CATEGORY 400 STRUCTURES SECTION 436 — CLEANING AND PAINTING EXISTING STRUCTURAL STEEL
436.01 Description
Clean and paint existing structural steel, and repair existing coatings damaged during repairs or by the Contractor’s operations. Refer to Section 435 for cleaning and painting new structural steel.
436.01.01 Definitions of Areas to be Cleaned and Painted. The following terms designate the
specific areas to be cleaned and painted:
436.01.02 General. Perform the work according to SSPC Standards and the manufacturer’s
recommendations. Notify the Engineer of structural defects including cracks, missing bolts or rivets, and deterioration detected during cleaning and painting. Protect utility pipes, conductors, light fixtures, and conduits from these operations. Do not clean and paint them unless specified. Perform Quality Control (QC) inspections to ensure that each phase of the work meets Specification requirements. All maintenance of traffic required for corrective action shall be at no additional cost to the Administration. When a railroad is included in the project, all railroad fees shall be as specified, except that any additional impact on the railroad and associated fees due to corrective actions or additional inspections shall be at no additional cost to the Administration. Ensure that all operations meet the requirements of OSHA, including exposure to lead, arsenic, and cadmium. Comply with 29 CFR 1926 construction standards and the applicable Federal, State, and local laws, including COMAR 26.16.01. Existing paint systems and abrasives used for blast cleaning may include toxic metals such as lead, arsenic, cadmium, and chromium. Consider them as hazardous waste when removed, unless tests conducted as specified in the Toxicity Characteristic Leaching Procedure (TCLP), EPA Method 1311 prove otherwise. Prior to bidding, become familiar with the current environmental regulations and safety procedures. According to EPA’s Resource Conservation and Recovery Act (RCRA) regulation, the Administration shall be considered the “Waste Generator” of the paint wastes generated by the work on existing structures. The Contractor shall be considered the “Hazardous Waste Generator” of all other waste associated with the work. These include wastes produced such as petroleum waste, solvent related waste, unapplied waste paints, used rags, used protective clothing, and other personal protective clothing (PPE) determined to be wastes. Obtain an EPA Hazardous Waste Generator ID Number, and dispose of waste under manifest as required by RCRA (40 CFR 260 through 265, and 271). Prevent waste from entering into the environment by containing, collecting, storing, testing, and disposing of all waste in accordance with Federal, State, and local regulations. 2025 STANDARD SPECIFICATIONS FOR CONSTRUCTION AND MATERIALS
436.01.03 Minimum Contracting Requirements for Field Painting. Certify the
Contractor/subcontractor removing or applying paint as specified in (a) below. When the paint being removed contains toxic metals, certify the Contractor/subcontractor removing the paint as specified in (b) below. All certificates shall be effective prior to Award of Contract and shall remain in effect for the duration of the Contract. Refer to 436.03.01.
436.01.04 Definition of Bridge. The definition of the word “Bridge” as defined in TC-1.03 does
not apply to this Specification. References to “Bridges” in this Specification shall mean any structure carrying traffic, regardless of their length.
436.02 Materials
Paint Systems 436.02.01 and 912.05
436.02.01 Paint Systems. Provide all coats within the paint systems specified herein from the
same manufacturer. When more than one paint system is used, provide all overlapping paint systems from the same manufacturer. The color of the touch up finish coat on existing steel shall match the existing finish coat. The color of the finish coat shall be as specified.
436.02.02 Abrasives. Provide material safety data sheets (MSDS) for the abrasives and a letter,
from the abrasive supplier, indicating that expendable abrasives meet SSPC-AB 1 and recyclable abrasives meet SSPC-AB 3. Verify the cleanliness of recycled abrasives according to SSPC-AB 2.
436.03 Construction
436.03.01 Submittals. Submit the following drawings, plans, and information for accomplishing
the work. Except for (e) below, submit electronic versions in Portable Document Format (PDF) on company letterhead to the Office of Structures, Structure Inspection, and Remedial Engineering Division via email at: oospaintcontracts@mdot.maryland.gov. Do not proceed with the work until the submittals are approved by the Administration.
436.03.02 Personnel Qualifications and Responsibilities. Provide documentation that all
applicable project personnel meet the training and accreditation requirements of COMAR
26.16 01.
26.16 01.
436.03.03 Quality Control (QC) Plan, Inspection Procedures, and Recording Systems. Submit a Quality Control Plan for providing daily job quality control according to SSPC-QP1 for surface preparation and painting operations. The Quality Control Plan shall include the following:
436.03.04 Inspection Equipment. Provide for the exclusive use of the Engineer, the following
equipment and reference manuals for the QA observations of the cleaning and painting operations. Maintain, calibrate, and verify the equipment is in a condition that is satisfactory to the Engineer. The equipment will remain the property of the Contractor at the conclusion of the Contract.
436.03.05 Paint Quality Assurance (QA) Inspector Notification. Notify the Structure
Inspection and Remedial Engineering Division at least five working days prior to beginning field cleaning and painting of new and existing steel. A paint inspector will be provided to assist the Engineer in performing the QA observations of the cleaning and painting portion of the work. Failure to comply with this notification shall be cause for not accepting the work performed. Paint applied without QA acceptance may be required to be removed and reapplied at no additional cost to the Administration. Any test to determine acceptance shall be at no additional cost to the Administration. Do not perform additional work until a determination has been made.
436.03.06 Floodlighting. Provide floodlighting, including power sources, to supply adequate
illumination to all surfaces being prepared, painted, or inspected, including the underside and inside of the containment system, when containment is employed. Floodlighting shall meet SSPC-Technology Guide No. 12, be maintained in good working condition, and be of an approved design. Adjust the floodlighting to avoid glare to marine and vehicular traffic.
436.03.07 Field Cleaning and Painting. Refer to the Contract Documents for the appropriate
cleaning and painting requirements. 436.03.08 Painting Sequence. Do not paint the outside facing surfaces of beams until all concrete has been placed and parapet form brackets removed. However, the primer coat may be applied to these areas prior to placing the form brackets provided that it is properly touched up prior to placing the next coat of paint. Protect concrete from being stained by painting operations. Restore painted or stained concrete surfaces to originally intended color without damaging the concrete. Proceed with cleaning and painting by sections, bays, or other readily identifiable part of the work as approved. Start the work at the top and proceed toward the bottom. 436.03.09 Surface Preparation. Prepare surfaces as specified in the pertinent SSPC Specifications and the Contract Documents. Surface conditions shall meet the pertinent SSPC- VIS Standards, and the test plates/sections as specified in 436.03.11. 2025 STANDARD SPECIFICATIONS FOR CONSTRUCTION AND MATERIALS
436.03.10 Methods of Cleaning. Methods shown in the following table apply to both shop and
field cleaning and shall be performed in the order shown. The methods are invoked based on the Paint System specified. PAINT SYSTEM SUBSTRATE METHOD OF CLEANING C, D, I & J Abrasive blast cleaned steel Existing Paint to be Removed - Localized (a) and (b) and complete (h) E & H Overcoating existing paint Existing Paint to be Overcoated - Localized (a) and complete (c) followed by (d) and (e)
436.03.11 Test Plates/Sections. When abrasive blast cleaning is specified, furnish two
12 in. x 12 in. x 1/4 in. steel test plates and clean them to meet SSPC VIS Standards and the Contract Documents. Apply a clear protective coating to these standard test plates and use them as a job sample standard for cleaning operations. When approved as an alternative to the test plates, portions of an actual work piece may be used in order to reach agreement on the degree of cleaning before production surface preparation begins. When the SSPC VIS Standards accurately depict the agreed upon degree of cleaning on the test section, the prepared section does not have to be sealed and retained for future reference. When the SSPC VIS Standards do not accurately depict the degree of cleaning, the test section shall be sealed and retained, or the test plates utilized. For the production cleaning operations, the written requirements of this Specification, the SSPC definitions, the test plates, and the SSPC VIS Standards shall be used in that order for determining compliance with the Contractual requirements.
436.03.12 Removal of Vegetation, Planking, Signage, and Cleaning of Drainage Troughs.
Prior to surface preparation, remove vegetation overhanging or fouling the structure and remove any accumulations of debris from inside the drainage troughs. When the structure has planking (timber or plywood) between the beams, carefully remove it in the areas of work operations. Existing planking that is in good condition may be used in the proposed planking operations. Store and maintain in good condition the existing planking that is to be reused. Dispose of all debris on the planking and any planking that is not to be reused. Unless otherwise directed, install the proposed planking after the cleaning and painting operations are complete. The Engineer may direct that the existing planking be reinstalled, or the proposed planking be installed before opening lanes to traffic during that same working day. The Engineer may also request that planking be installed or reinstalled during periods of work stoppage. Reinstall the existing planking or install new planking in the same locations as the existing by following the details in the Contract Documents. Cut any existing planking to fit the details as necessary. Add any missing elements (additional plywood, timber beams, etc.) or replace poor elements with new timber as specified in 921.05. When the fascia webs of the structure contain street identification signs, remove them prior to starting cleaning operations in the area. Clean and paint areas exposed by the sign removal, including bolt holes. Whenever a sign is removed, notify the Engineer. The Engineer will notify the Office of Traffic and Safety’s Chief, Traffic Operations Division. Street signs may be reinstalled by the Office of Traffic and Safety utilizing the Contractor’s maintenance of traffic. They will coordinate this work with the Contractor. If drainage troughs are present, conduct a survey of the troughs prior to construction and document the condition of all trough materials. Notify the Engineer of the locations where trough materials are in poor condition. Clean all drainage troughs on the structure unless otherwise directed by the Engineer. Replace drainage troughs as directed by the Engineer. Support the weight of the trough material to prevent tearing during removal. Remove any hardware used to attach the trough to the structure (e.g.- nuts, bolts, brackets, and fittings). Store and maintain the hardware so that it may be reused when reinstalling the troughs. Remove and properly dispose of any accumulations of debris from inside the trough. Upon completion of cleaning, re-attach the trough material in the same manner it was removed. Overlapping pieces of trough material must maintain the same pattern of overlap as when they were removed. Regardless of whether troughs are removed, 2025 STANDARD SPECIFICATIONS FOR CONSTRUCTION AND MATERIALS replaced, or cleaned, ensure that no paint related debris is present within the troughs at the completion of painting operations.
436.03.13 Repair of Surface Imperfections. Regardless of the method of cleaning, remove
surface imperfections such as sharp fins and slivers, rust scale, weld spatter, and pack rust by a combination of cleaning procedures such as using hand or power impact tools (chipping hammers or scaling hammers), blast cleaning, etc., without scarring good steel.
436.03.14 Feathering and Removal of Defects in Existing Coating. For projects involving the
touch up or overcoating of newly installed steel or existing coatings in the field, regardless of the method used for cleaning, feather the edges of old paint permitted to remain. Remove portions of paint on previously painted surfaces that are chalky, powdered, cracked, or otherwise unacceptable. Remove runs and sags in the existing paint on the outside facing surfaces of fascia beams over highways. Ensure a smooth appearance after application of the new coating.
436.03.15 Surface Condition Prior to Painting. Remove residual dust, dirt, and grease from the
surface as the final procedure prior to painting and between coats whenever the coating is contaminated. Cleaning includes the removal of all dust, puddles, grease, oil, exhaust from trucks, debris, concrete spatter, and other foreign matter on the surfaces being painted. Also remove debris on surfaces adjacent to those being painted. Concrete spatter stains that discolor the primer need not be removed provided material is not dislodged when wiping the surface with a cloth. Cleaning involves vacuuming, solvent cleaning, hand/power tool cleaning, and pressure washing as appropriate. Should an area of previously cleaned steel become soiled, contaminated, or rusted, reclean the area prior to painting at no additional cost to the Administration. Prior to the application of paint in the shop and field, the QC personnel shall inspect the surfaces and establish that they have been prepared according to the Specifications. Upon QC acceptance, obtain approval that the surfaces to be painted during that day have been cleaned as specified. Move all hooks, cables, beam clamps, and outriggers during cleaning operation to allow the underlying surfaces to be cleaned. Any containment attachments that cannot be moved during cleaning and painting must be power tool cleaned to SP-11 Bare Metal and coated using Paint System H.
436.03.16 Paint Storage and Mixing. Store paints and thinners in well ventilated areas that are
not subject to excessive heat, open flames, electrical discharge, and direct rays of the sun. Adhere to the manufacturer’s recommendations. Store materials in heated areas when necessary. Use materials on a rotating stock basis, and leave containers closed until used. Do not use paints that cannot be stirred to normal consistency. Store paint in tightly covered containers at an ambient temperature of at least 45 F. Maintain containers in a clean condition, free of foreign materials and residue. Remove and discard thin skins formed in the container. Do not use material that is livered, gelled, thick skinned, or otherwise questionable. 2025 STANDARD SPECIFICATIONS FOR CONSTRUCTION AND MATERIALS Mix paints according to manufacturer’s instructions and as approved. Do not thin the paint unless authorized by the paint manufacturer and approved. The Engineer shall be present whenever the paint is thinned. Do not use materials that are beyond their pot life or shelf life. For multiple component paints, only complete kits shall be mixed and used. Partial kit mixing is prohibited. Remove waste chemical solutions, oily rags, and other waste daily. Take precautionary measures to ensure protection of workers and work areas from fire hazards and health hazards resulting from handling, mixing, and applying materials.
436.03.17 Paint Representative. The representative shall be a technical representative of the
paint manufacturer. During initial execution of the work the Engineer may require the paint representative to be on site to approve with the Engineer the degree of cleanliness prior to painting and the method of application of the coating system. The Engineer may stop paint operations for failure to meet this requirement regardless of the reason for failure. Areas cleaned prior to ceasing paint operations shall be recleaned if required.
436.03.18 Field Painting. Meet SSPC-PA 1 for painting application and 436.03.19 through
436.03.22 436.03.19 Weather Requirements for Painting. All surfaces to be painted shall be sound and
cleaned as specified. Painting is allowed when:
436.03.20 Artificial Climate Controls
436.03.21 Application of Prime, Intermediate, and Finish Coats. All surfaces shall meet the
specified degree of preparation prior to the application of the paint system. Apply all paint according to the manufacturer’s recommendations except the dry film thickness shall conform to 912.05. Spray painting will be permitted provided the Engineer approves the location and method of spray application. Paint all areas adjacent to machinery and mechanical components, etc., by brush application unless the Engineer approves spray application. Surfaces inaccessible for painting by regular means shall be painted using sheepskin daubers or by other means as necessary to ensure coverage of the proper coating thickness. Move hooks, cables, beam clamps, and outriggers whenever possible to allow cleaning and application of all three coats of paint to these areas. Maintain, calibrate, and adjust the thickness measuring instrument, and take measurements according to SSPC-PA 2. Apply stripe coats using brush, dauber, or roller to all edges, outside 2025 STANDARD SPECIFICATIONS FOR CONSTRUCTION AND MATERIALS corners, crevices, welds, rivets, bolts, nuts, and washers prior to application of coatings according to the following schedule: SYSTEM COAT B II & III C I* & II E I & II H II & III I I* & II *Striping of Coat I is permitted after the application of Coat I if the stripe coat is tinted according to manufacturer’s recommendation. Ensure that each coat is free of shadow-through, skips, misses, and thin or heavy coating thickness. Repair defects prior to application of the next coat. Keep the surface to be coated dust-free during painting operations, and protect newly coated surfaces from the cleaning operations. When a previously cleaned or painted area becomes soiled, contaminated, or rusted, reclean the area to the specified condition and completely recoat at no additional cost to the Administration. Apply each coat within 30 days after the prior coat, unless approved in writing by the paint manufacturer. If the recoat window is exceeded, reclean the surface as approved by the paint manufacturer and the Engineer. At project completion, all fascia beams shall have a smooth and uniform appearance throughout. Should any fascia have runs, sags, heavy film build, blisters, bubbles, orange peel or any other coating defect which does not give the appearance of a smooth uniform surface, reclean and paint specific areas or the entire fascia as directed by the Engineer.
436.03.22 Control of Overspray and Spills. Protect the environment from paint droplets,
overspray, and spills by providing containment for the paint application area. Assume responsibility for any damage resulting from wind and cleaning and painting operations. Up to 2 in. of overspray will be permitted onto the adjacent surface of the bridge deck next to the top flange. No other overspray will be permitted. Whenever the method of protection fails to function at the required level of efficiency, immediately suspend all operations except those associated with minimizing adverse impact to the environment. Do not resume operations until modifications have been made to correct the cause of the failure. Use fire retardant containment screens, curtains, and tarpaulins. Paint operations may be stopped by the Engineer due to wind. However, operations shall stop if the wind velocity exceeds 20 mph, unless specific and approved precautions are taken to prevent the escape of paint droplets and overspray.
436.03.23 Caulking. Caulk the following areas with a material approved by the paint
manufacturer. Install caulking between the intermediate and finish coats: 2025 STANDARD SPECIFICATIONS FOR CONSTRUCTION AND MATERIALS
436.03.24 Defective Work. Neither conditions during application nor Laboratory acceptance of
paint shall remove the responsibility of obtaining a satisfactory paint system. When rusting occurs or a paint coat lifts, blisters, wrinkles, or shows evidence of having been applied under unfavorable conditions, the workmanship is poor, impure or unauthorized paint has been used, or for any other reason the painting is unsatisfactory, remove the affected paint and thoroughly clean the steel and repaint. Ensure that there is a uniform appearance throughout the structure.
436.03.25 Repair of Damaged Coatings due to Contractor Operations. Notify the Structure
Inspection and Remedial Engineering Division to determine the methods of cleaning and painting to be used.
436.03.26 Final Identification. When the final coat of paint is dry, stencil a legend on the
structure indicating the type of paint used in each coat, and the month and year in which each application was completed. Apply 2 in. to 2-1/2 in. high letters with black paint to the inside surface of a fascia beam near the abutment at a location selected by the Engineer. Use stencil paint that is compatible with the paint system applied. When more than one paint system is used, apply additional stencils.
436.03.27 Field Cleaning Waste Containment. Meet the SSPC Guide 6 containment levels
specified in 436.03.28 and 436.03.29. Applicable portions of these requirements apply to shops when existing steel coated with hazardous material is cleaned in the shop. With the exception of paint removal on the top flanges of members in preparation for deck replacement, provide a written Containment System Plan as specified in 436.03.28 unless otherwise directed.
436.03.28 Field Cleaning Containment System Plan Guidelines. Unless otherwise directed, the
following submittal requirements apply when a containment system is specified, regardless of the presence of toxic metals. Even if a written Containment Plan is not required, meet the technical requirements listed below when containment is used. Provide all submittals to the Office of Structures, Working Drawing Review Section. Provide the following:
436.03.29 Containment System Requirements by Method of Preparation. Refer to 436.03.10.
436.03.30 Worker Protection and Exposure Monitoring. In addition to complying with all
applicable OSHA and MOSH regulations, when the project involves coatings that contain toxic metals, provide the services of a CIH or CSP as specified in 436.03.02(c) and submit a Worker Protection Compliance Program as specified in 436.03.31. The CIH or CSP, or a technician working under the direction of the CIH/CSP shall monitor worker exposures during paint disturbance operations at each structure and provide worker protection oversight. Regardless of whether or not toxic metals are present, provide a hand wash station with soap and towels at each work site. As dictated by the monitoring results and the applicable OSHA standards, provide a cleanup area with a shower, soap, hot and cold potable pressurized water; a change area with a locker; and an approved container for collecting and disposing of waste at each work site. Ensure that the hand wash and shower facilities are available to all site personnel. Hygiene facilities shall meet 29 CFR 1926.51, Sanitation Standard.
436.03.31 Worker Protection Compliance Program. The Worker Protection Compliance
Program shall be on company letterhead and meet OSHA and the MOSH - Lead in Construction Standards, and other applicable toxic metal standards. The Worker Protection Compliance Program shall be reviewed, signed, sealed and submitted by the CIH or CSP who conducted the review. The Worker Protection Compliance Program shall include a commitment for the CIH or CSP, or a person working under the direction of CIH/CSP, to provide written certification each month of compliance with the Worker Protection Compliance Program, including biological monitoring. Provide a copy of the letter within 6 working days after the end of the month. A Worker Protection Compliance Program is not required when the coatings being disturbed do not contain toxic metals.
436.03.32 Environmental Protection. At the end of the shift each day and upon completion of
all project activities, clean the surrounding property and the entire project area so that it is free of visible debris from the cleaning and painting activities.
436.03.33 Environmental Protection Plan of Action (EPPA). An EPPA confirming that the
environment is protected from contamination is required when the coatings are being abrasive blast cleaned (regardless of the presence of toxic metals), or the coating being disturbed contains toxic metals (regardless of the method of preparation). When an EPPA is required, it shall be reviewed, 2025 STANDARD SPECIFICATIONS FOR CONSTRUCTION AND MATERIALS signed, sealed, and submitted by the CIH or CSP who conducted the review and shall include procedures for monitoring air, soil, and water. Include a location plan showing the type and location of high volume ambient air monitors if applicable, and the procedures that will be followed for visible emissions assessments and inspections of the soil, water, surrounding property and structures, and pavement. Submit 6 copies of each plan signed and sealed by the CIH or CSP. All submittals shall be in writing and on company letterhead. At least one copy shall have an original seal. Address the proposed procedures that will be implemented for the following as defined in 436.03.34:
436.03.34 Methods for Assessing Emissions. Unless otherwise specified, the following
requirements apply to all projects, regardless of the presence of toxic metals:
436.03.35 Field Cleaning Waste Disposal. Store all project waste, regardless of whether or not toxic metals may be present, in sealed 55 gallon drums. Drums shall be labeled with the structure number, Contract number, Contractor’s name, contents, and the date. Refer to 436.03.36 through
436.03 41.
When the waste is hazardous, comply with SSPC Guide 7. Each day, collect clothing and other waste material and seal them in 55 gallon drums. The drums shall be sealed 55 gallon open head type drums meeting I.C.C. Specification 17-H. All drums shall be in new condition.
436.03.36 Waste Handling Plan of Action. Required for the handling, storage, and disposal of
all hazardous waste, regardless of the presence of toxic metals. When the project involves the removal of paint containing toxic metals, the program shall be reviewed, signed, sealed and submitted by the CIH or CSP who conducted the review. The Plan of Action shall address the following:
436.03.37 Waste Sampling and Analysis. When the project involves hazardous waste, the CIH
or CSP, or an employee working under the direct supervision of the CIH or CSP, shall take at least four samples of the accumulated residues of each waste stream collected at each structure or a sample from every third drum, whichever is greater. All sampling shall be random and representative. Analyze the samples for TCLP as outlined in COMAR 26.13.02 and the EPA Test Procedure Manual, SW-846 for all RCRA 8 Metals. Waste shall not accumulate for more than 30 days before sampling. Analyze the representative samples collected by an approved laboratory and return the results to the Engineer within five working days of collection. Additional samples may be required if the average test results exceed 3.5 mg/l for lead, or exceed the threshold levels for other toxic metals allowed by COMAR and EPA procedures. The disposal method will be based on the results of these analyses, except handle, store, and dispose of waste generated using steel abrasives as hazardous waste regardless of the test results.
436.03.38 Temporary Waste Storage Site. Obtain an approved temporary storage site, and haul
the waste material away from the work site at the end of each working day. Ensure that the storage site prevents the migration of the contaminated material into the environment and that it is protected from vandalism and unauthorized access by the general public. Remove the waste from the temporary storage site within 75 days from the initial date of accumulation or before the completion of work, whichever comes first. When the Contract Documents specify that the waste containers shall be stored at a particular facility owned by the Administration, contact that facility to schedule delivery.
436.03.39 Waste Water Disposal. Test the waste water collected from bridge washing and
hygiene facilities for toxic metals. Perform tests using EPA Method 6010 by a laboratory approved by the American Industrial Hygiene Association. Provide the Engineer with the test results and written plans for the disposal of the water, including the name and address of the licensed transporter and disposal facility. If the local publicly owned treatment works (POTW) authorizes the disposal of the water down the sanitary sewer system, provide a letter from the POTW authorizing the disposal.
436.03.40 Hazardous Waste Transportation and Disposal. Maryland law provides that when
samples tested using TCLP exceed the threshold value (5 mg/l for lead), they shall be considered hazardous waste and be removed under manifest by a licensed hazardous waste transporter to a permitted disposal facility. When tested waste material is determined to be hazardous waste, request through the Administration an EPA identification number according to COMAR 26.13.03.03 . Provide the Engineer with written plans for the transportation and disposal of the waste, including the name and address of the licensed transporter and disposal facility. 2025 STANDARD SPECIFICATIONS FOR CONSTRUCTION AND MATERIALS Dispose of waste containing less than the threshold value by the TCLP test, including the confidence interval, as specified in 436.03.41 for RCRA 8 Metals. Prepare a manifest for hazardous waste to be transported from the approved temporary storage site. Manifests shall contain information stipulated in COMAR 26.13.03.04 and as otherwise required by State regulations. Forward the manifests to the Structure Inspection and Remedial Engineering Division. Individually sample drums of other wastes, such as solvent contaminated rags, disposable protective clothing, disposed dust collector filters, and other contaminated substances, and test appropriately. COMAR 26.13.03.05 stipulates the "Pre-Transport" requirements and the amount of time permitted for the accumulation of hazardous waste. Transport Waste by a certified waste hauler to a landfill permitted to accept this material. Obtain a list of certified haulers and other information regarding handling and disposal of blast waste by contacting the Department of Environment, Hazardous Waste Administration.
436.03.41 Nonhazardous Waste Disposal. Waste containing less than the threshold value (refer
to 436.03.40) by the TCLP test, including the confidence interval, may be disposed of as an industrial waste at a landfill permitted to accept this material. Dispose of all waste according to Federal, State, County, and local regulations. Cover waste containers/dumpsters when not in an active filling process. 436.03.42 Health and Safety Plan. Submit a site specific Health and Safety Plan on all projects where coatings removal or application occurs. The Health and Safety Plan shall address all anticipated project specific hazards, the policies implemented to address the hazards, identify the contractor’s on-site competent person, and provide emergency procedures to be followed, including emergency contact requirements and directions to the nearest emergency care facility. Provide concepts and calculations for fall protection systems which are manufactured or assembled on site.
436.04 Measurement and Payment
The Contract unit price for the item specified will be full compensation for all cleaning and painting, scaffolding, platforms, containment systems, permits, working drawings, daily quality control records, professional engineer’s services used for containment, industrial hygienist services, air monitoring, sampling and testing of materials for toxic metal content, including any revisions and resubmissions that may be required during the execution of the work, providing safe access for inspections, hand wash station/decontamination area, floodlighting, test plates, drums, collection and storage at the temporary storage site, hauling and disposal at an approved industrial waste site or hazardous waste site, removal of debris, and all material, labor, equipment (including test equipment), tools, and incidentals necessary to complete the work. 2025 STANDARD SPECIFICATIONS FOR CONSTRUCTION AND MATERIALS 2025 STANDARD SPECIFICATIONS FOR CONSTRUCTION AND MATERIALS
436.04.01 Cleaning and painting existing structural steel will not be measured but will be
paid for at the Contract lump sum price for the pertinent cleaning and painting items.
436.04.02 All costs associated with the repair of existing coatings due to new construction,
structural repairs, and damage caused by the Contractor’s operations will not be measured but will be incidental to the pertinent repair items, structural steel items, or cleaning and painting items.
436.04.03 Cleaning of Drainage Troughs will not be measured but will be incidental to the
pertinent cleaning and painting items. The payment will be full compensation for all material, labor, equipment, tools, and incidentals necessary to complete the work.
436.04.04 Repair and Replacement of Existing Drainage Troughs will be measured and paid for
at the Contract unit price per linear feet. The payment will be full compensation for all material, labor, equipment, tools, and incidentals necessary to complete the work.
436.04.05 Timber Planking will be measured and paid for at the Contract unit price per square
foot. The payment will be full compensation for the removal of existing planking, removal, and disposal of debris on existing planking, storage of existing planking materials to be reused, modification to existing planking, new planking, construction and installation of proposed planking and all material, labor, equipment, tools, and incidentals necessary to complete the work. 440 — PRESTRESSED CONCRETE BEAMS AND SLAB PANELS CATEGORY 400 STRUCTURES SECTION 440 — PRESTRESSED CONCRETE BEAMS AND SLAB PANELS
440.01 Description
Furnish and place prestressed concrete beams and slab panels, elastomeric bearing pads, bearing plates and other embedded items, all steel strands, jacks, and other required devices. The concrete overlay riding surface for slab panel bridges is included in this work.
440.02 Materials
Fine Aggregate 901.01 Coarse Aggregate 901.01 Fine Aggregate for Overlay Bonding Grout 901.01, Fine Aggregate/Sand Mortar and Epoxies Cement 902.03 and 902.04 Admixtures: Air Entraining 902.06.01 Retarding 902.06.02 Water Reducing 902.06.02 , 902.06.03 Pozzolans 902.06.04 , 902.06.05 Concrete Overlay 902.10, Mix No. 8 Nonshrink Grout 902.11(c) Self-Consolidating Concrete 902.17 Reinforcing Steel 908.01 Welded Steel Wire Fabric 908.05 Prestressing Strand 908.11 Elastometric Bearing Pads 910.02 Closed Cell Neoprene Sponge Elastomer 911.10 Production Plants Section 915 Fusion Bonded Epoxy Powder Coating for Steel 917.02 Water 921.01 Epoxy Adhesive 921.04 2025 STANDARD SPECIFICATIONS FOR CONSTRUCTION AND MATERIALS