Electrical (16000-16999)

823001 INSTALLATION OF SIGN ON SPAN WIRE OR MAST ARM SF

DE · 2025 Standard SpecificationsBook pages 484486View official source ↗

DELINEATORS SECTION 824

474 SECTION 824 — DELINEATORS

824.1Description.

This work consists of providing, installing, relocating, maintaining, and replacing high -performance flexible plastic, post -mounted delineation devices , or delineators mounted on posts or barriers.

824.2Materials.

A.Delineators Section 1073

824.3Construction.

A.High Performance Flexible Plastic Tubular Markers.
1.Provide and place high performance flexible plastic tubular markers meeting the requirements

of the DE MUTCD , and in accordance with the Contract.

2.Remove loose debris from the road surface in the application area.
3.Install and anchor delineators on dry asphalt or concrete surfaces in accordance with the

manufacturer’s instructions. Ensure that the installation method allows for easy replacement of future damaged delineators.

4.Replace damaged delineators within 24 -hours of notification by the engineer.
B.Post -Mounted Delineators.
1.Provide post -mounted delineators meeting the requirements of the DE MUTCD and the

Standard Construction Details, and in accordance with the contract.

2.Submit 2 samples each of the posts, brackets, connecting devices, and driving heads complete

with reflector units.

3.Ship materials to the construction site only after submission of samples and written approval of

the samples from the engineer.

4.Include steel posts and each color of delineator planned for use.
5.Whenever delineators require special keys, wrenches, or locking instruments to remove, place,

maintain, or repair, provide the specialty tools to the engineer. Provide 1 special key, wrench, or locking instrument for each 500 delineators or a portion of 500 delineators.

6.Install post mounted delineators in accordance with the manufacturer’s instructions.
7.Replace damaged delineators within 24 -hours of notification by the engineer.
C.Barrier Mounted Delineators.
1.Install high impact barrier mounted delineators onto permanent PCC barrier.
2.Space the delineators longitudinally in accordance with the DE MUTCD .
3.Install delineators at a height of 29 -inches, measured from the roadway surface to the top of the

delineator.

4.Attach delineators to the traffic side of the PCC barrier wall face in accordance with the

manufacturer’s instructions.

5.Replace damaged delineators within 24 -hours of notification by the engineer.

DELINEATORS SECTION 824

475 D. Flexible Delineators

1.Place flexible delineators as indicated in the contract.
2.Install flexible delineators in accordance with manufacturer recommendations to a final top

elevation of no less than 36-inches as measured from the ground surface elevation .

a.Do not install delineators in frozen ground .
3.Affix vertical lettering to the top portion of the flexible delineator in accordance with the contract.

824.4Method of Measurement.

The Department will measure the quantity of delineators as the number of delineators installed and accepted.

824.5Basis of Payment.

A.The Department will pay the quantity of delineators at the contract unit price per each. Price and

payment constitute full compensation for providing and installing delineators.

B.The Department will pay for replacement of each damaged delineator at the contract unit bid

price after the engineer verifies the replaced quantity. Price and payment constitute full compensation for removing damaged delineators and providing and instal ling new delineators. ITEM DESCRIPTION UNIT 824001 BARRIER MOUNTED DELINEATOR EACH 824002 POST MOUNTED DELINEATORS EACH 824003 FLEXIBLE DELINEATORS EACH 824005 TUBULAR MARKER , WHITE, 28” EACH 824006 TUBULAR MARKER , WHITE, 36” EACH 824007 TUBULAR MARKER , YELLOW, 28” EACH 824008 TUBULAR MARKE R , YELLOW, 36” EACH 824009 TUBULAR MARKER , ORANGE, 28” EACH 824010 TUBULAR MARKER , ORANGE, 36” EACH PERMANENT WOOD BARRICADE SECTION 826

476 SECTION 826 — PERMANENT WOOD BARRICADE

826.1Description.

This work consists of providing, constructing, and placing pressure treated wood barricades.

826.2Materials.

A.Wood Section 621; Section 1041
B.Sign Panels Section 818
C.Galvanized Hardware Section 1041.5

826.3Construction.

A.Fabricate permanent barricade using No. 1 common yellow pine or fir Surfaced 4 Sides (S4S), in

accordance with the DE MUTCD and the contract.

B.Treat sides, bottoms, and tops of the wood posts and rails with a preservative treatment in

accordance with Section 1041.

C.Install retroreflective sheeting and sign panels with a minimum sheet panel thickness of 1/8 -inch

for the object markers in accordance with the DE MUTCD and the contract.

D.Excavate post holes.
E.Place posts into the excavated holes in accordance with the contract.
F.Backfill as necessary and dispose of unneeded material in accordance with Section 106.8.
G.Grade area as required by the engineer.

826.4Method of Measurement.

The Department will measure the quantity of permanent wood barricades as the number of permanent wood barricades fabricated, placed, and accepted.

826.5Basis of Payment.

A.The Department will pay the quantity of permanent wood barricades at the contract unit price per

each. Price and payment constitute full compensation for:

1.Providing and placing all materials;
2.reflective sheeting;
3.sheet aluminum sign panels;
4.preservative treatment; and
5.excavating and backfilling.
B.The Department considers sign panels for the permanent wood barricade and object markers as

incidental to this item. ITEM DESCRIPTION UNIT 826001 PERMANENT WOOD BARRICADE EA

Source: Delaware Standard Specifications for Road and Bridge Construction, 2025 Edition. Pages 484486 of 779.