JOINTS SECTION 624 324 4. Silicone seal constituting full compensation for removing and disposing of the existing seal, providing and placing all materials, and cleaning and preparing the joint.
providing and placing all materials, cleaning and preparing the joint, repairing spalls, and sealing cracks.
existing seal, pre -measuring, providing and placing all materials, and cleaning and preparing the joint.
ITEM DESCRIPTION UNIT 624000 PREFABRICATED EXPANSION JOINT SYSTEM, 3" LF 624001 PREFABRICATED EXPANSION JOINT SYSTEM, 4" LF 624002 PREFABRICATED EXPANSION JOINT SYSTEM, 5" LF 624003 STRIP SEAL GLAND, 1 1/2" LF 624004 STRIP SEAL GLAND, 2" LF 624005 STRIP SEAL GLAND, 3" LF 624006 STRIP SEAL GLAND, 4" LF 624007 STRIP SEAL GLAND, 5" LF 624009 ASPHALTIC PLUG JOINT LF 624010 SILICONE JOINT SEAL, 1" LF 624011 SILICONE JOINT SEAL, 2" LF 624012 SILICONE JOINT SEAL, 3" LF 624013 COMPRESSION SEAL, 1" LF 624014 COMPRESSION SEAL, 2" LF 624015 COMPRESSION SEAL, 3" LF 624016 COMPRESSION SEAL, 4" LF 624017 SILICONE COATED JOINT SEAL, 1 " LF 624018 SILICONE COATED JOINT SEAL, 2 " LF 624019 SILICONE COATED JOINT SEAL, 3 " LF 624020 SILICONE COATED JOINT SEAL, 4 " LF 624021 CLOSED -CELL JOINT SEAL, 1 " LF 624022 CLOSED -CELL JOINT SEAL, 2 " LF 624023 CLOSED -CELL JOINT SEAL, 3 " LF
CONCRETE OVERLAYS SECTION 625 325 SECTION 625 — CONCRETE OVERLAYS
625.1Description.
This work consists of providing materials and constructing a concrete overlay on concrete deck surfaces.
625.2Materials.
625.3Construction.
625.3.1 Pre -Construction. Schedule a pre -construction meeting 14 calendar days in advance of starting construction for all overlay types. 625.3.2 Submittals. Provide required submittals for the applicable overlay system 14-days prior to the pre -construction meeting.
Submit a Construction plan that includes:
application.
travel lanes.