CATEGORY 200 GRADING SECTION 201 — ROADWAY EXCAVATION (CLASS 1, CLASS 1-A, CLASS 2)
201.01 Description
Excavate and grade for roadways and appurtenances to the lines and grades specified.
201.01.01 Classification
CLASS 1 — All excavation where the width of the bottom of the cut is 15 ft or more. CLASS 1-A — All excavation of unsuitable material below the lowest excavation limits established. CLASS 2 — All excavation where the width of the bottom of the cut is less than 15 ft. Excavation for flumes, ditches outside cut or fill slopes, and stream and channel changes are included in this classification unless otherwise specified.
201.01.02 Excavation. Excavation includes the following:
201.02 Materials
Not applicable. 2025 STANDARD SPECIFICATIONS FOR CONSTRUCTION AND MATERIALS
201.03 Construction
201.03.01 Grading Units. Each unit is the surface area of erodible earth that can be exposed to
construction operations without undue erosion or sedimentation. Refer to 101.03.01 for the size and number of units that can be opened at one time.
201.03.02 Use of Excavated Materials. Refer to TC-3.03 and Section 203. Do not waste
excavated material without prior approval. Do not use borrow unless provisions have been made for utilizing all available suitable excavated material in embankments.
201.03.03 Broken Pavement Material. Existing pavement, sidewalks, gutter, curb, and
combination curb and gutter within the excavation may be broken and used in embankments provided that the materials conform to 204.02.01. If the Engineer determines that the material is unsuitable, dispose of it as excess or unsuitable material.
201.03.04 Rock Excavation.
201.03.05 Frozen Material. Do not place frozen material in embankments. Stockpile the
material outside the construction limits and reserve it for future use. Replace any material that is wasted. Rehandling of excavated material and replacement of wasted material shall be at no additional cost to the Administration.
201.03.06 Serrated Slopes. Serrated cut slopes have continuously benched faces. Construct
serrated slopes as specified or as directed. Construct the benches as the excavation progresses, parallel to each other, level, and not graded to drain.
201.03.07 Drainage. Construct all drainage as specified in Section 308. Maintain the roadbed in
a well-drained condition at all times. Do not place excavated material within 3 ft of the edge of the ditch or channel. Do not allow material to obstruct normal surface drainage into the ditch or channel. Construct ditches draining from cuts to embankments or otherwise to avoid damage to embankments by erosion. Prior to placing any surface material, install all drainage necessary to provide free and uninterrupted flow of surface and underground water. When stabilized side and outlet ditches provide the principal means for drainage, cut and stabilize ditches as the first order of work in the grading operation.
201.03.08 Excavation Beyond Specified Limits. Except by written authorization, do not widen
cut or excavation sections beyond the limits of the typical cross section specified. When authorized, the procurement of additional material for embankments, unless otherwise specified under Borrow Excavation, will be as follows:
201.03.09 Unsuitable Material. Remove unstable or other unsuitable material encountered at or
below the specified typical section to the extent directed by the Engineer as Class 1-A Excavation. In rock areas, the limit of measurement for excavation will be the bottom of the typical section. Except when rock is encountered at subgrade, backfill all voids created by the removal of unsuitable material using the material specified.
201.03.09 01. Furnish and place backfill material immediately below top of subgrade as specified
in Section 211.
201.03.09 02. Furnish and place backfill material for embankment foundation as specified in
Section 204.
201.03.10 Coal Deposits. Notify the Bureau of Mines when coal is encountered. Send the notice
to the Director, Bureau of Mines, Maryland Department of Natural Resources. Dispose of any coal encountered on the project as directed by the Engineer.
201.03.11 Widening for Staged Roadway Construction. Limit the area to be excavated for
widening to the extent that the excavated area can be backfilled within the same working day using the excavated material or common borrow to form a temporary wedge. Refer to Standard No. MD 104.01-28 for the area to be backfilled. Maintain the 4:1 or flatter fill slope. Compact the material as directed and leave it in place until placement of the graded aggregate base course.
201.04 Measurement and Payment
Roadway excavation will be measured and paid for at the Contract unit price per cubic yard for the pertinent class of excavation. The payment will be full compensation for all excavation and hauling, blasting, formation and compaction of embankments and backfills, disposing of excess and unsuitable materials, preparation and completion of subgrade and shoulders except as 2025 STANDARD SPECIFICATIONS FOR CONSTRUCTION AND MATERIALS otherwise specified, serrated slopes, rounded and transition slopes, and for all material, labor, equipment, tools, and incidentals necessary to complete the work. Payment will not be made for excavation of any material used for purposes other than those designated. When only one bid item for either Class 1 or Class 2 Excavation is established in the Contract Documents, all roadway excavation (except Class 1 -A Excavations) shall be included in the unit bid price, regardless of the width of the excavation.
201.04.01 Limits of Measurement.
201.04.02 Template Method of Measurement. Unless otherwise specified, excavation will be
computed using the template from preliminary cross sections of the original ground surface combined with templates of the typical cross sections. If this method is used, the following volumes will be excluded.
201.04.03 Cross Section Method of Measurement. When specified, quantities for payment of
Excavation will be computed by average end areas from the cross sections of the original ground combined with cross sections of the completed work. Class 1 Excavation will be allowed in median areas of cut sections only where 4 inches or greater of topsoil is to be placed. This method will also apply to Class 1-A and Class 2 Excavation unless otherwise specified.
201.04.04 Presplitting will not be measured but the cost will be incidental to the Contract unit
price per cubic yard for the pertinent class of excavation in which it occurs. 201.04.05 Removal of existing pavement, sidewalk, paved ditches, curb, or combination curb and gutter, monolithic median, and full depth saw cuts outside the limits of any class of excavation will be measured and paid for as specified in 206.04.02.
201.04.06 Full depth saw cuts, removal of existing pavement, sidewalk, paved ditches, curb, and
combination curb and gutter, and monolithic median within the limits of any class of excavation 2025 STANDARD SPECIFICATIONS FOR CONSTRUCTION AND MATERIALS 2025 STANDARD SPECIFICATIONS FOR CONSTRUCTION AND MATERIALS will not be measured but the cost will be incidental to the Contract unit price per cubic yard for the pertinent class of excavation in which it occurs.
201.04.07 The Contractor or the Administration may elect to recompute quantities in any section
where it is believed the planned quantities are incorrect. When recomputation reveals an error, the corrected quantity will be used.
201.04.08 The excavated material or common borrow required to fill the temporary wedge area
as specified in 201.03.11, maintaining the 4:1 or flatter slope, compaction, and removal of the material will not be measured but the cost will be incidental to the Contract unit price for the pertinent class of excavation. Refer to 104.12.04 for measurement and payment of Drums.
201.04.09 Backfill for unsuitable material will be measured and paid for at the Contract unit price
for the pertinent item specified in the Contract Documents. 202 — CHANNEL OR STREAM CHANGE EXCAVATION (CLASS 5) CATEGORY 200 GRADING SECTION 202 — CHANNEL OR STREAM CHANGE EXCAVATION (CLASS 5)
202.01 Description
Excavate for changes in channels or streams when specified. Use all suitable material for the construction of the project. Dispose of unsuitable material as directed.
202.02 Materials
Not applicable.
202.03 Construction
Refer to Section 201.
202.04 Measurement and Payment
Class 5 Excavation will be measured and paid for at the Contract unit price per cubic yard. The payment will be full compensation for all excavation and hauling, formation and compaction of embankments and backfill, backfilling old stream beds or otherwise disposing of excess and unsuitable materials, and for all material, labor, equipment, tools, and incidentals necessary to complete the work. Material will be measured in its original position and the volume computed by the Method of Average End Area. The cross-sectional area measured will not include liquids. Measurement for Class 5 Excavation excludes any material removed outside the limits of payment as specified in the Contract Documents. 2025 STANDARD SPECIFICATIONS FOR CONSTRUCTION AND MATERIALS