PCC PATCHING, PARTIAL DEPTH SECTION 505 161 SECTION 505 — PCC PATCHING , PARTIAL DEPTH
505.1Description.
This work consists of partial depth patching of PCC.
505.2Materials.
505.3Construction.
Provide a flatwork technician with an ACI or NRMCA certification, or a certification from another program pre -approved by the Department, to supervise all concrete finishing work. Provide the flatwork certification to the engineer before placing concrete. 505.3.1 Preparation and Placement.
the patch area to provide a vertical face at the edge. Break and remove concrete within the patch area to a depth required until sound and clean concrete is ex posed. Avoid fracturing the sound concrete below the patch and undercutting or spalling the patch boundaries during the concrete removal operation.
slab, place an insert, styrofoam, wax-based bond breaker or other approved bond -breaking medium to maintain existing joint dimensions.
material. 505.3.2 Joints.
unobstructed.
achieved, if no overlay is planned in accordance with Section 504. 505.3.3 Concrete Strength Requirements.
material in accordance with the manufacturer’s recommendations. The contractor may open the patch area to traffic once the patch material reaches a compressive strength equal to or greater than 2,000 -psi. Use only rapid cured concrete that will reach a compressive strength of 2,000 -psi in 6-hours or less.
strength in the desired timeframe, then reschedule the work, subject to the approval of the engineer. PCC PATCHING, PARTIAL DEPTH SECTION 505 162 505.4 Method of Measurement. The Department will consider the quantity placed and accepted, as measured in the field by the square yard and multiplied by the depth in inches, as the measurement.
505.5Basis of Payment.
square yard per inch. Payment constitutes full compensation for:
outside the limits approved by the engineer.
to this item and will make no separate payment for this work. ITEM DESCRIPTION UNIT 505000 PCC PATCHING, PARTIAL DEPTH SY-IN
PIPE CULVERTS SECTION 601 163 DIVISION 600 — STRUCTURES
601.1Description.
This work consists of providing and placing pipe culverts, flared end sections, and connections to existing drainage inlets and manholes.
601.2Materials.
601.3Construction.
601.3.1 Preconstruction Inspection. The Department will review all existing pipes for use in the final drainage system and will discuss the system condition with the contractor before starting construction. 601.3.2 Excavation and Pipe Bedding.
Section 207 and the Standard Construction Details. Class C bedding is to be used in accordance with the Standard Construction Details unless specified otherwise. When Class A bedding is specified, cure PCC with materials in accordance with Section 1022.6 . Remove unsuitable material encountered below the proposed pipe bedding and replace as directed by the engineer in accordance with Section 207.
constructed, create a fill area for the pipe a minimum width of 2 pipe diameters on each side of the pipe and 18 -inches over the top of the pipe. If the embankment finished elevation is less than 18-inches above the pipe, build the fill to the finished elevation. Once the fill area is created, trench for pipe placement. 601.3.3 Reinforced Concrete Pipe.
of each pipe as follows: