GRADED AGGREGATE BASE COURSE SECTION 301 129 B. If the contractor generates recycled GABC from materials milled or excavated under other items in the contract, the Department will make payments under the milling or excavating items and the GABC item. ITEM DESCRIPTION UNIT
2 GABC PATCHING CY 3 GABC TON 4 GABC PATCHING TON 5 RECYCLED CONCRETE AGGREGATE CY 6 RECYCLED ASPHALT PAVEMENT CY 7 RECYCLED CONCRETE AGGREGATE TON 8 RECYCLED ASPHALT PAVEMENT TON STONE SECTION 302 130 SECTION 302 — STONE
302.1Description .
This work consists of providing, placing, and compacting stone.
302.2Materials.
302.3Construction.
prevent segregation.
302.4Method of Measurement.
The Department will measure stone as the number of tons of stone placed and accepted. The Department will determine weight in accordance with Section 109.1.
302.5Basis of Payment.
The Department will pay for stone at the contract unit price per ton. Price and payment constitute full compensation for preparing, providing, placing, and compacting all materials. ITEM DESCRIPTION UNIT 302002 DELAWARE NO. 3 STONE TON 302003 DELAWARE NO. 8 STONE TON 302004 DELAWARE NO. 10 STONE TON 302005 DELAWARE NO. 57 STONE TON