CATEGORY 400 STRUCTURES SECTION 465 — MISCELLANEOUS COATINGS FOR METAL (STEEL)
465.01 Description
Furnish and apply various coatings to metal surfaces as specified. Refer to Sections 435 and 436 for cleaning and painting new and existing bridge structural steel, respectively.
465.02 Materials
Paint System C 912.05 Fusion Bonded Epoxy Powder Coating for Steel 917.02 Fusion Bonded Polyester Powder 917.03 Hot Dip Galvanized Zinc A123, A153, and 465.03.05(c) Galvanizing Repair A780 and 465.03.05(c) Use paint and powder coating material selected from the Qualified Products List (QPL).
465.03 Construction
Perform cleaning and coating in an approved environmentally controlled plant. Provide the Administration with access to each part of the process. The Administration reserves the right to witness or perform any Quality Assurance testing on a random basis. Use polyester powder coating when coatings other than paint are specified for steel or aluminum or as directed. The powder coating applicator shall have demonstrated the ability to properly apply and cure the materials of the system and shall be on the Administration’s Approved List of Applicators prior to application of any coatings. Coaters shall be qualified for paint and for powder coating as specified in 435.01.04. Galvanizers shall be on the Administration’s Approved List of Galvanizers.
465.03.01 Nongalvanized Carbon Steel. Prepare steel metal surfaces as specified in
436.03 10(h). All cut edges shall be broken. Clean all items to be coated of any oil or grease
according to SSPC SP-1 and abrasive blast to Near White according to SSPC SP-10. Remove weld spatter, slivers, hackles, or other defects. Protect cleaned surfaces from high humidity, rainfall, and surface moisture. Do not allow cleaned surfaces to flash-rust. Ensure that the blast profile is 2 mils to 3 mils according to D4417, Method C. 2025 STANDARD SPECIFICATIONS FOR CONSTRUCTION AND MATERIALS
465.03.02 Hot Dip Galvanized Carbon Steel. Metals for primary members that have reactive
steel chemistry require the galvanizer to document the steps to be taken to ensure proper adhesion in their Quality Control Plan. Remove weld spatter, slivers, hackles, or other metal defects prior to galvanizing. Reactive steel for structural elements shall be abrasive blast cleaned to SP6 with a 2 mil to 3 mil profile prior to galvanizing. The galvanizer shall ensure that the finished galvanized product to be coated is free of excessive zinc areas, spikes, slivers, ash, and dross or other detriments. Paint or powder coat hot dip galvanized steel as specified. Galvanized items shall not have been galvanized more than one month prior to coating and shall not have been water or chromate quenched. Store items to be coated in an environment free of moisture and dust for a period of 12 hours maximum, when coating application does not immediately follow the sweep blast surface preparation.
465.03.03 Aluminum. Clean and prepare aluminum surfaces to be coated using a five step or
more process consisting of cleaning, rinsing, pretreatment or conversion coating, rinsing, then sealing. Do not use any product that contains hexavalent chromium. Use water break test according to Federal Standard TT-C-490F after all cleaning methods to check for freedom from organic contaminants. Submit the coating process to be used and the quality assurance plan, along with the coating manufacturer’s recommendations, for approval prior to coating. 2025 STANDARD SPECIFICATIONS FOR CONSTRUCTION AND MATERIALS
465.03.04 Adhesion. Adhesion of the paint or powder coating system to either bare or galvanized
metal or aluminum shall be at least 4 A when tested according to D3359, Method A.
465.03.05 Touch Up System. Provide a compatible touch up system to repair defects, areas
damaged during erection, and all visible open areas. Prepare areas to be repaired and apply touch up systems according to the coating manufacturer’s recommendations.
465.03.06 Defects. Visually inspect all items for pinholes, blisters, bubbles, sags, handling damage, and other defects. Repair all pinholes, blisters, and bubbles to intact surface by grinding. Repair any sags or damage that have resulted in cracks or delamination as specified in 465.03.05, if required. If defects exceed 1/2 of 1 percent of the surface area of the item and total repairs exceed 1 in. in the narrowest dimension, the whole item shall be touched-up and coated.
465.03.07 Holiday and Pinhole Testing. The paint and powder coat finished surfaces shall be
holiday and pinhole free when tested with a low voltage holiday detector (minimum 67 1/2 volts) according to D5162. Repair all holidays and pinholes detected with additional coating.
465.03.08 Color. The color of all coatings and touch up systems shall match Federal Standard 595
and the following: COLOR COLOR NO. Brown 20040 Black 27038 Green 24108
465.03.09 Certification. Paint shall meet 912.01.03, epoxy powder coating shall meet 917.02.02,
and polyester powder coating shall meet 917.03. The acceptance of hot dip galvanized zinc will be based on inspection and shall meet A123, A153, and the Contract Documents. 2025 STANDARD SPECIFICATIONS FOR CONSTRUCTION AND MATERIALS
465.04 Measurement and Payment
specified. 2025 STANDARD SPECIFICATIONS FOR CONSTRUCTION AND MATERIALS Coatings for metal will not be measured but the cost will be incidental to the pertinent items 469 — POROUS BACKFILL CATEGORY 400 STRUCTURES SECTION 469 — POROUS BACKFILL
469.01 Description
Furnish and place porous backfill material, reinforced concrete base, and pipe drains at the rear of abutments, wing walls, retaining walls, and other locations.
469.02 Materials
Porous Backfill, Size No. 57, Aggregate 901.01 Portland Cement Concrete 902.10, Mix No. 1 Pipe Drains Section 905 Reinforcement Steel 908.01 Geotextile, Class as specified Section 919
469.03 Construction
Place porous backfill material in layers in conjunction with the adjacent fill. Any fill material removed for placing the porous backfill material shall be at no additional cost to the Administration. When a form is used between the porous backfill material and the earth backfill, completely remove the form from the completed fill. Slope concrete base to drain to points of discharge.
469.04 Measurement and Payment
Porous backfill will not be measured but will be paid for at the Contract lump sum price for the pertinent Porous Backfill item. The payment will be full compensation for all excavation, concrete, reinforcement, geotextiles, drains, and for all material, labor, equipment, tools, and incidentals necessary to complete the work. If no item for porous backfill appears in the Contract Documents, the work will not be measured but the cost will be incidental to other items specified. 2025 STANDARD SPECIFICATIONS FOR CONSTRUCTION AND MATERIALS