General Provisions (00100-00999)

145495 — Application of Bridge/Structure Numbers

MD · 2025 Standard SpecificationsBook pages 615615View official source ↗

CATEGORY 400 STRUCTURES SECTION 495 — APPLICATION OF BRIDGE/STRUCTURE NUMBERS

495.01 Description

Apply Bridge/Structure Numbers to all completed structures.

495.02 Materials

Select a paint that is suitable for the particular application, subject to the approval of the Engineer.

495.03 Construction

Apply the Number as a last order of work. Refer to the pertinent details included in the Contract Documents for the size, location, etc. Ensure that completed work has sharp edges differentiating all coatings and the previous substrate. Properly prepare surfaces according to the paint manufacturer’s recommendations. Do not apply paint to wet or moist surfaces. On rehabilitation projects repaint the Number if it is faded, removed, or otherwise deemed necessary by the Engineer.

495.04 Measurement and Payment

Application of Bridge/Structure Numbers will not be measured but the cost will be incidental to the pertinent items specified. 2025 STANDARD SPECIFICATIONS FOR CONSTRUCTION AND MATERIALS 499 — WORKING DRAWINGS CATEGORY 400 STRUCTURES SECTION 499 — WORKING DRAWINGS

499.01 Description

Schedule and distribute working drawings, which are described in AASHTO LRFD Bridge Construction Specification, TC-1.03, TC-4.01, and as specified or required by the Administration. Working Drawings shall exhibit good drafting practices and represent the original work of the Contractor, fabricator, or supplier. Do not duplicate portions of the Plans except to clarify or to add details. When requested, specified, or required by the Administration or consultant, submit calculations and other information deemed necessary to backup working drawings. Sign and seal calculations and other backup material by a professional engineer registered in the State of Maryland.

499.02 Materials

Not applicable.

499.03 Construction

499.03.01 Schedule. As a first order of work, prepare and submit a schedule for the submission

of the working drawings as specified in 499.03.02 or 499.03.03. Coordinate the schedule with and in full accord with the Progress Schedule submitted to the procurement officer as specified in GP- 8.04 and TC-5.02. The schedule shall include each type of working drawings (e.g. form plans, structural steel, etc.), approximate number of drawings to be reviewed, estimated date of first submission, and estimated rate of submission of drawings (e.g. 5/wk). Where possible, submit the most crucial drawings first with sufficient time for review to minimize delays during construction.

499.03.02 Consultant Engineering Firm. When the Contract Documents specify that a

consultant engineering firm is to review the working drawings for the structure, send all working drawings to that firm. To expedite the checking and distribution of working drawings, the Contractor, fabricator, or supplier may send electronic PDF versions or hard copy prints of their submissions directly to the appropriate consultant engineering firm, with copies of all correspondence to the Contractor, Director-Office of Structures, and the District Engineer. If the Contractor requests that all plans be routed through the Contractor’s office, then the establishment of that procedure should be the first order of work in order to avoid possible misunderstandings as to the processing. Be advised 2025 STANDARD SPECIFICATIONS FOR CONSTRUCTION AND MATERIALS

Source: Maryland Standard Specifications for Construction and Materials, 2025 Edition. Pages 615615 of 1,113.