CATEGORY 600 SHOULDERS SECTION 603 — SIDEWALKS
603.01 Description
Construct asphalt or concrete sidewalks and sidewalk ramps. Ensure that the sidewalks and sidewalk ramps are constructed in accordance with the most recent accessibility guidelines of the Americans with Disabilities Act (ADA).
603.02 Materials
Refer to 701.02, 705.02, 708.02, and the following: Curing Materials 902.07 Form Release Compound 902.08 Portland Cement Concrete 902.10, Mix No. 13 Asphalt Mix Section 904 Welded Wire Fabric 908.05 Joint Sealer 911.01 Preformed Joint Fillers 911.02 Borrow Excavation 916.01 Common Borrow 916.01 Topsoil 920.01.01, 920.01.02 Subsoil 920.01.03, 920.01.04
603.03 Construction
603.03.01 Concrete Sidewalks.
603.03.02 Asphalt Sidewalks.
603.03.03 Backfill. Backfill as specified in 602.03.01(i).
603.04 Measurement and Payment
The payment will be full compensation for all excavation, backfill, disposal of excess or unsuitable material, forms, reinforcement when specified, joints, sealer, compaction, curing, finishing, and for all material, labor, equipment, tools, and incidentals necessary to complete the work. The removal and disposal of unsuitable material will be measured and paid for at the Contract unit price for Class-1A Excavation, which price includes the cost of using acceptable excavation as replacement material. When Borrow, Topsoil, or other selected backfill is specified as replacement material, payment will be made at the Contract unit price for the respective items. When existing sidewalks are removed and replaced in the same location with new sidewalks, the removal will be measured and paid for as specified in 206.04.
603.04.01 Concrete Sidewalks will be measured and paid for at the Contract unit price per square
foot of finished surface including sidewalk ramps.
603.04.02 Asphalt Sidewalks will be measured and paid for at the Contract unit price per ton for
the mixture placed.
603.04.03 Turfgrass Establishment and Turfgrass Sod Establishment will be measured and paid
for separately. 2025 STANDARD SPECIFICATIONS FOR CONSTRUCTION AND MATERIALS 604 — CONCRETE TRAFFIC BARRIERS 2025 STANDARD SPECIFICATIONS FOR CONSTRUCTION AND MATERIALS CATEGORY 600 SHOULDERS SECTION 604 — CONCRETE TRAFFIC BARRIERS
604.01 Description
Construct concrete traffic barriers.
604.02 Materials
Crusher Run Aggregate CR-6 901.01 Aggregate 901.01, Size No. 57 Curing Materials 902.07 Form Release Compound 902.08 Portland Cement Concrete 902.10, Mix No. 3 Portland Cement Concrete 902.10, Mix No. 6 or 420.02.04 and 902.10 PVC Pipe Section 905 Reinforcing Steel Section 908, Grade 60, Epoxy Coated Preformed Joint Fillers 911.02 Borrow Excavation 916.01 Geotextile Section 919 Reflective Delineators QPL Fusion Bonded Epoxy 917.02 Use concrete mix No. 6 to construct all concrete traffic barriers, end transitions, and footers unless otherwise specified.
604.03 Construction
Use cast-in-place construction. Excavate to the required depth and to a width that will permit the installation and bracing of forms where necessary. Remove all soft and unsuitable material, and replace it with suitable material. Properly shape the subgrade and compact it as specified in Section 208.
604.03.01 Concrete Barriers. Forming of the footer or concrete barrier may be by either the fixed
form or the slip-form method. Do not construct the footer and the barrier section monolithically.