TEMPORARY IMPACT ATTENUATOR SECTION 809
448 G. The Department will pay for replacing sand crash cushion barrel at the contract unit price per EACH. Price and payment constitute full compensation for:
ITEM DESCRIPTION UNIT 809001 INSTALL TEMPORARY IMPACT ATTENUATOR EACH 809002 PROVIDE TEMPORARY IMPACT ATTENUATOR – GATING, NON -REDIRECTIVE, TEST - LEVEL 2 EACH 809003 PROVIDE TEMPORARY IMPACT ATTENUATOR – GATING, NON -REDIRECTIVE, TEST - LEVEL 3 EACH 809004 PROVIDE TEMPORARY IMPACT ATTENUATOR – NON -GATING, REDIRECTIVE, TEST - LEVEL 2 EACH 809005 PROVIDE TEMPORARY IMPACT ATTENUATOR – NON -GATING, REDIRECTIVE, TEST - LEVEL 3 EACH 809006 RELOCATE TEMPORARY IMPACT ATTENUATOR EACH 809007 PROVIDE SAND CRASH CUSHION BARREL EACH 809008 INSTALL SAND CRASH CUSHION BARREL EACH 809009 RELOCATE SAND CRASH CUSHION BARREL EACH 809010 REPLACE SAND CRASH CUSHION BARREL EACH 809011 PROVIDE TEMPORARY IMPACT ATTENUATOR - WIDE BAY, NON -GATING, REDIRECTIVE , TEST -LEVEL 2 EACH 809012 PROVIDE TEMPORARY IMPACT ATTENUATOR - WIDE BAY, NON -GATING, REDIRECTIVE , TEST -LEVEL 3 EACH TEMPORARY WARNING SIGNS SECTION 810
449 SECTION 810 — TEMPORARY WARNING SIGNS
810.1Description.
This work consists of fabricating, providing, placing, relocating, maintaining, and removing temporary warning signs.
810.2Materials.
accordance with Section 801.2.
Highway Signs Book . If a conflict exists between the DE MUTCD , the contract, and the FHWA Standard Highway Signs Book , the contract takes precedence.
with the requirements of the DE MUTCD .
letters in accordance with Section 801.2.
with Section 801.2
equivalent.
810.3Construction.
Mount temporary signs facing traffic on ground -mounted sign posts when the signs are intended for more than 3 consecutive calendar days of use.
calendar days, in the following situations:
median of a divided highway or other similar locations.
and it is not possible to make field adjustments to the sign location. Provide documentation of the conflict to the engineer before using the temporary sign stand.
contract. If there is a discrepancy between field conditions and what the contract shows, including the presence of other regulatory, warning, or guide signs, adjust placeme nt of the sign with the engineer’s approval.
top of the roadway or sidewalk surface.
taking place at the time.