CATEGORY 500 PAVING SECTION 507 — SLURRY SEAL AND MICRO-SURFACING
507.01 Description
Construct an asphalt emulsion seal course using Slurry Seal (SS) or Micro-Surfacing (MS).
507.02 Materials
Slurry Seal and Micro-Surfacing Section 923
507.03 Construction
507.03.01 Certification. Furnish certified weigh tickets daily for the emulsion, residual asphalt
content, latex emulsion, aggregate, and mineral filler. The weigh tickets will be used to determine in-place application rates.
507.03.02 Sampling and Testing. Sample the asphalt emulsion seal mixture and the asphalt
emulsion at least once daily during paving. Provide samples for asphalt content from the completed mix produced by each mixing unit to be tested by the Administration. Asphalt content will be determined by Ignition Method. Engineer to witness and submit the samples and proper documentation/certification to the Asphalt Technology Division of the Office of Materials Technology (OMT). Residual asphalt content and gradation will be determined in accordance to T 30 and T 164, or T 308. The residual asphalt content shall be within +/- 1.5 percent of the Job Mix Formula (JMF). When successive tests for a mixing unit fail, or one test fails by more than 2 percent, that unit shall be removed from service until approved.
507.03.03 Weather Restrictions. Place asphalt emulsion seal when the air and surface
temperatures are at least 50 F. The morning minimum surface temperature may be 40 F provided the ambient temperature is expected to rise to or above 60 F and is not expected to fall below 32 F within 24 hours after placement. Cease placement when the surface or air temperature falls below the specified limits. Ensure surface is dry, with no standing water. Place asphalt emulsion seal when it is not raining or foggy.
507.03.04 Mixing Equipment. Use a self-propelled, front feed, continuous loading mixing
machine. The machine shall proportion and deliver the materials to a revolving, multi-blade, shafted mixer; and discharge it continuously and uniformly. 2025 STANDARD SPECIFICATIONS FOR CONSTRUCTION AND MATERIALS 2025 STANDARD SPECIFICATIONS FOR CONSTRUCTION AND MATERIALS The mixer shall have devices that control the proportioning of each material. Calibrate the mixer for the mix design in the presence of an Administration representative or submit certified calibration documents for approval to ensure the SS or MS treatment meets the job mix formula. Calibrate the equipment using actual project materials and every time there is a change in material source or composition. Submit a source of materials and a mix design for approval in accordance with 923.05, with corresponding test data from an approved lab at least three weeks in advance of the paving operation. The machine shall have sufficient storage capacity for aggregate, emulsified asphalt, mineral filler, additives, and water to maintain an adequate supply of the materials for the proportioning controls. Add the proper amount of mineral filler to the aggregate before introduction into the mixer. Use mixing machines equipped with water pressure systems and nozzle spray bars to provide a water spray ahead of and outside the spreader box when required. Truck mounted machines with positive, non-slipping aggregate delivery systems, but without a front feed continuous loading feature, may be used on project segments of less than 15 000 yd 2 or for spot repairs. Have at least two truck mounted machines on the project prior to construction. Provide the data for each unit in graphic form indicating the stone gate setting required to obtain the residual asphalt content as determined in the mix design. Individual volume or weight controls for proportioning each material shall be provided and meters or counters shall be such that the Engineer may determine the amount of each material used at any time. Provide aggregate weigh tickets, a daily delivery summary, and an estimate of aggregate lost or otherwise not used.
507.03.05 Spreading Equipment.
507.03.06 Quality Control Plan (QCP). Submit a QCP for approval at least 30 days prior to the
placement of any asphalt emulsion seal. The Plan shall contain a list of technicians working on the project and their qualifications, current equipment calibration data and a statistically based procedure of random sampling. The Plan shall document the proposed methods for controlling the equipment, materials, production, and asphalt emulsion seal operation to ensure conformance. Discuss the Plan requirements at the pre-pave meeting.
507.03.07 Test Strip. Construct a test strip for approval at the beginning of the roadway project
and when there is a change in materials. Provide calibration data for the equipment before placing the test strip. The test strip will be incorporated into the project and the pay quantities if approved.
507.03.08 Surface Preparation. Perform surface preparation prior to applying the tack coat and
placing the asphalt emulsion seal as directed and as follows:
507.03.09 Application. Spread the asphalt emulsion seal to repair slight irregularities and to
achieve a uniform, skid resistant surface free of skips, lumps, or tears. Use squeegees and lutes to spread the mixture in areas that are inaccessible to the spreader box and in areas that require hand spreading. Additives may be used to provide a slower setting time when hand spreading is necessary. Pour the slurry seal in a small windrow along one edge of the surface to be covered and spread the material uniformly. Construct a smooth, neat seam where two passes meet. Remove excess material immediately from the ends of each run.
507.03.11 Defective Work. Correct defective work not meeting the following criteria, unless
otherwise directed in writing and as determined; to the satisfaction of the Administration and at no additional cost.
507.03.12 Tie-Ins for Entrances and Connecting Roads. Make tie-ins at entrances and
connecting roads as directed.
507.03.13 Traffic. Maintain active access control at intersections and entrances. When it is
necessary to open to traffic early, lightly sand the surface using the same aggregate as in the mix. Remove excess aggregate from the roadway in curb and gutter sections as required. Broadcast clean aggregate used in the seal treatment over the mix at intersections and/or entrances for temporary access as directed. Repair traffic-damaged asphalt emulsion seal at no additional cost. Place temporary pavement markings as specified in 104.11 after the mix has cured and as directed. Place permanent pavement markings, including thermoplastic pavement markings, at least seven days after curing.
507.04 Measurement and Payment
Slurry Seal and Micro-Surfacing will be measured and paid for at the Contract unit price per square yard for one or more of the pertinent items listed below. The accepted quantity of Micro-Surfacing Rutfilling will be paid for at the Contract unit price per ton. Payment will be full compensation for furnishing and placing the aggregate, tack coat, mineral filler, tie-ins to entrances and connecting roads, emulsion, latex emulsion, test strip, and for all material, labor, equipment, tools, and incidentals necessary to complete the work.
507.04.01 Slurry Seal Using Type II Mix (One Coat). 507.04.02 Slurry Seal Using Type III Mix (One Coat). 507.04.03 Micro-Surfacing Using Type II Mix (One Coat). 507.04.04 Micro-Surfacing Using Type III Mix (One Coat). 507.04.05 Micro-Surfacing Using Type II Mix (Second Coat). 507.04.06 Micro-Surfacing Using Type III Mix (Second Coat). 507.04.07 Micro-Surfacing Type Rutfilling. 507.04.08 Asphalt patches will be measured and paid for as specified in 505.04. 507.04.09 Removal of Pavement Markings will be measured and paid as specified in Section 558. 507.04.10 Sealing Cracks in Asphalt Pavement will be measured and paid as specified in
Section 510. 507.04.11 Price Adjustment. Material not in conformance may be accepted at a reduced price if the nonconformance is determined not detrimental to the work. The following price adjustment will apply:
507.04.12 Price Adjustment for Asphalt Binder. A Price Adjustment (PA) will be made to
provide additional compensation, or a credit to the Administration for fluctuations in the cost of asphalt binder. The prevailing base index price will be the price specified for PG 64S-22 Asphalt Binder posted at www.roads.maryland.gov (Business Center / Contracts Bids and Proposals) for adjustment purposes at time of bid opening. The PA will be made when the index price for the month of placement increases or decreases more than 5 percent of the prevailing base index price. Computations will be as follows: Percent Change = ((Pp – Pb)/Pb) x 100 PA = (Q/2000) x AR x (Pp – (D x Pb)) Where: PA = Price Adjustment for Slurry Seal or Micro-Surfacing Q = Quantity of Slurry Seal or Micro-Surfacing placed in pounds D = 1.05 for increases over 5 percent; 0.95 for decreases over 5 percent Pp = Index price for PG 64S-22 Asphalt Binder per ton for the month of placement Pb = Prevailing base index price for PG 64S-22 Asphalt Binder per ton AR= Asphalt Residue expressed as a decimal PA resulting in increased payment will be paid under the item Price Adjustment for Asphalt Binder. The item amount will be established by the Administration and shall not be revised. PA resulting in a decreased payment will be deducted from monies owed. 2025 STANDARD SPECIFICATIONS FOR CONSTRUCTION AND MATERIALS 508 — MILLING ASPHALT PAVEMENT CATEGORY 500 PAVING SECTION 508 — MILLING ASPHALT PAVEMENT
508.01 Description
Mill asphalt pavement.
508.02 Materials
Not Applicable.
508.03 Construction
Perform roadway patching as specified in Section 505 prior to milling. Additional roadway patching may be required after milling. Quality Control Plan (QCP). Submit a Quality Control Plan for Milling to the District Engineer for approval at least 30 days prior to milling according to the Field Quality Control Plan (QCP) in
504.03 The QCP shall show methods proposed to control and maintain the milling equipment,
materials, and daily milling operations. Discuss the Milling QCP requirements in the pre-construction, pre-pave, and progress meetings.