BORROW SECTION 209 124 SECTION 209 — BORROW
209.1Description.
This work consists of providing and placing borrow material from approved offsite borrow sources.
209.2Materials.
Borrow Section 1001
209.3Construction.
209.3.1 Borrow Sources.
material from an offsite borrow source. Submit a description of the approved material limits within the offsite borrow source and the method of excavation for a pproval by the Department’s Materials and Research Section.
the engineer’s written permission.
borrow source, and removed the overburden. Implement the physical control plan and obtain approval before the Department cross -sections the source. Control m ethods may include fencing, earth berms, guardrails, or other physical barriers. If the offsite borrow source is fenced, provide a padlocked gate at the entrance. The Department will retain the padlock key.
that allows accurate measurement. Prevent water from collecting or standing within the excavated borrow area. 209.3.2 Source Testing. The Department will assist the contractor in determining the quality and quantity of material from sources the contractor proposes to use. The Department will perform soil analysis tests. The Department will sample and test the offsite borrow source. 209.3.3 Borrow Placing and Compacting. Place and compact borrow in accordance with Section 202.3.8. 209.3.4 Providing Borrow for Utility Backfill.
agreed to by the contractor, the utility, and the engineer.
organizations involved will backfill utility trenches in accordance with Section 202.3.8. The Department will not require proof rolling. BORROW SECTION 209 125 209.3.5 Providing and Stockpiling Borrow. Provide and stockpile borrow in accordance with the contract .
209.4Method of Measurement.
borrow volume at the source, in its original position by cross -sections and computed by the method of average end areas or electronic surface comparison. The Departm ent will not include overburden or stripping material in the borrow measurement.
weight to cubic yards. If the Department approves the request, the Department will provide the approval to the contractor in writing. The Department and the co ntractor shall agree on the conversion factors from weight measurement to volumetric measurement before using the alternative method.
borrow types specified is not practical, the Department will consider 1 cubic yard to weigh 3,050 - pounds.
accordance with Section 109.1.
others using the borrow source tickets only.
209.5Basis of Payment.
The Department will pay for borrow at the contract unit price per cubic yard or ton. Price and payment will constitute full compensation for all Work. ITEM DESCRIPTION UNIT 209001 BORROW, TYPE A CY 209002 BORROW, TYPE B CY 209004 BORROW, TYPE C CY 209006 BORROW, TYPE F CY 209007 BORROW, TYPE A TON 209008 BORROW, TYPE B TON 209009 BORROW, TYPE C TON 209010 BORROW, TYPE F TON 209011 BORROW, TYPE B, PROVIDING ONLY TON 209012 BORROW, TYPE C, PROVIDING ONLY TON 20901 3 BORROW, TYPE F, PROVIDING ONLY TON