CATEGORY 500 PAVING SECTION 520 — PLAIN AND REINFORCED PORTLAND CEMENT CONCRETE PAVEMENTS
520.01 Description
Construct plain and reinforced Portland cement concrete pavements.
520.02 Materials
Portland Cement Concrete and Related Products Section 902 Reinforcing Steel Section 908 Joints Section 911 Portland Cement Concrete Plant 915.03 Fusion Bonded Epoxy Powder Coatings for Steel 917.02 Reinforcement, including load transfer assemblies, tie bars, deformed steel bars, and longitudinal tie devices shall meet Section 908 and be epoxy coated.
520.03 Construction
Within 30 days prior to the start of paving operations, submit a proposed paving plan for approval. Include the production plants, location of the plants with respect to project site, equipment, proposed material sources, and indicate whether the fixed form method or slip form method is proposed. Protect the pavement against damage from all causes. Repair or replace damaged pavement. Mix, place, and finish concrete when natural light is sufficient, or with an approved artificial lighting system.
520.03.01 Equipment. All equipment, including the production plant and paving equipment, is
subject to approval. The plant, including central mixers, batching plant, truck mixers, and hauling equipment shall meet Section 915. Have the plant ready for inspection at least 48 hours prior to the start of construction operations. Have the paving equipment on the job site and ready for inspection at least 24 hours prior to the start of construction operations. Slip form pavers shall be self-propelled on crawler tracks. No other tractive force shall be applied. The paver shall be capable of being automatically controlled for both alignment and grade. 2025 STANDARD SPECIFICATIONS FOR CONSTRUCTION AND MATERIALS The equipment and methods used shall provide a means to obtain the prescribed weights within the allowable tolerances, to obtain the consistency specified with a minimum amount of water, to achieve proper placement of the mixture in a condition of maximum density with no segregation, and to finish and cure the pavement as specified herein.
520.03.02 Weather Restrictions.
520.03.03 Foundation. Construct the foundation as specified. Construct the total width of the
foundation to the width of the pavement plus at least 4 in. outside the base of the fixed form or the outermost edge of the slip form paver track or wheel. No additional payment will be made for the extended width. Ensure that the foundation is approved prior to the installing fixed forms or the use of slip forms.
520.03.04 Forms. Use steel side forms having a thickness of at least 7/32 in. and a depth equal
to the edge thickness of the pavement. Forms shall have a base equal to the height, a flat-flanged tread or top surface not less than 2 in. wide, and be of sufficient strength to resist all loads applied during the paving process. Do not use built up forms or warped forms. Use form sections that are at least 10 ft long except for installation along curves with a radius of less than 200 ft. For a curve radius less than 200 ft, use form sections that are no more than 6 ft long or use curved forms. All form sections shall have stake sockets that will accommodate a 1 in. diameter steel stake. Sections 10 ft or greater in length shall have at least three sockets. Sections less than 10 ft long shall have at least two sockets. Fasten keyways rigidly to the form. Provide holes through both the form and the keyway to accommodate tie bars or dowels. Place the forms to a tolerance of 1/8 in. in 10 ft for the top, and 1/4 in. in 10 ft for the face. Provide a means for locking the ends of abutting sections. Forms shall be clean and coated with an approved form release compound. Remove or repair forms that are bent, deformed, or broken. 2025 STANDARD SPECIFICATIONS FOR CONSTRUCTION AND MATERIALS Set grade controls at intervals of no more than 25 ft. Set the forms at least 400 ft ahead of concrete placement. When the foundation has been disturbed subsequent to the forms being set to the correct grade, make corrections as approved. Check the alignment and grade for conformance with the Contract Documents. Use an approved device such as a scratchboard and make any necessary corrections prior to concrete placement. Wooden forms may be approved for use in exceptional cases, such as for curves of very short radius or when a nonstandard length of straight form is required.
520.03.05 Slip Form Paving. Unless otherwise approved, the minimum width of slip form
paving shall be 24 ft. The total foundation width shall be graded using machine methods. Set grade controls using string lines at intervals of no more than 25 ft. Construct the foundation as specified in 520.03.03; completed and approved at least 1000 ft ahead of the paver before paving begins. Stop paving whenever the paving machine comes to within 200 ft from the end of the approved foundation, and install a bulkhead construction joint. When paving adjacent to an existing pavement, the portion of the equipment supported by the existing pavement shall have wheels with rubber tires or crawler treads on protective pads. Maintain a clearance of at least 1 ft from the inner edge of the paver track or wheel to the edge of the existing pavement. Slip forms shall be spaced and braced in a vertical position at a uniform and constant width, and of a length sufficient to prevent slumping or sagging of the sides and top edges of the pavement slab. Slip form equipment shall be capable of placing and securing embedded tie bars and keyways in proper position in the plastic concrete before the edge of the pavement slab is free of the slip form.
520.03.06 Reinforcement. Reinforcement shall be as specified. Dowel bars are smooth round
bars which serve as load transfer devices across transverse concrete joints to allow concrete slab contraction and expansion, regardless of whether they are designated by bar number or diameter. Refer to Standard MD 572.21 for dowel bar sizes and requirements. Refer to Standard MD 572.23 for dowel bar assembly. Tie bars are deformed rebars or connectors used for holding together longitudinal concrete joints, regardless of whether they are designated by bar number or diameter. Maintain the reinforcement in a clean condition, free from foreign material that may prevent proper bonding of the concrete. Secure all reinforcement to prevent displacement or movement.
520.03.07 Concrete Placement. Prior to placement of the concrete, ensure that the foundation is
in a moist condition. In addition, if the concrete is exposed to the direct rays of the sun and the ambient temperature is 70 F and rising, sprinkle the forms and reinforcement with cool water just before placement of the concrete. Once deposited within the forms, keep any rehandling to a minimum. Where concrete is to be placed adjoining a previously constructed lane of pavement, mechanical spreading and finishing equipment may be operated upon the existing lane of pavement only after the existing concrete has reached a compressive strength of 3000 psi in conformance with 902.10.03. Wheels that rest on the previously completed concrete shall be flat without flanges, at least 3 in. wide, and located far enough from the edge of the slab to preclude spalling or damage. Perform sampling for control testing at the time of concrete placement and as specified in 902.10.08. Deposit the total depth of the slab in a single layer except as otherwise specified herein or approved. For pavement constructed using bar mat or wire fabric reinforcement, place the concrete in two layers, unless it is demonstrated that the bar mat or wire fabric can be properly supported on approved devices. Single Layer Placement. Set the reinforcement on chairs capable of maintaining the stability and proper elevation of the reinforcement. Welding of reinforcement to the chairs in lieu of wire ties will be permitted, except welding for epoxy-coated reinforcement will be permitted only if the epoxy coating is applied after the welding. Refer to Standard MD 572.23 for welding restrictions of dowels. Repair damage to epoxy coating using materials specified in 917.02. Two Layer Placement. Place the concrete and bar mats or wire fabric reinforcement in a continuous operation. First, place the concrete to the specified depth of reinforcement. Then place the reinforcement on the freshly deposited concrete; follow immediately with the second layer of concrete. 2025 STANDARD SPECIFICATIONS FOR CONSTRUCTION AND MATERIALS
520.03.08 Consolidation of Concrete.
Fixed Form Paving. Consolidate the concrete by using immersion type vibrators. Vibrators shall advance with the paving equipment and be set at the spacing and depth necessary to clear reinforcement by 1/2 in. Maintain the amplitude required to obtain thorough consolidation within the slab, along the faces of the forms, and at the joint assemblies. Avoid excessive vibration that results in segregation, and any vibrator contact with the side forms, joint assemblies, or underlying material. The consolidation system and settings are subject to approval. Slip Form Paving. Concrete consolidation systems shall be incorporated in the paving equipment. Submit the systems for approval. 520.03.09 Finishing. Machine Finishing. The machine shall be equipped with two transverse screeds with provision for adjustment to ensure that the concrete is at the specified crown and grade. Following the transverse screeds, the concrete shall be screeded longitudinally. The width of the working face of the screeds shall be at least 6 in. Use a chevron ("V" type) nonreciprocating finishing float or other approved type. The float shall be suspended from a frame that does not ride directly on the forms. Following the finishing float, use a long handled scraping straightedge 10 ft long to bring the pavement to the correct grade. When the finishing machine is operated over concrete that has partially set, make provisions to prevent damage to the concrete by the machine wheels. Hand Finishing. With approval, hand finishing may be substituted for machine finishing. Do not use rakes for handling concrete. 520.03.10 Slab Surface and Thickness Checks. Surface Check. After finishing, and before texturing of the concrete, check the entire surface by using an approved 10 ft long metal straightedge. Limit the surface deviation from a straight line or vertical curve transversely or longitudinally to 1/8 in. in 10 ft. Thickness Check. After the pavement is placed and before final acceptance, cut cores by which the Engineer will check the thickness. Perform coring according to MSMT 552. Locate cores every 1000 ft for each lane unless otherwise specified or directed. Fill core holes at no additional cost to the Administration. Pavement deficient in thickness by more than 1 in. will be unacceptable. Remove and replace the full pavement section. Deficiencies up to 1 in. will be subject to reduced payment as specified in 520.04.
520.03.11 Texturing and Edging. Texturing. Texture the surface of the pavement with longitudinally tined grooves using a
mechanical device (such as a wire comb), following concrete finishing and surface check. The device shall have a single row of tines with nominal widths of 5/64 in. to 1/8 in. each. The nominal spacing of the tines shall be 3/4 in. ± 1/8 in. center-to-center. The nominal depth of the tined 2025 STANDARD SPECIFICATIONS FOR CONSTRUCTION AND MATERIALS grooves shall be 1/8 in. ± 1/32 in. The device shall have horizontal and vertical controls to ensure straight, tined grooves of uniform depth. Begin texturing when the concrete is plastic enough to allow texturing to the depth specified, but dry enough to prevent the concrete from flowing back into the grooves. Avoid overlaps and tearing of the concrete. Protect a 2 in. to 3 in. wide strip of pavement surface from tining for the length of the pavement; centered along longitudinal joints. Extend the tining as close as possible to the edge of any adjacent pavement to be placed without damaging the edge. Do not tine areas 6 in. from the edge of pavements where adjacent pavement is not placed. Do not tine areas 1 ft from the curb in closed sections. Hand operated tining equipment that produces an equivalent texture with the specified spacing may be used on small or irregularly shaped areas. The completed textured finish shall exhibit a uniform appearance. Edging. Edge textured transverse and longitudinal slabs using a 1/4 in. radius edging tool when the concrete has reached its initial set.
520.03.12 Curing. Following texturing and edging, cure the concrete for at least 72 hours.
Whenever the ambient air temperature falls below 40 F during the curing period, use insulated or electric blankets, or a method approved by OMT, to maintain the concrete temperature above 40 F and extend cure time to at least 96 hours for cold weather applications. Use the methods described above in addition to any curing material that is used. Provide a sufficient number of high/low thermometers to monitor the temperature of the concrete. Cure the concrete using one of the following methods:
520.03.13 Form Removal of Fixed Form Paving. Unless otherwise directed, leave forms in
place until the concrete has set at least 12 hours. If the sides of the slab show no damage, continue curing for the remaining 60 hours of the 72 hour curing period. Repair damaged or honeycombed areas and then cure for an additional 72 hours.
520.03.14 Joints. Construct joints in conformance with the details specified, perpendicular to the
finished grade of the pavement, and sealed as specified in Section 523. Transverse expansion and contraction joints shall be straight and continuous from edge to edge of the pavement.
520.03.15 Pavement Profile. Refer to pavement surface profile requirements specified.
520.03.16 Opening to Traffic. The pavement may be opened to vehicular traffic after having
attained a compressive strength of 3000 psi. Field samples will be tested according to T 23.
520.03.17 Dowel Bar Placement Checks. After each day’s placement of the PCC pavement is
complete and cured, the alignment and placement of the dowel bars will be checked by the Administration using a non-destructive test method. All joints will be tested to determine conformance with the following.
520.04 Measurement and Payment
Plain and reinforced Portland cement concrete pavements will be measured and paid for at the Contract unit price per square yard for the pertinent Portland Cement Concrete Pavement item. The square yard measurement will be computed on the basis of plan width and as-built length measured along the pavement center line. The payment will be full compensation for all concrete, forms, reinforcement steel, chairs, epoxy coating, finishing, curing, joints, joint construction, saw cutting and joint sealing, and for all material, labor, equipment, tools, and incidentals necessary to complete the work.
520.04.01 Pavement Thickness Price Adjustment. Payment for areas that are accepted at a
reduced price for deficient thickness will be adjusted by the factors shown in the following table. Deficiencies will be determined by procedures specified in 520.03.10. There will be no additional payment for excess thickness. 2025 STANDARD SPECIFICATIONS FOR CONSTRUCTION AND MATERIALS 2025 STANDARD SPECIFICATIONS FOR CONSTRUCTION AND MATERIALS PAVEMENT THICKNESS PRICE ADJUSTMENT DEFICIENCY IN INCHES PERCENT OF PAYMENT CONTRACT UNIT PRICE 0.00 to 0.20 100 0.21 to 0.30 80 0.31 to 0.40 72 0.41 to 0.50 68 0.51 to 0.75 57 0.76 to 1.00 50 Greater than 1.00 *See 520.03.10 0*
520.04.02 Dowel Bar Misalignment Price Adjustment. Payment for the percentage of joints
accepted at a reduced price for not conforming to the proper alignment will be adjusted by the factors shown in the following table. Alignment is determined by procedures specified in 520.03.17. This shall be a reduced price for the Portland cement concrete pavement item in addition to any reduction due to pavement thickness. *This is the percentage of all joints tested. **This price adjustment is to the PCC price and not for the dowel bars or joints. This is in addition to any price adjustment for pavement thickness. ***Corrective action may include removal and replacement, dowel bar retrofit, or other method approved by the Administration. Corrective action*** 70 75 85 90 95 100 Percent of Payment, Contract Unit Price ** DOWEL BAR PRICE ADJUSTMENT Percent of Misaligned Joints * 0 to 10 >10 to 15 >15 to 20 >20 to 25 >25 to 30 >30 to 50 Greater than 50 521 — CONTINUOUSLY REINFORCED PORTLAND CEMENT CONCRETE PAVEMENT CATEGORY 500 PAVING SECTION 521 — CONTINUOUSLY REINFORCED PORTLAND CEMENT CONCRETE PAVEMENT
521.01 Description
Construct continuously reinforced Portland cement concrete pavement on a prepared subgrade.
521.02 Materials
Refer to 520.02 and the following: Reinforcement. Section 908 for reinforcement, load transfer assemblies, tie bars, deformed steel bars, and longitudinal tie devices, except that all materials shall be epoxy coated. Select the type of reinforcement from one of the following:
521.03 Construction
Refer to 520.03 except as follows.
521.03.01 Placing Reinforcement. Preset the reinforcement on chairs or chair bars with the
transverse members placed below the longitudinal members. Place the longitudinal bars within the tolerances specified. Before placing the concrete, remove rust, mud, oil, or other detrimental coatings. Place the mat and fabric reinforcement flat and free from distortions. Furnish loose steel bars that are free from kinks or bends that prevent them from being properly assembled or installed. 2025 STANDARD SPECIFICATIONS FOR CONSTRUCTION AND MATERIALS