301.01 Des cription.
Division 300
SECTION 301 SOIL, SOIL AGGREGATE, AND AGGREGATE, BASE AND SUBBASES
301.01 Description.
301.02 Materials.
All materials furnished for use shall comply with the requirements of the applicable sections of
Division 800 — , Materials, except as modified by the plans or proposal.
Attention is directed to: • Section 807 Water • Section 815 Cement • Section 817 Lime for Roadbed & Base Stabilization • Section 820 Selected Materials for Bases • Section 821 Granular Soil Materials • Section 822 Drainage Plane Materials • Section 823 Soil Aggregate Materials • Section 824 Processed Reef Shell Base Materials • Section 825 Crushed Aggregate Base Materials Preliminary tests o f optional sources shown on the plans indicate that the materials from these sources will meet plan requirements, either in their natural composition or by blending with additional material. However, whether sources are shown on the plans or not, the Contr actor shall supply whatever components are needed, in whatever proportions are necessary, to meet specified requirements of the plans and specifications for the item complete in place. The processed materials, in addition to complying with the requirements noted above, must be capable of being compacted to the density requirements noted in this Section. Any material furnished, regardless of compliance with all other requirements, which cannot be compacted to the densities specified shall be either removed a nd replaced with more suitable material, or corrected. Testing of material will be as provided in Article 301.05.