GEOTEXTILES SECTION 708 366 SECTION 708 — GEOTEXTILES
708.1Description.
This work consists of furnishing and placing geotextiles.
708.2Materials.
Geotextile Section 1060
708.3Construction.
adjacent swaths of fabric a minimum of 12 -inches.
fabric uncovered for more than 2 -weeks.
708.4Method of Measurement.
The Department will measure the quantity of geotextile as the number of square yards for each type of geotextile placed and accepted. The Department will determine the quantity by computations based on field measurements taken along the outside perimeter o f the area covered by the geotextile.
708.5Basis of Payment.
The Department will pay the quantity of geotextile at the contract unit price per square yard. Price and payment will constitute full compensation for providing and placing all materials. ITEM DESCRIPTION UNIT 708001 GEOTEXTILES, STABILIZATION SY 708002 GEOTEXTILES, SEPARATION SY 708003 GEOTEXTILES, RIPRAP SY UNDERDRAINS SECTION 709 367 SECTION 709 — UNDERDRAINS
709.1Description.
This work consists of furnishing and constructing underdrains.
709.2Materials.
0.063 -inch diameter galvanized steel wires.
709.3Construction.
lateral connections to the pipe with connectors recommended by the manufacturer.
satisfaction of the engineer.
Use Borrow, Type C material at least 1 -foot over the underdrain outlet pipe. The contractor may use excavated material for backfill above any of the Borrow, Type C in areas outside of the roadway and shoulders, provided that the excavated material meets Borrow, Type F.
material. If placing guardrail within 3 -feet of the underdrain, video that section of the underdrain after guardrail installation.
709.4Method of Measurement .
709.4.1 Perforated Pipe. The Department will measure the quantity of perforated pipe underdrains from end -to-end as the linear feet of pipe completed and accepted. 709.4.2 Underdrain Outlet Pipe. The Department will measure the quantity of underdrain outlet pipe from end -to-end as the linear feet of pipe completed and accepted.