SPAN WIRE AND MESSENGER WIRE SECTION 838
509 SECTION 838 — SPAN WIRE AND MESSENGER WIRE
838.1Description.
This work consists of providing, placing, transferring, adjusting, relocating, or removing span wire, messenger wire, and associated attachments.
838.2Materials.
838.3Construction.
838.3.1 Span Wire.
will specify the tension of the installed span wire and the attachment height. Apply tension to the span wire using a tensioning device with a minimum capacity of 6,000 -pounds pull.
from traffic, in accordance with the Standard Construction Details .
from traffic, in accordance with the Standard Construction Details .
based on field conditions and as directed by the engineer. Equip each span with 2 strain insulators unless otherwise directed by the engineer. Install t he strain insulator no less than 8 feet above the ground if the span wire is broken below the insulator.
with the end of the span wire extending back parallel with the span. Do not allow the span wire to cross over or overlap itself on the pole.
and place the second clamp 1 -inch away from the first.
with a service sleeve.
the doubled back span wire to the other span wire using 2 galvanized guy clamps placed end -to- end at a distance of 1 -foot from the strain insulator. Extend the end of the span wire at least 3 - feet from the last clamp and secure the span wire with a service sleeve.
achieve the tension in accordance with the contract. Use the tensioning device on the end of the span farthest from the strain insulator. Wrap and clamp the wire in the same manner as described above in steps 1 and 2. Extend the end of the span wire at least 3 -feet from the last clamp and secure the span wire with a service sleeve. SPAN WIRE AND MESSENGER WIRE SECTION 838
510 838.3.2 Dead End Messenger Wire Attachment.
with washers on each end.
on the back of the pole instead of the back washer. Tighten the nut on the eyebolt assembly enough to compress the down guy attachment. Install the second nut to act as a lock nut. Attach the service wedge clamp and messenger wire to the eyebolt.
extending back parallel with the messenger wire run. Do not allow the span wire to cross over or overlap itself on the pole. Place 2 galvanized clamps on the messenger wire end, in accordance with the Standard Construction Details .
messenger wire with a service sleeve. 838.3.3 Intermediate Messenger Wire Attachment.
messenger wire and tighten the outside 2 clamp bolts.
the washer. Tighten with a nut. Install a second nut as a lock nut.
the #4 split -bolt connector onto the wood pole ground wire. Install a #6 AWG solid copper wire between the parallel groove connector and the split -bolt connector and tighten all hardware.
on the back of the pole instead of the back washer, if a down guy assembly is shown in the plans or directed to be installed by the engineer. Tighten the nut on the eyebolt assembly enough to compress the down guy attachment. Install the second nut to act as a lock nut.
the contract.
the #4 split -bolt connector onto the wood pole ground wire. Install a #6 AWG solid copper wire between the parallel groove connector and the split -bolt connector and tighten all hardware. 838.3.4 Adjusting Span or Messenger Wire. SPAN WIRE AND MESSENGER WIRE SECTION 838
511 A. Adjust existing span or messenger wire including tightening, raising and tightening, loosening, or other work, only as directed by the engineer.
Tap the span or messenger wire to the designed height after removing tension.
of the span or messenger wire and the span and tighten. After reaching the designed tension, re - tighten the 3 -bolt guy clamps and remove tensioning devices. Adjust the span bonding jumper as required. The engineer will decide if adjustment is needed at both ends of 1 span to tighten or raise and tighten the span or messenger wire.
span or messenger wire beyond the strain insulator. Loosen or remove the two, 3 -bolt guy clamps. Adjust the span bonding jumper as required. 838.3.5 Relocating of Messenger Attachment. Drill a hole in the existing pole. Take care that the cable and attachment raised or lowered and installed using the same hardware on the same pole location does not require removal of the wire from the messenger. Adjust the messenger bonding jumper as required. 838.3.6 Transfer of Existing Span or Messenger Attachment. Drill a hole in the new pole. Move the cable and attachment to the new pole and install using the hardware from the original pole. Provide additional hardware if needed to attach the span or messenger to the new pole. Reattach the messenger bonding jumper to the new pole ground wire. 838.3.7 Removing Messenger Wire, Cable, and Hardware.
messenger wire in place between poles. This item does not apply to removing a cable from a messenger wire that remains in place or removing a messenger wire with no attached cable.
messenger wire to the ground after removing the clamps and releasing the remaining tension. Detach the cable that is lashed or taped to the messenger wire.
838.4Method of Measurement.
center of pole or structure the wire is attached to and accepted. The Department will not measure span wire wrapped around the pole or structure.
made to a pole and accepted. The Department will measure down guy assemblies in accordance with Section 840.
accepted.
transferred and accepted. SPAN WIRE AND MESSENGER WIRE SECTION 838
512 6. Messenger wire removed and returned as the number of linear feet of messenger wire with attached cable removed and returned to the DelDOT Sign Shop.
838.5Basis of Payment.
Price and payment constitute full compensation for providing and placing span wire and all related hardware. The Department will consider the following as included in the pay item and will make no separate payment for:
messenger wire attachments made to a pole and accepted at the contract unit price. Price and payment will constitute full compensation for providing the messenger wir e attachment hardware and attaching the wire to a wood or steel pole. The Department will pay for down guy assemblies in accordance with Section 840.
contract unit price. Price and payment will constitute full compensation for tightening, raising, or loosening the span or messenger wire. The Department will make no separate payment for removing or installing tape on a span to clear a path for tensioning devices.
accepted at the contract unit price. Price and payment constitute full compensation for all work and materials required to relocate messenger attachments.
and accepted at the contract unit price. Price and payment constitute full compensation for all work and materials required to transfer span or messenger attachments.
at the contract unit price. Price and payment constitute full compensation for all work and materials required to remove and dispose of messenger wire, cable, and attachments. ITEM DESCRIPTION UNIT 838001 PROVIDE AND INSTALL SPAN WIRES, 7/16” LF 838002 PROVIDE AND INSTALL SPAN WIRES, 1/4” LF 838003 PROVIDE AND INSTALL DEAD END MESSENGER WIRE ATTACHMENT EACH 838004 PROVIDE AND INSTALL INTERMEDIATE MESSENGER WIRE ATTACHMENT EACH 838005 PROVIDE AND INSTALL ANGULAR INTERMEDIATE MESSENGER WIRE EACH 838006 ADJUSTMENT OF SPAN OR MESSENGER WIRE EACH 838007 RELOCATION OF MESSENGER ATTACHMENT EACH 838008 TRANSFER OF EXISTING SPAN OR MESSENGER ATTACHMENTS EACH SPAN WIRE AND MESSENGER WIRE SECTION 838
513 ITEM DESCRIPTION UNIT 838009 REMOVAL OF MESSENGER WIRE, CABLE AND HARDWARE LF