Electrical (16000-16999)

839001 PROVIDE AND INSTALL WOOD POLE EACH

DE · 2025 Standard SpecificationsBook pages 526528View official source ↗

DOWN GUYS AND ANCHORS SECTION 840

516 SECTION 840 — DOWN GUYS AND ANCHORS

840.1Description.

This work consists of providing, placing, relocating, or removing down guys and anchors.

840.2Materials.

A.Guys and Anchors Section 1077

840.3Construction.

A.Provide and Place Down Guys and Anchors.
1.Provide all materials to place down guys and anchors.
2.Drive anchors at a 45 -degree angle away from the pole into firm and undisturbed ground. Drive

the anchor until no more than 6 -inches of the rod, including the eye, remains above ground.

3.Attach the down guy or sidewalk guy wire to the pole at the location on the pole determined by

the engineer. Install the guy wire in accordance with applicable electrical and safety codes.

4.Install the strain insulator based on field conditions as determined by the engineer. Install the

strain insulator no less than 8 feet above the ground, if the guy is broken below the insulator. Install a guy wire protector with the bottom at ground level and anchored to the guy wire. Bond the guy wire to the wood pole ground.

B.Relocate Down Guys and Anchors.
1.When moving the location of a down guy or a sidewalk guy and the associated anchor, keep the

guy attached to the pole while changing the anchor location.

2.Salvage as much of the existing guy as possible.
3.Submit the down guy or the sidewalk guy relocation method to the engineer for approval.
C.Down Guy and Anchor Removal.

Submit the anchor and the down guy or the sidewalk guy removal method to the engineer for approval.

D.Providing and Placing Overhead Guys.
1.Provide and place overhead guys in accordance with applicable electrical and safety codes.
2.Install a strain insulator based on field conditions and as directed by the engineer. Install the

strain insulator at a location such that the strain insulator is no less than 8 -feet above the ground, if the guy is broken below the insulator. Bond each end of the guy to the wood pole ground.

E.Relocating Overhead Guys.

Submit the overhead guy relocation method to the engineer for approval.

F.Overhead Guy Removal.

Submit the overhead guy removal method to the engineer for approval. DOWN GUYS AND ANCHORS SECTION 840

517 840.4 Method of Measurement. The Department will measure the quantity of anchors and down guys, sidewalk guys, or overhead guys as the number provided and placed, relocated, removed, and accepted.

840.5Basis of Payment.

A.The Department will pay for anchors and down guys, sidewalk guys or overhead guys provided,

placed, and accepted at the contract unit price. Price and payment constitute full compensation for all work to complete the item. The Department considers bondi ng of the guys as incidental to the item and will make no separate payment for bonding

B.The Department will pay for relocating anchors and down guys, sidewalk guys or overhead guys at

the contract unit price. Price and payment constitute full compensation for all work to complete the item.

C.The Department will pay for removed anchors and down guys or sidewalk guys at the contract

unit price. Price and payment constitute full compensation for work to complete the item. ITEM DESCRIPTION UNIT 840001 PROVIDE AND INSTALL DOWN GUY AND ANCHOR EACH 840002 PROVIDE AND INSTALL OVERHEAD GUY EACH 840003 RELOCATION OF DOWN GUY AND ANCHOR EACH 840004 RELOCATION OF OVERHEAD GUY EACH 840005 REMOVAL OF DOWN GUY AND ANCHOR EACH 840006 REMOVAL OF OVERHEAD GUY EACH WEATHERHEADS SECTION 841

518 SECTION 841 — WEATHERHEADS

841.1Description.

This work consists of providing and installing weatherheads.

841.2Materials.

A.Close Nipple Section 1062
B.Lock Nut Section 1062
C.Conduit Bushing – Plastic Conduit Bushing or Insulated Bushing.

841.3Construction.

A.Use a hole saw to drill a hole 6 -inches from the top of the steel pole on the side parallel with the

span cable.

B.Install the weatherhead on a close nipple.
C.Place a lock nut on the nipple and then place the assembly through the hole drilled into the steel

pole.

D.Use a bushing on the end of the nipple inside the steel pole, when placing the weatherhead

assembly.

E.Tighten the lock nut against the outside of the steel pole to hold the complete assembly in place.

841.4Method of Measurement.

The Department will measure the quantity of weatherheads as the number provided, installed, and accepted.

841.5Basis of Payment.

The Department will pay for weatherheads at the contract unit price per each. Price and payment constitute full compensation for providing and installing the weatherheads, including all hardware. ITEM DESCRIPTION UNIT 841001 PROVIDE AND INSTALL WEATHERHEAD, UP TO 3”, ON STEEL POLE EACH

Source: Delaware Standard Specifications for Road and Bridge Construction, 2025 Edition. Pages 526528 of 779.