2025 STANDARD SPECIFICATIONS FOR CONSTRUCTION AND MATERIALS CATEGORY 100 PRELIMINARY SECTION 107 — CONSTRUCTION STAKEOUT
107.01 Description
Furnish, place, and maintain construction layout stakes that demarcate the Limit of Disturbance (LOD) and protected resource areas including but not limited to, wetlands, wetland buffers, waters of the United States (WUS), stream protection zones (SPZs), floodplains, and tree preservation areas.
107.01.01 Limit of Disturbance (LOD). The allowable limit of earth disturbance as specified in
the Contract Documents.
107.02 Materials
107.02.01 Wetland Ribbon. Pink vinyl ribbon having a width no less than 1-1/2 in. and having
the word “Wetland” in black letters. 107.02.02 Demarcation Ribbon. Vinyl ribbon of various colors having a width no less than 1-1/2 in.
107.03 Construction
107.03.01 Line and Grade. The Engineer will provide the following.
107.03.02 Workmanship. Set and maintain the specified elevations and dimensions.
107.03.03 Control Markers. Preserve the center line and benchmarks set by the Engineer.
Replace disturbed, damaged, or destroyed control markers. 107.03.04 Control Stakes. As specified in 107.03.01(a), furnish, set, and preserve stakes at each station along each side of the project on the right-of-way or easement line, whichever is farther from the center line of construction. Where only part of an ultimate dual highway is to be constructed, set the stakes on the side of the future improvement 10 ft beyond the construction limits. On each of the stakes, mark the offset distance from the center line and its top elevation, or the cut or fill to the profile grade line. Place additional stakes as necessary and as directed to ensure the correct layout of the work. For stormwater management (SWM) facilities, furnish, set, and preserve stakes at each station along each side of the maintenance access road and at grading points. Place additional stakes as necessary and as directed to ensure the specified layout of the work.
107.03.05 Layout. For structures, proceed with the layout work as specified in 107.03.01(b).
Before any actual construction begins, verify the lines and grades provided by the Engineer, then establish all center line or working line intersections with the center line or center of bearing of all piers, bents, and abutments. From these field layouts, check the proposed span lengths by either electronic distance measurement or chaining from the field layouts. When chaining, compensate for temperature, sag, and horizontal alignment. Verify the location of the structure to affirm its correct location with relation to existing structures, roads, and existing conditions that are to remain. If discrepancies are found, immediately notify the Engineer in writing. Ensure all lines established on the ground are preserved or referenced, marked, and available at all times. Ensure field elevations of all bridge seats are correct and that are finished to proper grade. When steel beams or girders are incorporated in the project, determine the deflection of each member by running elevations over the tops of the beams or girders after they are in place and before attaching any forms. Apply this information to the deflection diagram to determine the corrected elevation of bottom slab forms and screed supports. The Engineer will check the assembled information. For SWM facilities, proceed with the layout work as specified. Verify the locations of drainage structures to affirm the correct location with relation to the SWM facility layout, grading points, maintenance access road, roads, and existing conditions that are to remain. If discrepancies are found, immediately notify the Engineer in writing. Ensure that all lines established on the ground are preserved of referenced, marked, and kept available for the duration of the Contract. Ensure that the field elevations are correct and are finished to the proper grade.
107.03.06 Utilities. Upon request, furnish references to control points, alignment, and grade data
to the utility companies or agencies working within the limits of the project so that they may properly locate and coordinate their work and improvements. Intersection Utility Stakeout. Notify the appropriate agencies at least 72 hours (excluding weekends and holidays) prior to the anticipated time for beginning underground work.
107.03.07 Right-of-Way and Easement Lines. Upon request, define the right-of-way and
easement lines for adjacent property owners. 107.03.08 Subgrade, Subbase, and Base Controls. When placing subgrade, subbase, and base courses, furnish a string line and grade with fixed controls having longitudinal and transverse spacing of no more than 25 ft. Along each form line for cement concrete pavement, provide the line and grade with fixed controls not to exceed 25 ft.
107.03.09 Demarcation. Demarcate as specified and as directed and preserve until no longer
applicable. When necessary and as directed, replace disturbed, damaged, destroyed, or otherwise missing demarcation. If demarcation is not re-established within 48 hours, the Engineer may proceed to demarcate. Demarcate wetland areas using 107.02.01. Demarcate LOD and other areas as specified using 107.02.02 and label as directed. Remove all demarcations when they are no longer needed. 2025 STANDARD SPECIFICATIONS FOR CONSTRUCTION AND MATERIALS Establish tree preservation areas as specified in Section 120.
107.03.10 Traffic Control Devices, Lighting and ITS Devices. For installation of Traffic
Control Devices, Lighting and ITS Devices, arrange a meeting with the Engineer and representatives from the Traffic Operations Division to stakeout all items indicated on the sketches, plans, and in the Special Provisions. This meeting shall occur prior to any Traffic Control Device, Lighting or ITS work.
107.04 Measurement and Payment
Construction Stakeout will not be measured but will be paid for at the Contract lump sum price. The payment will be full compensation for all material, labor, equipment, tools, and incidentals necessary to complete the work. Payment of the Contract lump sum price will be prorated and paid in equal amounts on each monthly estimate. The number of months used for prorating will be the number estimated to complete the work. Replacement of control markers with undamaged control markers and replacement of missing or damaged demarcations with undamaged demarcations will be at no additional cost to the Administration. Demarcation replaced by the Engineer will be deducted from monies due under the Contract. Corrections to deficiencies in primary control points for subgrade, subbase, and base controls resulting from construction activities will be at no additional cost to the Administration. Corrections to grade busts and all associated quantity adjustments or errors resulting from construction activities will be at no additional cost to the Administration. 2025 STANDARD SPECIFICATIONS FOR CONSTRUCTION AND MATERIALS 108 — MOBILIZATION AND DEMOBILIZATION 2025 STANDARD SPECIFICATIONS FOR CONSTRUCTION AND MATERIALS CATEGORY 100 PRELIMINARY SECTION 108 — MOBILIZATION AND DEMOBILIZATION
108.01 Description
Construction preparatory and closing (clean-up) operations that include the movement of personnel, supplies, materials, tools, equipment, and incidentals to, within, and away from the project site collectively for the project and for individual work operations; and the establishment and removal/decommissioning of the Contractor’s offices, buildings, and other facilities necessary to commence, continue, and conclude the work. Perform final clean-up as specified in GP-4.09.
108.02 Materials
Not applicable.
108.03 Construction
Not applicable.
108.04 Measurement and Payment
Mobilization and Demobilization will not be measured but will be paid for at the Contract lump sum price. The cost of all required insurance and bonds will be incidental to this item. Payment of the Mobilization and Demobilization item will be made according to the following payment schedule.