in 909.06. Do not cast anchor bolts in the concrete. Create
a template to locate the anchor bolt holes and use it to shift the reinforcement prior to placing the concrete to eliminate conflicts between the reinforcement and the anchor bolt holes. Set anchor bolts in round holes drilled or cast in the concrete. Accurately position bolts by using templates set to correct location and alignment to ensure proper span lengths, and carefully set tops of bolts to proper elevation. Unless otherwise noted, install bolts plumb or normal to the finished bearing surface of the masonry. Bolts shall have the portion below the bridge seat swedged. Drill or cast holes to a diameter at least 1 in. larger than the bolt diameter. Do not paint anchor bolts, nuts, and washers. After anchor bolts are finally and correctly positioned, completely fill the holes with grout; however, do not grout until all structural steel is set in its final position. After the masonry plates or shoes are set, use the same grout to fill the space between the bolts and the round holes of fixed plates and shoes. Do not fill slotted holes in expansion devices unless specified. Maintain an air temperature of at least 40 F around the mortar surface for a period of three days unless otherwise recommended by the manufacturer. When mortar filling is used, first check the depth of the hole by inserting and withdrawing the bolt. Then partially fill the hole with mortar, and immediately insert the bolt by forcing with uniform pressure or light blows from a hammer (flogging and running is prohibited) so that excess mortar is pushed out at the top of the hole. Remove excess mortar. Set the bolt to project approximately 1/2 in. above the nut and ensure that it is threaded to approximately 1/2 in. below the nut in their final position. Set rockers or expansion plates with slotted holes with the proper tilt or offset as determined by the temperature prevailing at the time and so that they will be in their midway position at 68 F or as specified.
430.03.32 Maintenance of Concrete. Keep all exposed concrete surfaces free from stains and
discoloration. Prevent staining of the finished concrete surfaces where unpainted structural steel is specified. Remove any stains and restore the concrete to its original color.
430.03.33 Safety Hazards. Perform gas detection in and ventilation of confined spaces as
specified in TC-3.04. 430.03.34 Beam Retrofit Operations. As a first order of work, take measurements of the existing retrofit locations. Alert the Engineer of any major differences between the existing conditions and Contract Plans. There will be no payment of retrofit elements that do not fit snug against the existing steel. Provide shop drawings of all elements as specified in 430.03.01. Clean all new steel used for steel beam retrofits as specified in 436.03.10(h). Retrofits which are shop fabricated shall be coated with Paint System B as specified in Section 435. Retrofits which are field fabricated shall be coated with Paint System C as specified in Section 436. If needed, refer to Section 480 for jacking beam operations. If there are no other cleaning and painting operations specified in the Contract Documents other than that which is needed to complete the retrofit repairs, the Contractor need not be SSPC-QP1 or SSPC-QP2, Category A certified to perform the field cleaning and painting in the steel repair areas. If the Contract Documents state that the connection is slip critical, perform the cleaning of the existing steel repair area as specified in 436.03.10(f) or 436.03.10(h) or a combination thereof. Perform cleaning of all other existing steel repair areas as specified in 436.03.10(d) or 436.03.10(e) or a combination thereof. In areas where bolted connections are used, apply metal reinforced epoxy filler to areas of section loss and pitting prior to installing the new steel plates. Apply the metal reinforced epoxy filler in accordance with the manufacturer’s recommendations and ensure that it remains workable immediately prior to placing the new steel plate. Apply a sufficient quantity of the filler so that excess material will be squeezed out during the installation of the bolts. Properly dress excess material in a workmanlike manner prior to hardening. Unless otherwise specified, complete the last two System B or C coats of paint in the field. Perform all field painting as specified in Section 436.
430.04 Measurement and Payment
The payment will be full compensation for all high strength bolt and lock-pin and collar fastener assembly testing and for all material, labor, equipment, tools, and incidentals necessary to complete the work.
430.04.01 Fabricated Structural Steel will not be measured but will be paid for at the Contract
lump sum price. 430.04.02 Fabricated Structural Steel will be measured and paid for at the Contract unit price per pound computed on the theoretical weight. Where measurement and payment of Fabricated Structural Steel is based on weight, the weight will be computed on the basis of the net finished dimensions of the parts as shown on the approved working drawings, deducting for copes, cuts, clips, and all open holes. Computations will be made on the basis of the following: MATERIAL POUNDS PER CUBIC FOOT Aluminum, cast or wrought 173.0 Bronze, cast 536.0 Copper alloy 536.0 2025 STANDARD SPECIFICATIONS FOR CONSTRUCTION AND MATERIALS Copper, sheet 558.0 Iron, cast 445.0 Iron, malleable 470.0 Lead, sheet 707.0 Steel, rolled, cast, copper bearing, silicone, nickel and stainless 490.0 Zinc 450.0 The weight of rolled shapes will be computed on the basis of their nominal weight per foot as specified in the Contract Documents or listed in handbooks. The weight of rolled shapes will be computed on the basis of their nominal weight for their width and thickness as specified, plus an estimated overrun computed as half the permissible variation in thickness and weight as tabulated in A 6. The weight of all shop weld metal (not included in weighed unit) and field weld metal will be computed on the basis of the theoretical volume from dimensions of the welds. The weight of temporary erection bolts, shop and field paint, boxes, crates and other containers used for shipping, and materials used for supporting members during transportation and erection is excluded from the calculation of weight for payment. Structural members or materials which fail to conform to requirements of tests and all materials rejected as a result of these tests will not be measured or paid for under any method of payment.
430.04.03 When a pay item for Fabricated Structural Steel is not specified, the fabricated
structural steel will not be measured but the cost will be incidental to other pertinent items. 430.04.04 Rotational capacity testing for high strength bolt assemblies will not be measured but the cost will be incidental to the Contract price for the Fabricated Structural Steel item or other pertinent items specified.
430.04.05 The retrofit repairs for the lengths specified in the Plans will be measured and paid for
at the Contract unit price per each for the pertinent Structural Steel Beam Retrofit item. The payment will also be full compensation for the cleaning, painting, and application of metal reinforced epoxy filler. 2025 STANDARD SPECIFICATIONS FOR CONSTRUCTION AND MATERIALS 431 — STEEL STUD SHEAR DEVELOPERS CATEGORY 400 STRUCTURES SECTION 431 — STEEL STUD SHEAR DEVELOPERS
431.01 Description
Furnish, fabricate, and install steel stud shear developers.
431.02 Materials
Steel Stud Shear Developers 909.05
431.03 Construction
Erect all structural steel and install all applicable forming and decking in a particular span before attaching shear developers to the structural steel. Install shear developers according to AASHTO/ AWS Bridge Welding Code D1.5. All studs will be inspected according to AWS D1.5 immediately after welding is completed. Correct defects as directed.
431.04 Measurement and Payment
The payment will be full compensation for all material, labor, equipment, tools, and incidentals necessary to complete the work.
431.04.01 Steel Stud Shear Developers will not be measured but will be paid for at the Contract
lump sum price. 431.04.02 Steel stud shear developers for which there is no specific pay item included in the Contract Documents will not be measured but the cost will be incidental to other pertinent items specified.
431.04.03 Steel Stud Shear Developers will be measured and paid for at the Contract unit price
per each. 2025 STANDARD SPECIFICATIONS FOR CONSTRUCTION AND MATERIALS