617000 STEEL SIGN STRUCTURE, TUBULAR ARCH, CANTILEVER LS

DE · 2025 Standard SpecificationsBook pages 320324View official source ↗

STEEL SIGN STRUCTURES SECTION 617 310 item will be the sum of the price for all sign structures listed on the breakout sheet. Submit the breakout sheet for lump sum items in accordance with Section 109. ITEM DESCRIPTION UNIT 617000 STEEL SIGN STRUCTURE, TUBULAR ARCH, CANTILEVER LS 617001 STEEL SIGN STRUCTURE, TUBULAR ARCH, OVERHEAD LS 617002 STEEL SIGN STRUCTURE, TRUSS TYPE, CANTILEVER LS 617003 STEEL SIGN STRUCTURE, TRUSS TYPE, OVERHEAD LS 617004 STEEL SIGN STRUCTURE, BRIDGE MOUNTED LS 617005 STEEL SIGN STRUCTURE, CENTER MOUNT LS

311 SECTION 619 — STONE AND BRICK MASONRY

619.1Description .

This work consists of providing, constructing, reconstructing, or repairing stone or brick masonry.

619.2Materials.

A.Mortar Section 1047.6
B.Provide stone of the type and dimensions specified in the contract and in accordance with Section

1040. Provide stone free of iron content significant enough to cause rust -staining of the stone or materials below the stone.

1.For repair or reconstruction, use salvaged stone from the site or provide stone to match existing

stone types, colors, sizes, shapes, and patterns.

C.Provide brick in accordance with Section 1040.
1.For repair or reconstruction, provide brick to match existing stone types, colors, sizes, shapes,

and patterns as closely as possible.

D.Provide steel wall ties or dovetails hot -dipped galvanized in accordance with Section 1039.10 or

stainless steel in accordance with AASHTO M163.

619.3Construction.

A.Submittals.
1.Submit the masonry contractor qualifications verifying successful completion of at least 3 similar

projects within the last 5 -years. Include a brief description of each project and the owner's contact person's name and current phone number for each project listed.

2.Submit samples of stone and brick for approval before starting work.
B.Place mortar to form a firm bond. Dispose of mortar not used within 30 -minutes after adding

water. Do not re -temper mortar.

C.Placing Masonry
1.Do not perform any masonry work when the temperature is below 40 degrees F.
2.Lay the stone to the wall pattern shown in the contract. Wet the stone before laying in mortar.

Fill all joints with mortar and finish as work progresses. Make mortar joints 1 -inch to 1 1/2 - inches thick.

3.Lay bricks using the shove -joint method to bed the bricks into the mortar. Do not use buttered

or plastered joints. Arrange all brick headers and stretchers in order to bond the mass with alternate courses breaking joints. Fill all joints with mortar an d finish as the work progresses. Make 1/4 -inch to 1/2 -inch thick joints. Do not use spalls or bats, except for shaping irregular openings or when unavoidable to finish out a course. If the engineer approves the use of spalls or bats, place full bricks at t he corners and place bats in the interior of the course.

D.After constructing the masonry, clean the entire area of all efflorescence, mortar, scars, or spots

to present a natural color. Clean the area with water. Treat with a solution of 1 percent hydrochloric acid and then wash again with water a final time. When cleaning stone masonry with 312 the solution, take care to notice any deteriorating reaction. If a reaction is noticed, stop using the solution, wash the treated area immediately and clean the stone masonry to present the natural color.

E.Before pointing existing masonry, rake all deteriorated and loose mortar from the joints. Clean the

joints with water under high pressure. Remove excess water from the cavity with air under high pressure. Wet joints before applying the mortar. Mix and p lace mortar in accordance with Section 619.3.B. Use only mortar that matches the color of the existing mortar. In hot or dry weather, shield pointing work from the sun and keep wet for a period of 3 -days after completion.

F.Exercise care when handling existing masonry planned for reconstruction. Avoid dropping,

breaking or scarring the stones. Reuse exposed surfaces of existing stone in the reconstructed structure, except as directed by the engineer. Ensure that the recons truction results in a structure that resembles the original and adjacent structures in overall appearance.

619.4Method of Measurement.

A.The Department will measure the quantity of:
1.Stone masonry by the square foot placed and accepted.
2.Brick masonry by the square foot placed and accepted.
3.Pointing masonry by the linear feet of joints pointed and accepted.
4.Reconstructing existing stone masonry by the square foot or cubic foot of existing stone

masonry reconstructed and accepted.

5.Reconstructing existing brick masonry by the square foot or cubic foot of existing brick masonry

reconstructed and accepted.

619.5Basis of Payment.

A.Price and payment for stone or brick masonry will constitute full compensation for:
1.Submittals;
2.samples;
3.providing;
4.placing;
5.cleaning stone or brick masonry; and
6.disposal of surplus materials.
B.Price and payment for pointing existing masonry will constitute full compensation for providing all

materials and pointing the joints as described in this specification.

C.Price and payment for reconstructing stone or brick masonry will constitute full compensation for

removing and stockpiling existing stone or brick, disposing of unsuitable materials, and providing, placing, and cleaning stone or brick masonry.

D.The Department will pay for excavating and backfilling in accordance with Section 207.

ITEM DESCRIPTION UNIT 313 619000 STONE MASONRY SF 619001 BRICK MASONRY SF 619002 POINTING EXISTING MASONRY LF 619020 RECONSTRUCTING STONE MASONRY SF 619021 RECONSTRUCTING STONE MASONRY CF 619030 RECONSTRUCTING BRICK MASONRY SF 619031 RECONSTRUCTING BRICK MASONRY CF

WOOD STRUCTURES SECTION 621 314 SECTION 621 — WOOD STRUCTURES

621.1Description.

This work consists of constructing wood structures and the wood portions of composite structures.

621.2Materials.

A.Wood Section 1041

621.3Construction.

A.Cure the wood before fabrication. Store wood after fabrication in a manner that prevents changes

in the dimensions of the members before assembly. Reject wood that shrinks during storage, causing predrilled grooves for split rings, plate size, or bolt h ole spacing to change.

B.Stack lumber and timber to prevent warping. Stack untreated material on supports at least 12 -

inches above the ground and open -stacked. Stack treated material on supports at least 12 -inches above the ground surface and close -stacked. Provide cover to protect materials from the weather.

C.Treated Wood.
1.To avoid damaging treated timber, handle with web slings. Provide corner protectors when

using metal bands to bundle members.

2.As much as is practical, cut, frame, and bore treated timbers before treatment.
3.Field -treat as necessary in accordance with Section 1041.4.E. After treatment, plug holes not

filled with bolts or other items, with preservative -treated plugs flush with the surface.

D.Connectors and fasteners.
1.When installing split rings and shear plates, use precut grooves of the specified dimensions, or

as recommended by the manufacturer. Force spike grids into the wood so that members are in firm contact. Use pressure equipment that does not damage the woo d surface. Replace temporary high -strength bolts with specified bolts for the final installation. Embed all connectors at the joint simultaneously and uniformly. Cut connector grooves in wood, concentric with the bolt hole. Make grooves conform to the cross-sectional shape of the rings and provide a snug fit. Make the inside groove diameter larger than the nominal ring diameter. Fabricate structural members using connectors before preservative treatment. Drill bolt holes perpendicular to the face of the mem ber.

2.For fastenings, drill holes for round drift bolts and dowels 1/16 -inch less in diameter than the

bolt or dowel. Drill holes for square drift bolts or dowels equal in diameter to the least dimension of the bolt or dowel. Drill the holes for machine bolts 1/16 -inch greater than the diameter of the bolt. Drill the holes for lag screws with a bit no larger than the body of the screw at the base of the threaded portion. Drill the hole for the shank 1/16 -inch greater than the diameter of the shank and to the s ame depth as the shank. Use a washer under bolt heads and nuts that would otherwise come in contact with wood, except for timber bolts with economy - type heads. Tighten all nuts to a snug fit condition. Retighten all nuts after full assembly. Lock the nuts of bolts after final tightening by burring or other approved method.

3.Countersink hardware when required to have smooth and flush surfaces. Treat all recesses

formed for countersinking in treated timber, in accordance with Section 1041.4.E.

Source: Delaware Standard Specifications for Road and Bridge Construction, 2025 Edition. Pages 320324 of 779.