DOWN GUYS AND ANCHORS SECTION 840
516 SECTION 840 — DOWN GUYS AND ANCHORS
840.1Description.
This work consists of providing, placing, relocating, or removing down guys and anchors.
840.2Materials.
840.3Construction.
the anchor until no more than 6 -inches of the rod, including the eye, remains above ground.
the engineer. Install the guy wire in accordance with applicable electrical and safety codes.
strain insulator no less than 8 feet above the ground, if the guy is broken below the insulator. Install a guy wire protector with the bottom at ground level and anchored to the guy wire. Bond the guy wire to the wood pole ground.
guy attached to the pole while changing the anchor location.
Submit the anchor and the down guy or the sidewalk guy removal method to the engineer for approval.
strain insulator at a location such that the strain insulator is no less than 8 -feet above the ground, if the guy is broken below the insulator. Bond each end of the guy to the wood pole ground.
Submit the overhead guy relocation method to the engineer for approval.
Submit the overhead guy removal method to the engineer for approval. DOWN GUYS AND ANCHORS SECTION 840
517 840.4 Method of Measurement. The Department will measure the quantity of anchors and down guys, sidewalk guys, or overhead guys as the number provided and placed, relocated, removed, and accepted.
840.5Basis of Payment.
placed, and accepted at the contract unit price. Price and payment constitute full compensation for all work to complete the item. The Department considers bondi ng of the guys as incidental to the item and will make no separate payment for bonding
the contract unit price. Price and payment constitute full compensation for all work to complete the item.
unit price. Price and payment constitute full compensation for work to complete the item. ITEM DESCRIPTION UNIT 840001 PROVIDE AND INSTALL DOWN GUY AND ANCHOR EACH 840002 PROVIDE AND INSTALL OVERHEAD GUY EACH 840003 RELOCATION OF DOWN GUY AND ANCHOR EACH 840004 RELOCATION OF OVERHEAD GUY EACH 840005 REMOVAL OF DOWN GUY AND ANCHOR EACH 840006 REMOVAL OF OVERHEAD GUY EACH WEATHERHEADS SECTION 841
518 SECTION 841 — WEATHERHEADS
841.1Description.
This work consists of providing and installing weatherheads.
841.2Materials.
841.3Construction.
span cable.
pole.
assembly.
841.4Method of Measurement.
The Department will measure the quantity of weatherheads as the number provided, installed, and accepted.
841.5Basis of Payment.
The Department will pay for weatherheads at the contract unit price per each. Price and payment constitute full compensation for providing and installing the weatherheads, including all hardware. ITEM DESCRIPTION UNIT 841001 PROVIDE AND INSTALL WEATHERHEAD, UP TO 3”, ON STEEL POLE EACH