SOIL STABILIZATION PRACTICES SECTION 908 594 SECTION 908 — SOIL STABILIZATION PRACTICES
908.1Description.
This work consists of soil stabilization practices using perennial grasses, topsoil, topsoiling, and mulching.
908.2Materials.
inches in diameter and materials harmful to plant growth.
(Sicyos angulatus) , Giant Ragweed (Ambrosia trifida) , and Texas Amaranth (Amaranthus palmeri) .
needed to establish permanent vegetation.
temporarily stockpiling for later use in accordance with Section 202.
(Sicyos angulatus) , Giant Ragweed (Ambrosia trifida) , and Texas Amaranth (Amaranthus palmeri) .
needed to establish permanent vegetation.
ii. For project mixed seed of special seed formulas or mixtures not specified in Tables 908.2 -1 through 908.2 -3 and Table 908.2 -5, use seed previously inspected, tested, and approved by the Delaware Department of Agriculture for the designated purity, germination, weed seed limits, and pure live seed analysis. iii. Provide seed void of Johnsongrass (Sorghum halepense) , Canada Thistle (Cirsium arvense) , Burcucumber (Sicyos angulatus) , Giant Ragweed (Ambrosia trifida) , and Texas Amaranth (Amaranthus palmeri) .
ii. Table 908.2 -2 - Grass Seeding - Stormwater Facility (GS -SF) SOIL STABILIZATION PRACTICES SECTION 908 595 iii. Table 908.2 -3 - Permanent Grass Seeding - Subdivision Mix (PGS -SUB) iv. Tabl e 908.2 -4 - Temporary Grass Seeding (TGS)
Table 908.2 -1 - Permanent Grass Seeding - Dry Ground (PGS -DG) Species %Weed1 % Purity % Germination Lbs./Ac. Seeding Dates Hard Fescue Mixture (Festuca longifolia and Festuca trachyphylla) 0.15 98 85 100 Creeping Red Fescue (Festuca rubra L) 0.15 98 85 85 Redtop (Agrostis alba) 0.75 95 90 40 Trifolium repens L. var. “White Clover”4 0.10 75 80 5 Total Perennial Seed Quantity2 (lbs/Ac.) 230 Winter Cereal Rye (Secale cereal e) 0.75 98 85 20 1 Nov – 15 Feb Annual Ryegrass (Lolium multiflorum) 0.15 95 90 10 16 Feb – 30 Apr 1 Aug – 31 Oct Foxtail Millet (Setaria italic a) 0.5 95 95 20 1 May – 31 July
Table 908.2 -2 - Grass Seeding - Stormwater Facility (GS -SF) Species %Weed1 % Purity % Germination Lbs./ Ac. Seeding Dates Redtop ( Agrostis alba) 0.15 95 90 30 Indian Grass ( Sorghastrum nutans) 1.00 85 75 20 Deertongue ( Dichanthelium clandestinum) 1.00 95 60 20 Switchgrass ( Panicum virgatum) 1.00 95 70 40 Tickseed Sunflower ( Bidens aristosa) 0.09 98 91 10 Black -Eyed Susan ( Rudbeckia hirta) 0.00 99 97 10 Partridge Pea ( Chamaecrista fasciculata) 0.22 99 93 10 Yellow Blossom Sweetclover ( Melilotus officinales) 0.10 99 92 10 Total Perennial Seed Quantity2 (lbs/Ac.) 150 Winter Cereal Rye (Secale cereal e) 0.75 98 85 50 1 Nov – 15 Feb Annual Oats (Avena sativa) 0.15 95 90 40 16 Feb – 30 Apr SOIL STABILIZATION PRACTICES SECTION 908 596 1 Aug – 31 Oct Foxtail Millet (Setaria italic a) 0.5 95 95 40 1 May – 31 July
Table 908.2 -3 - Permanent Grass Seeding - Subdivision Mix (PGS -SUB) Species %Weed1 % Purity % Germination Lbs./Ac. Seeding Dates Turf-type Tall Fescue Cultivar3 (Festuca arundinacea var) 0.5 98 90 200 Perennial Ryegrass (Lolium perenne) 0.4 90 90 20 Kentucky Bluegrass (Poa pratensis) 0.4 90 80 30 Redtop (Agrostis alba) 0.75 95 90 40 Trifolium repens L. var. “White Clover”4 0.10 75 85 5 Annual Ryegrass (Lolium multiflorum) 0.15 95 90 20 Total Seed Quantity (lbs/Ac.) 315
Table 908.2 -4 - Temporary Grass Seeding (TGS) Species %Weed1 % Purity % Germination Lbs./Ac. Seeding Dates Winter Cereal Rye (Secale cereal) 0.75 98 85 50 1 Nov – 15 Feb Annual Ryegrass (Lolium multiflorum) 0.15 95 90 40 16 Feb – 30 Apr 1 Aug – 31 Oct Foxtail Millet (Setaria italic) 0.5 95 95 40 1 May – 31 July
SOIL STABILIZATION PRACTICES SECTION 908 597 Table 908.2 -5 - Permanent Grass Seeding - Streambank (PGS -SB) Species %Weed1 % Purity % Germination Lbs./Ac. Seeding Dates Tall Fescue KY 31 (Festuca arundinacea) 0.5 98 90 180 Perennial Ryegrass (Lolium perenne) 0.4 90 90 20 Redtop (Agrostis alba) 0.75 95 90 20 Annual Ryegrass (Lolium multiflorum) 0.15 98 90 10 Total Seed Quantity (lbs/Ac.) 230 1 Title 3 Delaware Code, Chapter 15, Seeds and its associated regulations identify several species of seed designated as Noxious Weeds by the Delaware Department of Agriculture. The Department will not allow these seeds in the allowable percentage of weed seeds. 2 Add the applicable quantity of seasonal nurse crop as listed according to the seeding date. 3 Base selection of Turf -type Tall Fescue Cultivars on performance within the Mid -Atlantic region as determined by the most current National Turfgrass Evaluation Program Progress Report. 4 Trifolium repens L. var. “White Clover” requires inoculation by Rhizobium leguminsarum biovar trifoli before seeding, unless purchased as pre -treated.
(https://deldot.gov/Business/index.shtml# ). The Department will not accept photodegradable products.
(https://deldot.gov/Business/index.shtml# ). The Department will not accept photodegradable products.
will not accept field mixing of hydraulic mulch additives or hydraulic mulch components. The Department will not accept paper or paper blend mulches.
908.3Construction.
SOIL STABILIZATION PRACTICES SECTION 908 598 A. Handle temporary stockpiled materials as follows.
streams, open channels, drainage inlets, and wetlands.
an approved Erosion & Sediment Control plan. Stabilize the work in the time specified in accordance with Section 908.3.B.
the engineer around the base of the pile in advance of the actual stockpiling operation in the time specified in accordance with Section 908.3.B. Place erodible earth material in neat piles. The engineer will decide the pile height requ irement within the operational right of way. Do not exceed a height of 20 -feet for piles not within the operational right of way. Seed and mulch all erodible temporary stockpiles urfaces in accordance with the temporary or final stabilization requirements of this section.
determined by the engineer.
height of 3 -inches and 70 percent uniform density over all seeded areas.
Table 908.3 -1 Stabilization of Erodible Earth and Maximum Allowable Time to Stabilize Location Type of Stabilization Maximum Time to Stabilize Sediment Controls Temporary Stabilization 7 calendar days from completion of construction of BMP devices such as ditches, sediment traps, or dewatering basins. Short term inactivity not meeting final grade and not to exceed 6 months Temporary Stabilization 14 calendar days from the end of ground disturbing work in the location. Areas meeting final grades or areas that will be inactive longer than 6 (6) months Final Stabilization 7 calendar days from the end of ground disturbing work in the location.
Track a cleated piece of equipment, such as a bulldozer, up and down the slopes so the cleats make horizontal indentations in the soil. Upon request from the contractor, the engineer may approve a different tracking pattern.
SOIL STABILIZATION PRACTICES SECTION 908 599 Construct, maintain, and remove stabilized pads of aggregate on a geotextile base at every exit from the construction site to prevent tracking dirt off -site.
and other refuse that may hinder or prevent growth of future plant materials in areas that call for topsoil placement.
than 2 inches in diameter.
needed to create the proper conditions for acceptance of permanent vegetation.
with Section 908.2.C.2 or as indicated in the contract.
the engineer no less than 2 working days before placement.
within 1 -week or before the next rain event.
recommendations.
Spread straw mulch at a rate of 2 -tons -per-acre. Immediately after placing the straw mulch, anchor mulch by crimping, tracking, liquid mulch binder, paper fiber, or netting. Apply liquid binder at the manufacturer’s application rate. Use 100 percent biodegradable netting secured so that the straw m ulch does not move. Do not use plastic netting.
Place erosion control blankets in accordance with the manufacturer’s recommendation.
SOIL STABILIZATION PRACTICES SECTION 908 600 Place turf reinforcement mat in accordance with the manufacturer’s recommendation.
construction entrance location.
pipe and grade to drain. Place the pipe before placing geotextile or stone. Excavate to the dimensions shown in the Standard Construction Details. Compact the sub grade, place geotextile on the compacted subgrade, and place the stone on top of the geotextile to the required depth.
Contractor to widen the entrance as required to prevent the entrance location from becoming a source of sediment.
day.
proper functioning. When the stone voids become filled with dirt, rake the surface to reestablish the voids.
Remove and replace the tope 2 -inches of stone with 2 -inches of clean Delaware No. 3 stone when voids are filled, or as directed by the engineer.
When the stabilized construction entrance is no longer needed for project access, or when directed by the engineer , remove all stabilized construction entrance materials. Restore to grade and stabilize the restored areas.
908.4Method of Measurement.
follows:
SOIL STABILIZATION PRACTICES SECTION 908 601 908.5 Basis of Payment.
stabilization required by other agencies having jurisdiction on stockpiles located outside the areas designated in the contract.
Price and payment constitute full compensation for:
ton. Price and payment constitute full compensation for:
yard. Price constitutes full compensation for preparing the ground and for providing and placing all materials.
Table 908.5 -1 as follows: Table 908.5 -1. Payment Schedule Seed Type Permanent Seed Permanent Seed Temporary Seed Completed Work at the time seed is acceptably placed production of a uniform stand of established perennial grass species having attained a height of 3 inches with a density of 70% of the seeded area for acceptance by the engineer . at the time seed is acceptably placed Percent of Total Item Price 100% 0% 100%
price per square yard. Price and payment constitute full compensation for providing and placing all materials. Should the contractor elect to use multiple pro ducts from the approved product list, SOIL STABILIZATION PRACTICES SECTION 908 602 the unit price will apply to all products listed under the corresponding item description on the DelDOT approved product list.
per square yard. Price and payment constitute full compensation for:
stone for topdressing;
contract unit price per ton of stone. Price and Payment constitutes full compensation for:
construction period.
slope tracking costs for preparing a seedbed as incidental to the topsoil Item.
seeding item when purchased pre -treated. 908.5.1 Maintenance Bond.
the work. Provide a maintenance bond that meets the following requirements:
Department of Insurance to write surety bonds in the State of Delaware. ITEM DESCRIPTION UNIT 908001 TOPSOIL TON 908002 TOPSOIL SY 908003 TOPSOIL, 4” DEPTH SY 908004 TOPSOIL, 6” DEPTH SY SOIL STABILIZATION PRACTICES SECTION 908 603 908005 TOPSOIL, 12” DEPTH SY 908006 TOPSOILING TON 908007 TOPSOILING SY 908008 TOPSOILING, 2” DEPTH SY 908009 TOPSOILING, 4” DEPTH SY 908010 TOPSOILING, 6” DEPTH SY 908011 TOPSOILING, 8” DEPTH SY 908012 TOPSOILING, 12” DEPTH SY 908013 TOPSOILING, 18” DEPTH SY 908014 PERMANENT GRASS SEEDING, DRY GROUND SY 908015 PERMANENT GRASS SEEDING, STORMWATER SY 908016 PERMANENT GRASS SEEDING, SUBDIVISION SY 908017 TEMPORARY GRASS SEEDING SY 90801 9 PERMANENT GRASS SEEDING, STREAMBANK SY 9080 20 EROSION CONTROL BLANKET MULCH SY 90802 1 TURF REINFORCEMENT MATTING, TYPE 1 SY 90802 2 TURF REINFORCEMENT MATTING, TYPE 2 SY 90802 3 STABILIZED CONSTRUCTION ENTRANCE SY 90802 4 STABILIZED CONSTRUCTION ENTRANCE, TOP DRESSING TON 908026 EROSION CONTROL MULCH SY