B
HomeLibrariesCopilotSearchProjectsBookmarks
FeedbackHelp Desk
Libraries
Building Codes
Code LibraryIBC — BuildingIRC — ResidentialIFC — FireIPC — PlumbingIMC — MechanicalIFGC — Fuel GasIECC — EnergyNEC — ElectricalModel Codes
Specifications
CSI SpecificationsDOT SpecsTransit SpecsUSACE
Standards
TransportationRailroadFire SafetyAccessibilityStructural
Tools & References
DiagramsAssembliesProductsCalculatorsChecklistsPermits
PricingLog in
Electrical (16000-16999)

705001 PCC SIDEWALK, 4” SF

DE · 2025 Standard SpecificationsBook pages 370371View official source ↗

PCC SIDEWALK, PEDE STRIAN CONNECTIONS, SECTION 705 AND DETECTABLE WARNING SURFACE 360 705012 DIRECTIONAL TACTILE SURFACE INDICATORS SF 705013 TRUNCATED DOME DETECTABLE WARNING SURFACE SF MONUMENT SECTION 706 361 SECTION 706 — MONUMENT

706.1Description.

This work consists of setting PCC monuments and capped rebar right -of-way markers.

706.2Materials.

A.PCC, Class B Section 1022
B.Bar Reinforcement Section 1037
C.Aluminum 2 -Inch Flat Survey Marker
D.Monument Delineators
1.Wood Section 1041
2.Flexible Delineator Section 1073 .4

706.3Construction.

A.Monuments.
1.The engineer will provide the exact monument and right -of-way marker locations, set by a

Delaware professional land surveyor, in accordance with the contract.

2.Place monuments vertically in excavated holes at the depths shown in the contract, with 2 sides

approximately parallel with the roadway. Place backfill material in layers and firmly tamp without disturbing the location set by the surveyor.

3.Take care not to break or damage monuments when removing and resetting.
4.Replace broken or damaged monuments in kind.
5.Install delineators as required by the contract.
B.Capped Rebar Right -of-way Markers.
1.Place capped rebar right -of-way markers in accordance with the contract.
2.Place rebar vertically at the depth shown in the contract.
3.Place aluminum 2 -inch flat survey markers on rebar taking care not to move the rebar location.
4.Install delineators as required by the contract.
C.Right of Way Marker Delineators
1.Place flexible delineators as indicated in the contract.
2.Install flexible delineators in accordance with manufacturer recommendations to a final top

elevation of no less than 36-inches as measured from the ground surface elevation.

a.Do not install delineators in frozen ground.
3.Affix vertical lettering to the top portion of the delineator.

706.4Method of Measurement.

Source: Delaware Standard Specifications for Road and Bridge Construction, 2025 Edition. Pages 370371 of 779.