834011 POLE BASE, TYPE 6 EACH

DE · 2025 Standard SpecificationsBook pages 510512View official source ↗

CABINET BASES SECTION 835

500 SECTION 835 — CABINET BASES

835.1Description.

This work consists of constructing cabinet bases.

835.2Materials.

A.Ground Rods and Clamps Section 833
B.Delaware Stone, No. 57 Section 1004
C.PCC, Class B Section 1022
D.Liquid Membrane -Forming Compounds for Curing Section 1045.7
E.Hex Bolts, Stainless Steel Section 1039
F.Drop -in Anchors, Zinc Plated or Stainless -Steel Section 1039

Manufactured by Hilti systems, concrete fastening systems, or approved equal

G.Conduit Sweeps, PVC Schedule 80 Section 1062

835.3Construction.

A.Construct cabinet base in accordance with the contract.
1.When excavating the area for the cabinet base, do not exceed the dimension of the base

foundation by more than 12 -inches in any direction.

2.When placing a base in existing concrete pavement or sidewalk, saw cut the concrete in a

square pattern or remove the concrete to the nearest joint.

3.Stockpile excavated material on the site until completion of backfilling.
4.Place the cabinet base stone to a depth of 6 -inches or as directed by the engineer.
5.Excavate additional space for the required concrete apron and place stone in the extended area

when placing the base in an unpaved area.

6.Set the ground rod as shown in accordance with the Standard Construction Details and in

accordance with Section 833. Drive the ground rod a minimum of 8 feet into soil through a 2 -inch PVC sleeve.

B.Set conduit sweeps as shown in the contract.
1.Drive the PVC sleeve for the ground rod into the ground so that the top of the sleeve is 2 -inches

above the base concrete when poured.

2.Place forms to the full depth for the base and install conduit sweeps in accordance with the

Standard Construction Details .

3.Use conduit 90 -degree sweeps with elbows having a 24 -inch radius.
4.Leave a minimum of 2-inches and a maximum of 4-inches of conduit exposed above finished pad

grade.

5.Connect conduit sweeps to the existing conduit in accordance with the contract. Cap unused

conduit sweeps with tape. Mark the direction of the conduit run the sweep is connected to on the base with arrows drawn in the wet concrete within 6 -inches of outer edge of the base. CABINET BASES SECTION 835

501 C. Pour concrete for cabinet base and any required concrete aprons. Set drop -in anchors. Level, edge, and broom finish. Cure exposed concrete surface with materials in accordance with Section 1022.6 . Remove forms and conduit plugs after setting for 2 calendar days . Backfill around the cabinet base and dispose of excess material. Fill and tamp the area between the form and excavated area on all sides.

835.4Method of Measurement.

The Department will measure the quantity of cabinet bases as the number of bases placed and accepted.

835.5Basis of Payment.

A.The Department will pay the accepted quantities of cabinet bases constructed and accepted at the

contract unit price per each. Price and payment constitutes full compensation for:

1.Providing and placing all materials;
2.curing and finishing concrete;
3.conduits extending into the cabinet base; and
4.removing or replacing pavement underneath the cabinet base.

ITEM DESCRIPTION UNIT 835001 CABINET BASE TYPE F EA 835002 CABINET BASE TYPE M EA 835003 CABINET BASE TYPE P EA 835004 CABINET BASE TYPE R EA TRAFFIC SIGNAL POLES AND MAST ARMS SECTION 836

502 SECTION 836 — TRAFFIC SIGNAL POLES AND MAST ARMS

836.1Description.

This work consists of installing, relocating, or removing steel poles, pedestal poles, and mast arm assemblies on existing pole bases.

836.2Materials.

A.The Department will provide steel mast arms, steel poles, pedestal poles, and all necessary

hardware, unless otherwise indicated in the contract.

B.Where pole relocation is part of the contract, re -use the existing pole and hardware, unless

otherwise indicated in the contract.

C.Non -Shrink Grout Section 1047.2

836.3Construction.

836.3.1 Installation.

A.Notify the engineer 2 working days in advance to obtain the materials from the Department. Pick

up the materials at the DelDOT Sign Shop.

B.Assemble steel poles and mast arms. Before erecting a pole, ensure that the anchor bolt is

revealed per the manufacturer’s specifications and Standard Construction Details. Notify the engineer if the existing anchor bolts do not meet this criteria and wait for instructions. Do not erect the pole until directed.

C.Identify aerial utilities within the area and coordinate the work with the owner of the utility.

Install poles at least 10 -feet below or 10 -feet away from primary electric cables.

D.Remove conduit caps or knockouts from the conduit that extend from the pole base.
E.Install insulated grounding bushings.
1.Install a #6 AWG copper ground wire between the 3/4 -inch ground rod clamp and the insulated

grounding bushing and attach to the lug or stud in the metal pole or pedestal.

2.Continue the #6 AWG copper ground wire, on multi -section steel camera poles, to the top of the

upper section of the pole from the insulated grounding bushing to a bonding lug attached to the camera mounting bolts.

3.Do not install or temporarily place the #6 AWG copper ground wire between the leveling nut

and the pole.

F.Raise steel pole or pedestal pole into position.
1.Place pole on the anchor bolts. Hold the pole in place until completing installation and

tightening of the anchor bolt the nuts.

2.Use a nut under the base of the pole and a nut above the base of the pole on all steel pole

installations.

3.Adjust and tighten the anchor bolt nuts once the pole is set, to position the pole in accordance

with the contract.

4.Connect the ground wire.
Source: Delaware Standard Specifications for Road and Bridge Construction, 2025 Edition. Pages 510512 of 779.